Integrated Reliability Measures Heide Caswell, Team Lead, Reliability Metrics Working Group (RMWG) Director of Network Performance, PacifiCorp Compliance.

Slides:



Advertisements
Similar presentations
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Advertisements

NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Operating Reserves --- Again A Discussion Primer
BAL-002-WECC-1 Contingency Reserves
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Revised Event Analysis Process Event Analysis Subcommittee (EAS) Process Update Team (EUT) Hassan Hamdar – FRCC Reliability Engineer, EAS Vice-Chair FRCC.
Presented to PGDTF February 11, 2015
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
RPEWG Report Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014 RS Meeting 1.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
Sanctioning Guidelines Carm Phillips Compliance and Dispute Resolution Division Market Assessment and Compliance Division.
Forecasts and Assessments Presented to the Independent Power Producers’ Society of Ontario Pat Doran, Supervising Technical Officer Independent Electricity.
NERC Lessons Learned Summary
Network security policy: best practices
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
Internal Auditing and Outsourcing
Critical Infrastructure Protection Update Christine Hasha CIP Compliance Lead Advisor, ERCOT TAC March 27, 2014.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
McGranaghan US Session 2 Block 4 Question 12 Barcelona May Statistical Framework for Establishing Target Reliability Levels and Classifying.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
Compliance Performance Measure Proposals and Preliminary Trends Greg Pierce – Chair, Performance Measures Task Force Compliance and Certification Committee.
Peak RCCo Performance Metrics Draft –November 2013.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
1 Today’s Presentation Sarbanes Oxley and Financial Reporting An NSTAR Perspective.
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
Performance Measure Recommendations Greg Pierce – Chair, Performance Measures Task Force Compliance and Certification Committee Meeting September 8-9,
Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting.
Standards Review Subcommittee Update August 17, 2010.
Copyright © The OWASP Foundation Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation.
Review of TADS Data for 2012 Voltage Class Name Metric AC Transmission Outages - Failed Protection System Equipment AC Transmission Outages - Human Error.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
Probabilistic Transmission Planning - ERCOT
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Compliance Report to ERCOT BOD December 2006
UFLS Workshop Discussion #3
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
WECC Regional Standards Update
Next Steps in Load Modeling
Compliance Report to ERCOT TAC February 2007
Grid Integration of Intermittent Resources
ISO New England System R&D Needs
Local Area Planning Update to TRANSAC – March 15, 2017
Compliance Performance Measure Proposals and Preliminary Trends
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
Software Measurement Process ISO/IEC
Compliance Open Webinar
Workshop Session 1: Overview
Workshop Session 1: Overview
Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014
Performance Measure Recommendations
Steve Rueckert – Director of Standards
NERC Planning Committee Update
Presentation transcript:

Integrated Reliability Measures Heide Caswell, Team Lead, Reliability Metrics Working Group (RMWG) Director of Network Performance, PacifiCorp Compliance and Certification Committee Meeting September 21-22, 2011 Atlanta, GA

2RELIABILITY | ACCOUNTABILITY 2 Topics Conceptual Model Initial Developments Continuing Our Understanding of the Risk Universe Conceptual Indicators –Event Driven Index –Standards/Statute Driven Index –Condition Driven Index Continuing Dialogue with CCC Discussion and Feedback

3RELIABILITY | ACCOUNTABILITY Integrated Reliability Indicators (IRI) Develop the conceptual model of reliability risks Establish quantitative measures for evaluating the performance of the indicators Support risk-informed decision making May be able to correlate over the long term to predictive measures of reliability risks and if so… Estimate the effectiveness of reliability risk reduction and/or mitigation

4RELIABILITY | ACCOUNTABILITY Severity Risk Index (SRI)

5RELIABILITY | ACCOUNTABILITY Key Concepts

6RELIABILITY | ACCOUNTABILITY Integrated Risk Indicators Event Driven Index (EDI) Measures Risk from Major System Events Standards/Statute Driven Index (SDI) Measures Risks from Severe Impact Violations Condition Driven Index (CDI) Monitors Risk from Key Reliability Metrics Based on event severity risk index (SRI) values and turns into an availability index Uses the roster of reliability metrics developed by RMWG and approved by OC/PC Identify a subset of standards that have highest impact to reliability and create an index of standards violations

7RELIABILITY | ACCOUNTABILITY Severity Risk Index (SRI) Focus on significant events and quantify the historic system performance using daily outage data –GADS and TADS daily outages, forced only –MW load loss and restoration duration from disturbance event reports –Could be considered similar to a daily, quarterly or yearly SAIDI metric for distribution systems –If everything was out of service, all load was unserved, the day’s score would be 1000 –If no lines or units were out of service and no load was lost the day’s score would be 0 –Normal “good days” will measure higher than 0

8RELIABILITY | ACCOUNTABILITY Severity Risk Index (SRI)

9RELIABILITY | ACCOUNTABILITY EDI Trends by Quarter

10RELIABILITY | ACCOUNTABILITY Proposed Approach to Standard Driven Index (SDI)

11RELIABILITY | ACCOUNTABILITY Proposed Approach for Standards/Statute Driven Index (SDI) Segment all Standards and Requirements by their Violation Risk Factors; Lower, Medium or High are the VRFs (as many as 1,427 standard requirements accounted for) Select only Standards and Requirements with High VRF (430 standard requirements relevant) Evaluate the range of possible violation severity levels (VSLs), which could range from Lower, Moderate, High to Severe (198 are severe VSL and high VRF) –VSLs are guidelines established jointly by the compliance and standard drafting team and are detailed as to criteria which identifies the level of severity. These levels are approved by the BoT. Consider Risk Impact Statements…select only those with Severe RIS There are 26 requirements with High VRFs and Severe Risk Impact Statements (see list of these requirements following) NERC used the almost four year history (June 2007-December 2010) to validate the proposed 26 standards requirements There is potential to assign to weight requirements by VRFs or VSLs if appropriate The Standard Applicability matrix enables us to derive a normalization factor (denominator) for all entities exposed to a requirement with a High VRF

12RELIABILITY | ACCOUNTABILITY Uses High Violation Risk Factor (VRF) (Approved standard requirements only) Severe Reliability Impact Statement (RIS) –RIS indicates significance of impact on BPS Considers Violation Severity Level (VSL) Validated against almost 4 year history of violations for most significant standards risks to reliability Violation Risk Factor Violatio n Severity Level HighMediumLower Severe High Moderate Lower Proposed Approach for Standards/Statute Driven Index (SDI)

13RELIABILITY | ACCOUNTABILITY Violation Severity Level Violati on Risk Factor Risk Impact Statement Value? SevereHighModerateLower High Severe High Non-Severe Medium Severe Medium Non-Severe Lower Severe Lower Non-Severe Severe Reliability Impact Statement (RIS) –RIS indicates significance of impact on BPS Uses Violation Risk Factor (VRF) Demonstrates Violation Severity Level (VSL) Similar to daily SRI calculation Almost 4 year history violation history of 4,410 confirmed violations Proposed Approach for Standards/Statute Driven Index (SDI)

14RELIABILITY | ACCOUNTABILITY * All 26 requirements have high Violation Risk Factor (VRF) and Severe Risk Impact Statements Proposed Approach for Standards/Statute Driven Index (SDI)

15RELIABILITY | ACCOUNTABILITY SDI Calculation 15 SDI = (Total Compliance - ∑(w V *NV/NR))/(Total Compliance) Range from 0 to 100 Total Compliance = 1.0* Number of Days in a specific period w V = weighting of a particular high risk req. violation NV = number of violations for the selected high risk req. NR = number of registered entities required to comply with the high risk req.

16RELIABILITY | ACCOUNTABILITY SDI Calculation Example SDI = (Total Compliance - ∑(w V *NV/NR))/(Total Compliance) SDI = 100*(1.0*Days in a Quarter - ∑(w V *NV/NR)) / (1.0*Days in a Quarter) 1Q2009: –40 violations (PRC-005 R1) –RIS = Severe, VRF=High, VSL=Severe –A total of 335 TOs, 828 GOs registered functions –SDI = 100*(1.0* *(40)/( ))/(1.0*90) = 99.99

17RELIABILITY | ACCOUNTABILITY Possible SDI Trend by Quarter

18RELIABILITY | ACCOUNTABILITY Condition Driven Index (CDI) Began by narrowing down to key Condition Metrics Assumed CDI = Have since moved toward measuring improvement in approved metrics published by RMWG

19RELIABILITY | ACCOUNTABILITY Beginning Approach to Condition Driven Index (CDI)

20RELIABILITY | ACCOUNTABILITY Condition Driven Index (CDI) 18 reliability metrics Use SMART criteria to rank the relative importance 5 trend ratings are determined per metric performance –Significant improvement –Slight improvement –Inconclusive –Slight Deterioration –Significant Deterioration

21RELIABILITY | ACCOUNTABILITY ALR Metrics Relative to Standard Objectives

22RELIABILITY | ACCOUNTABILITY Reliability Metrics ALR 1-3Reserve Margin ALR 1-4 BPS Transmission Related Events Resulting in Loss of Load ALR 2-4Disturbance Control Standard Failures (DCS Failures) ALR 2-5 Disturbance Control Events Greater than Most Severe Single Contingency (MSSC) ALR 3-5IROL/SOL Exceedance ALR 4-1Correct Protection System Operations ALR 6-1Transmission Constraint Mitigation ALR 6-2Energy Emergency Alert 3 (EEA 3) ALR 6-3Energy Emergency Alert 2 (EEA 2)

23RELIABILITY | ACCOUNTABILITY Reliability Metrics (cont’d) ALR1-5System Voltage Performance ALR1-12Interconnection Frequency Response ALR2-3UFLS and UVLS Usage ALR6-11 Automatic AC Transmission Outages Initiated by Failed Protection System Equipment ALR6-12Automatic AC Transmission Outages Initiated by Human Error ALR6-13 Automatic AC Transmission Outages Initiated by Failed AC Substation Equipment ALR6-14 Automatic AC Circuit Outages Initiated by Failed AC Circuit Equipment ALR 6-15Element Availability Percentage ALR 6-16Transmission System Unavailability due to Automatic Outages

24RELIABILITY | ACCOUNTABILITY IRI Concept BPS Integrated Reliability Index (IRI): –Event Driven Index (EDI): Based on event severity risk index (SRI) values –Condition Driven Index (CDI): Use a subset of metrics based on selection criteria –Standards/Statute Driven Index (SDI): Identify a subset of standards that have highest impact to reliability and create an index of standards violations

25RELIABILITY | ACCOUNTABILITY IRI Trend ( by Quarter) Reliability Indices EDI SDI CDI IRI

26RELIABILITY | ACCOUNTABILITY Possible IRI Attributes Scale from 0 to would indicate a perfect performance Weighting should be developed and can be adjusted Aggregation at NERC, Interconnection and Region levels Reporting period – targeting quarterly, reported at year end Trial indicators until sufficient history is experienced

27RELIABILITY | ACCOUNTABILITY 27 Reference Materials Quarterly Update is available at Reliability Indicators Display – Reliability Metrics Working Group webpage –

28RELIABILITY | ACCOUNTABILITY Coordination/Conversation with CCC Gregory Pierce has been engaged to act as liaison with RMWG and participate in continuing IRI developments CCC Member Thoughts –Desire discussion regarding concepts about SDI –Interested in group’s concerns about overlap of standards versus events versus condition metrics –Is selection of top 26 appropriate? –How can this approach be resilient with time? –Who votes a standard requirement on or off the top list?

29RELIABILITY | ACCOUNTABILITY 29 Discussion and Feedback

30RELIABILITY | ACCOUNTABILITY Standards/ Statute- Driven Metrics System/Event -Driven Metrics Reliability Condition- Driven Indicators Organization Effectiveness Metrics 30 Reliability Improvement Organizational Effectiveness ? ? ? ? ? ? ? ? ? ? ? Standards/ Statute- Driven Metrics System/Event -Driven Metrics Reliability Condition- Driven Indicators Organization Effectiveness Metrics Reliability Performance Measures