10-meter Interferometer Results M. Woods (special thanks to Steve Myers and Tim Slaton) Jan. 31, 2000 Commissioning Setup System Noise Monte Carlo simulation.

Slides:



Advertisements
Similar presentations
Gravitational Wave Astronomy Dr. Giles Hammond Institute for Gravitational Research SUPA, University of Glasgow Universität Jena, August 2010.
Advertisements

One Arm Cavity M0 L1 L2 TM M0 L1 L2 TRIPLE QUAD 16m R = 20m, T=1% R = ∞, T=1%  Optimally coupled cavity (no mode matched light reflected back)  Finesse.
April 27th, 2006 Paola Puppo – INFN Roma ILIAS Cryogenic payloads and cooling systems (towards a third generation interferometer) part II: the Vibration.
RF / Laser Timing for 5/20/14 Frisch. Requirements, Jitter and Drift Looking for 100fs Pk-Pk measurements – 30fs RMS. (state of the art) Jitter:
1 Virgo commissioning status M.Barsuglia LAL Orsay.
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
Sta bilization of the F inal F ocus : Stabilization with Nano-Meter Precision.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
G D Calibration of the LIGO Interferometer Using the Recoil of Photons Justice Bruursema Mentor: Daniel Sigg.
Thermally Deformable Mirrors: a new Adaptive Optics scheme for Advanced Gravitational Wave Interferometers Marie Kasprzack Laboratoire de l’Accélérateur.
LumiCal Alignment System Status report Leszek Zawiejski, Tomasz Wojtoń, Arkadiusz Moszczyński Institute of Nuclear Physics PAN, Cracow 25th FCAL Collaboration.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
Optical Anchor / Interferometer Status: June, 2004 Josef Frisch.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
Current progress of developing Inter-satellite laser interferometry for Space Advanced Gravity Measurements Hsien-Chi Yeh School of Physics Huazhong University.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
IPBSM status and plan ATF project meeting M.Oroku.
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
1 Noise sources at high frequency in Virgo E. Tournefier (LAPP-CNRS) ILAS WG1 meeting, Hannover December 12 th,2005 Recycled ITF sensitivities Noise sources.
LIGO-G D Enhanced LIGO Kate Dooley University of Florida On behalf of the LIGO Scientific Collaboration SESAPS Nov. 1, 2008.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
Overview Theory Index of Refraction and Path Length Setup and Procedure Michelson Interferometer Filming the Pressure Gauge Results Analysis Sources of.
LIGO-G D The LIGO-I Gravitational-wave Detectors Stan Whitcomb CaJAGWR Seminar February 16, 2001.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
T Akutsu 1, S Telada 2, T Uchiyama 1, S Miyoki 1, K Yamamoto 1, M Ohashi 1, K Kuroda 1, N Kanda 3 and CLIO Collaboration. 1 ICRR, Univ. of Tokyo, 2 AIST,
Stabilization of Focus at ATF2 David Urner University of Oxford.
Active Vibration Stabilization for the NLC Final Focus Quads Josef Frisch, Linda Hendrickson, Thomas Himel, Andrei Seryi,
Frequency Scanned Interferometer Demonstration System Tim Blass, Jason Deibel, Sven Nyberg, Keith Riles, Haijun Yang University of Michigan, Ann Arbor.
LIGO-G D LIGO II1 AUX OPTICS SUPPORT Michael Smith, 6/11/03 STRAY LIGHT CONTROL ACTIVE OPTICS COMPENSATION OUTPUT MODE CLEANER PO MIRROR AND PO.
Frequency Scanned Interferometer Demonstration System Jason Deibel, Sven Nyberg, Keith Riles, Haijun Yang University of Michigan, Ann Arbor American Linear.
LSC-March  LIGO End to End simulation  Lock acquisition design »How to increase the threshold velocity under realistic condition »Hanford 2k simulation.
Abstract The Hannover Thermal Noise Experiment V. Leonhardt, L. Ribichini, H. Lück and K. Danzmann Max-Planck- Institut für Gravitationsphysik We measure.
©LZH ZA GEO 600 Laser System as in the optics lab of Callinstraße 38 at LIGO-G D.
Paolo La Penna ILIAS N5-WP1 meeting Noise analysis in Virgo Cascina, 7-8 July 2004 Analysis of noise in VIRGO.
Status of the Advanced LIGO PSL development LSC meeting, Baton Rouge March 2007 G Z Benno Willke for the PSL team.
New in-air seismic attenuation system for the next generation gravitational wave detector M.R. Blom, A. Bertolini, E. Hennes, A. Schimmel, H.J. Bulten,
Advanced LIGO Simulation, 6/1/06 Elba G E 1 ✦ LIGO I experience ✦ FP cavity : LIGO I vs AdvLIGO ✦ Simulation tools ✦ Time domain model Advanced.
Calibration in the Front End Controls Craig Cahillane LIGO Caltech SURF 2013 Mentors: Alan Weinstein, Jamie Rollins Presentation to Calibration Group 8/21/2013.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
Dual Recycling in GEO 600 H. Grote, A. Freise, M. Malec for the GEO600 team Institut für Atom- und Molekülphysik University of Hannover Max-Planck-Institut.
NLC - The Next Linear Collider Project Mike Woods May 1999 Vibrations and the NLC IR Welcome to the NanoWorld !
How high frequency we care if we need the stabilization of 1nm level?
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
M. Mantovani ILIAS Cascina March 2008 Automatic Alignment system Improvements after the VSR1 M. Mantovani for the Alignment team.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
MONALISA Update David Urner ATF2 Meeting Dec
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Detector Characterisation and Optimisation David Robertson University of Glasgow.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
NLC - The Next Linear Collider Project Keeping Nanometer Beams Colliding Vibration Stabilization of the Final Doublet Tom Himel SLAC NLC MAC review October.
ST7 Interferometer LIGO-G Z1 The ST7 Interferometer Andreas Kuhnert Robert Spero Jet Propulsion Laboratory California Institute of Technology.
Active Vibration Isolation using a Suspension Point Interferometer Youichi Aso Dept. Physics, University of Tokyo ASPEN Winter Conference on Gravitational.
The Proposed Holographic Noise Experiment Rainer Weiss, MIT On behalf of the proposing group Fermi Lab Proposal Review November 3, 2009.
Lessons from CLIO Masatake Ohashi (ICRR, The University of TOKYO) and CLIO collaborators GWADW2012 Hawaii 2012/5/16.
The cancelation of displacement- and frequency- noise using four mach-zehnder interferometer Keiko Kokeyama Ochanomizu University / NAOJ.
David Urner Oxford University/JAI
H1 Squeezing Experiment: the path to an Advanced Squeezer
Daniel Sigg, Commissioning Meeting, 11/11/16
Status of Virgo GWDAW Dec 13-16
Nergis Mavalvala MIT IAU214, August 2002
Superattenuator for LF and HF interferometers
Commissioning the LIGO detectors
LIGO Detector Commissioning
Status of the LIGO Detectors
LIGO Detector Commissioning
Summary of iKAGRA Test Run Mar 25-31, 2016
Improving LIGO’s stability and sensitivity: commissioning examples
Presentation transcript:

10-meter Interferometer Results M. Woods (special thanks to Steve Myers and Tim Slaton) Jan. 31, 2000 Commissioning Setup System Noise Monte Carlo simulation Temperature sensitivity Study of frequency sweeping, matching interferometer arm lengths Stability and response with piezo excitation on one end mirror

Optical Anchor Overview Goal: suppress vibrations of final doublet use a closed loop feedback system with - laser interferometer sensor - piezoelectric supports for quad doublet Optical Anchor SchematicInteraction Region Schematic

Interferometer Schematic l 1 = L 1 +  l 1 l 2 = L 2 +  l 2  l =  l 1 -  l 2

In practice, we do the following Measuring the displacement,  l (cont.)

Laser Requirements 1. Laser Power want photon statistics adequate up to 100 Hz N     for T = 0.01s 2. Laser Intensity Stability  I/I <  3. Laser Frequency Stability let (l 1 -l 2 ) < 1cm

Environmental Requirements  air STP 1.1 x He STP 1.3 x n - index of refraction Let  n be change in relative index of refraction for 2 arms  P,  T be changes in relative pressure, temperature for 2 arms  P < 2.7 x Torr (air) 2.3 x Torr (He)  T < 1 x o K (air) 9 x o K (He) (but slow drifts are acceptable)

10-meter Interferometer Test Setup in Sector 10 Alignment Room

Nov. 2, 1999 Runs 5A, 5B, 5AB Photodiode Array Mean Signals Beam A Beam B Beams A and B

Photodiode Signals over 100 seconds Measured Displacement over 100 seconds Nov. 2, 1999 Run 5AB 256 Hz DAQ rms = 0.2nm

Power Spectra for Photodiode Array Signals Nov. 2, 1999 Run 5AB

Integrated Power Spectra for Photodiode Array Signals Nov. 2, 1999 Run 5AB

Displacement Power Spectra and Integrated Power Spectra Nov. 2, 1999 Run 5AB

Run MC001 Photodiode Array Mean Signals Monte Carlo Simulation Beam ABeam B Beams A and B

Input Displacement over 100 secondsReconstructed displacement over 100 seconds Run MC001 10nm ramp over 100 seconds 0.2nm input jitter per point 256 Hz ‘DAQ’

Residual (measured - input) displacement vs input displacement (photodiode spacing correct) Residual displacement vs input displacement with 10% error in photodiode spacing Monte Carlo simulation

Photodiode Signals over 100 seconds Run MC001

Displacement Power Spectra and Integrated Power Spectra Run MC001

Photodiode Signals over 100 seconds Measured Displacement over 100 seconds Nov. 21, 1999 Run 3AB 256 Hz DAQ

Power Spectra for Photodiode Array Signals Nov. 21, 1999 Run 3AB

Displacement Power Spectra and Integrated Power Spectra Nov. 21, 1999 Run 3AB

Photodiode Signals over 15 hours Measured Displacement over 15 hours Nov. 4, 1999 Run 2AB 1 Hz DAQ

Sector 10 Room Temperature over 20 hours Sector 10 Room Temperature over 40 hours Nov. 11, 1999 Temprun1 0.5 Hz DAQ (Avg. 100 pts online) Nov. 2, 1999 Run 1AB 1 Hz DAQ (Avg 100 pts offline)

Studying Temperature Effects on Interferometer Stability 30 seconds into run, put 1 fingertip on one of the 3 beamlines (A,B,C) for 30 seconds. (C is the common beamline before the beamsplitter.) A B C Nov. 11, 1999 Run 2AB Nov. 11, 1999 Run 3AB Nov. 11, 1999 Run 4AB

Studying Frequency Sweeping effects of Laser with and without mismatch in lengths of interferometer arms Nov. 11, 1999 Run 6AB Nov. 11, 1999 Run 10AB No length mismatch 1” length mismatch Prior to these runs, the laser was turned off for 60 seconds and then on for 60 seconds. Then the run is started. This results in laser not being frequency-stabilized during run.

Piezo installed on end mirror for Interferometer Arm B 10 Hz Sine Wave 10 Hz Square Wave Nov. 21, 1999 Run 9AB Nov. 21, 1999 Run 11AB 2560 Hz DAQ for 1-second for these 2 runs

SUMMARY System Resolution/Noise - typically IPS(1Hz) < 0.5nm; this is adequate for initial prototyping and interfacing with quad simulator - have demonstrated adequate resolution/noise for 10-meter arms and with anchoring of optics to floor - these good results are achieved in a good lab setting, ie. Sector 10 Alignment Room -- IPS floor (3Hz) < 10nm, and very good temperature stability (<0.3degC over 24 hours) - for actual IR installation, expect will need vacuum in the interferometer arms (or at least very good thermal isolation) MonteCarlo simulation gives reasonable modeling of results Demonstrated use of laser frequency sweeping to study matching of interferometer arm lengths Demonstrated good sensitivity and low noise with piezo actuator on an end mirror For future:- Tom Mattison is taking over this interferometer operation - it is ready for development of piezo excitation / feedback and for integration with a quad simulator