BABAR  &  L. de Brunhoff Drift Chamber System BABAR Drift Chamber Project Co-System Managers D.B.MacFarlane, McGill University A.J.S.Smith, Princeton.

Slides:



Advertisements
Similar presentations
20 June 2008E906 Collaboration Meeting1 Tracking Chambers for FNAL E906 Edward R. Kinney University of Colorado, Boulder, USA Overview of Station 1 Status.
Advertisements

T2K – Canada Accelerator & Detector Status D. Karlen University of Victoria & TRIUMF ACOT meeting, May 12, 2007.
D. Peterson, “The Cornell/Purdue TPC”, LCWS05, Stanford, 21-March The Cornell/Purdue TPC Information available at the web site:
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
Jan 28th, 2009Colin Jessop at Notre Dame An experiment to measure CP violation in B mesons Colin Jessop University of Notre Dame.
D. Peterson, “The Cornell/Purdue TPC”, ALCPG, Snowmass, 23-August The Cornell/Purdue TPC Information available at the web site:
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
BES III Main Drift Chamber MDC group Yuanbo Chen June 5,2002, Beijing.
SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
CDC Scrutineer Talk Elliott Wolin GlueX Collaboration Meeting Jefferson Lab 9-Sep-2004.
Review of CIEMAT contributions to linear accelerators L. García-Tabarés, F. ToralCIEMAT, 7/9/2006.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chambers for CLAS12 - Mac Mestayer Context: how does it fit within CLAS12 ? Specifications:
June 9, 2008What’s a Drift Chamber? Mac Mestayer Drift Chambers: The Science behind the Art What are they? how do they work? ionization of the gas by particles.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
J-PARC における K 中間子原子核探索実験 のための円筒形ドリフト・チェンバー の開発 (J-PARC E15 実験 ) 理研 佐久間 史典 S.Ajimura 1, G.Beer 2, H.Bhang 3, P.Buehler 4, L.Busso 5,6, M.Cargnelli 4, J.Chiba.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Luca Spogli Università Roma Tre & INFN Roma Tre
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Main Drift Chamber Yuanbo Chen Ihep Motivation (MDC IV) The BGO crystal used in L3 will be used for BES III ’ s Calorimeter. The space for MDC.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Precision Drift Chambers for the ATLAS Muon Spectrometer
CLAS12 Drift Chamber Prototyping
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
03/21/2005Michael Spitznagel (MIT)Page 1 The Babar Drift Chamber Michael Spitznagel Massachusetts Institute of Technology.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
1 A CLUster COUnting Drift Chamber for ILC …and… can we adapt this chamber to SuperB ? F.Grancagnolo, INFN – Lecce, Italy.
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Annecy, Carleton/CRPP, Colorado, Colorado State, LBNL, Maryland, McGill, MIT, Montreal, INFN Padova, INFN Pisa, Princeton, INFN Rome, UC San Diego, UC.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
Presentazione delle richieste immediate per l’upgrade di MEG (gruppo di Roma) Cecilia Voena Mar 15 th, 2013.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
The new MEG tracker Marco Grassi INFN - Pisa Overview Timescale Tasks Funding.
TRIUMF laboratory studies Christopher Hearty University of British Columbia/IPP 27-Sep-2010.
Status of TRIUMF Prototype Studies Christopher Hearty University of British Columbia/IPP May 31, 2010.
Tracking software of the BESIII drift chamber Linghui WU For the BESIII MDC software group.
G. Finocchiaro – INFN LNF XI SuperB General Meeting DCH-I parallel session LNF, 1 December 2009.
1 Preliminary Considerations on Tracking for HIEPA Yifei Zhang and Jianbei Liu University of Science and Technology of China Workshop on Physics at Future.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Drift Chamber Prototyping Plans at ODU Gail Dodge, Tom Hartlove, Mac Mestayer Nov. 18, 2005 Goals for FY06: Design 144 cell prototype of R1 Drift Chamber.
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
SuperCDMS and CUTE at SNOLAB
Dept. of Physics and Space Sciences, Florida Institute of Technology
T1 status (a selection from EDR presentations)
Structure and etc Shoji Uno (KEK) at B2GM
WBS: : Tracking for CLAS12
Drift Chambers for CLAS12 -Mac Mestayer
Region I: stringing 1/3 done on 1st chamber!
CLAS12 Tracking Design (ca. 2005) a basic design parameters
CDC Structure S. Uno KEK
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
CMS Goal of the experiment
RPC and LST at High Luminosity
Advanced Research Electron Accelerator Laboratory
(On Behalf of CMS Muon Group)
CDC structure Shoji Uno (KEK)    July-8, 2009.
Limited Streamer Tube Project Summary
Cluster Counting Drift Chamber as high precision tracker for ILC experiments G.F. Tassielli(1,2) (1) Dipartimento di Fisica dell’Universita’ del Salento,
Presentation transcript:

BABAR  &  L. de Brunhoff Drift Chamber System BABAR Drift Chamber Project Co-System Managers D.B.MacFarlane, McGill University A.J.S.Smith, Princeton University

BABAR  &  L. de Brunhoff Drift Chamber System Drift Chamber Structure l Flat aluminum rear (24 mm) and forward (24+12 mm) endplates –Forward endplate with thin outer section to minimize material –Preamplifier and digitizer electronics on rear endplate only l Load-bearing inner and outer walls to reduce deflections –Inner wall of 1 mm-beryllium (40% load) –Segmented outer wall of 2x1.5 mm CF skins on Nomex core (60% load)

BABAR  &  L. de Brunhoff Drift Chamber System Drift System Layout l 40-layer small-cell chamber –Cells are 12x18 mm 2 in size –7104 drift cells with hexagonal field wire pattern –80 and 120  m gold-plated aluminum field wires l Layers organized into superlayers with same orientation –Wire directions for 4 consecutive layers: axial-u-v-stereo –Required for fast reduction of input to Level 1 trigger via segment finding –Transition field shaping voltages to maintain reasonably uniform performance

BABAR  &  L. de Brunhoff Drift Chamber System Drift Cell Characteristics l Nominal 80:20 helium-isobutane gas mixture –Low-mass gases able to achieve sub-100  m position resolutions –Low multiple scattering required by soft B decay products –dE/dx performance comparable to argon-based mixtures l Small Lorentz angle should lead to good cell efficiency –Modest entrance-angle dependence to STR l Performance confirmed by measurements with full-length prototype

BABAR  &  L. de Brunhoff Drift Chamber System Drift Chamber Performance Expected mass resolution for B 0     about 22 MeV/c 2 –Nearly uniform over center-of-mass polar angle distribution

BABAR  &  L. de Brunhoff Drift Chamber System Drift Chamber Collaboration Canada: University of British Columbia Carleton University McGill University University of Montreal TRIUMF National Laboratory University of Victoria United States: University of Colorado Colorado State University Lawrence Berkeley Laboratory University of Maryland Massachusetts Institute of Technology Princeton University UC Santa Cruz Stanford Linear Accelerator Center Italy: INFN Padova INFN Pisa INFN Rome France: Laboratoire d'Annecy-le-Vieux de Physique des Particules About 50 physicists and 25 engineers & technicians

BABAR  &  L. de Brunhoff Drift Chamber System Project Budget l Canadian contributions from Natural Sciences & Engineering Research Council and the TRIUMF National Laboratory l US contributions are funded through Department of Energy l Italian contributions are supported by INFN and include only materials & supplies, with staff engineering & technical support l French contributions are supported by IN2P3 and include only materials & supplies, with staff engineering & technical support l Additional $3M for Drift Chamber electronics budget not included here NSERC & TRIUMF 760K DOE1650K INFN 453K IN2P3 87K Total2950K Baseline, no contingency

BABAR  &  L. de Brunhoff Drift Chamber System Institutional Responsibilities l IPP/TRIUMF: Assembly and stringing, design & fabrication of assembly fixtures, stringing tooling, QC & tension testing, clean room, slow controls, aging tests l INFN-Pisa, Padova, Rome: Automation for stringing, outer CF cylinder, HV & LV power supplies & controls, collaboration on inner cylinder l IN2P3-Annecy: Gas system, monitors & controls, dE/dx studies l Colorado: Service boards, tension measurement l Colorado State: Feedthrough design & procurement, aging tests, wire replacement techniques l Maryland: Environmental controls l Princeton: Collaboration on endplate design, procurement & QC of endplates, fabrication of assembly fixtures, wire procurement & testing, tension magnet l SLAC: Integration, mechanical design center, electronics and support structures, prototype construction, inner cylinder design and procurement

BABAR  &  L. de Brunhoff Drift Chamber System Drift Chamber Status & Schedule l Endplates machined & drilled by Brenner Tool & Die; delivered to TRIUMF January 31 l Beryllium inner cylinder from Electrofusion; delivered May 9 l Outer cylinder completed & test fitted June 20 l Assembly & alignment fixtures available at TRIUMF; chamber structure completed & aligned May 23 l Automated stringing tooling assembled & operational after extensive development by August 6 l Wire orders complete, feedthroughs in production & nearly complete l Main stringing period August-December 1997 at TRIUMF; delivery to SLAC in March 1998 Project is on schedule for July 1998 installation into BABAR & on budget