1 Market Operations Presentation Board of Director’s Meeting August 16, 2005.

Slides:



Advertisements
Similar presentations
Market Operations Presentation Board of Director’s Meeting November 18, 2003.
Advertisements

Texas Deregulation – A Success Story The ERCOT Market Framework Has Been A Success Implementation  Bilateral Contracts - Participants contract up to 100%
1 Market Operations Presentation Board of Director’s Meeting April 19, 2005.
Smart Metering in ERCOT: Implementation Update CCET Board of Directors Meeting August 3, 2011 Presented by Christine Wright, Competitive Markets Division.
Progressive Energy Solutions, LLC July 28, 2010 NYMEX N. Illinois Hub Electric Prices 12-Month Forward Prices Through July 15, 2010 * NEU Electric and.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
RMSUpdate January 6, 2005 Retail Market Subcommittee Update to TAC.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
1 MIMO/Stacking (Including Tx SET Version 2.0) Post Implementation Success Report.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
ERCOT MARKET EDUCATION
Retail Market Subcommittee June 9, 2010 Performance Measures 1st Quarter 2010 Transaction Comparison.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
0 The Basics –There are 4 POLR customer classes: Residential, Small Non-Res. (
June 17, Strategic Framework Business Definition and Strategic Issues Board of Director’s Meeting June 17, 2003 ERCOT Strategic Planning Task Force.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
Rob Connell May 1, 2002 Retail Sub-Committee Update.
Market Operations Presentation ERCOT Board of Directors October 21, 2008 Updated as of 10/21/08 Betty Day.
Demand Response Status Report Calvin Opheim October 9, 2007.
RMS Update to TAC April 7, RMS Voting Items  RMGRR032- Transaction Timing Matrix Corrections Includes updates to Appendix D to correct examples.
Managing Reliability and the Markets with PI
1 Market Operations Presentation Board of Director’s Meeting September 16, 2003.
Retail Market Subcommittee Update to COPS Kathy Scott March 17,
Resource Cost Working Group December 2, 2015 WMS Update.
ERCOT MARKET EDUCATION Retail 101. Retail Transaction Processing.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
1 TAC Report to the ERCOT Board February 16, 2005.
ERCOT Monthly Operational Overview (July 2012) August 15, 2012.
TX SET Update to RMS Wednesday, November 7, 2007.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
1 Market Operations Presentation Board of Director’s Meeting January 17, 2006.
1 TX SET Mass Transition Project RMS Update March 15, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
1 TDTWG March 4, 2009 Performance Measures Overview.
TX SET Update to RMS Wednesday, May 9, Elimination of the Drop to AREP o RULEMAKING TO AMEND COMMISSION SUBSTANTIVE RULES CONSISTENT WITH §25.43,
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
1 Market Operations Presentation Board of Director’s Meeting December 13, 2005.
TAC 2012 Meetings Update (March & April) to Commercial Operations Subcommittee Harika Basaran 5/8/2012.
March 22, 2011 ERCOT Board of Directors Commercial Market Operations Version 2 - Updated on March 18, 2011 Betty Day.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
Mass Transition—Timelines & Volume Limitation RMGRR116—Acquisition Transfer Non-standard Metering Future Meetings 1.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Settlement Stability 2015 Q1 Update to COPS- DRAFT Blake Holt ERCOT COPS 07/15/2015.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
1 Market Operations Presentation Board of Director’s Meeting August 19, 2003.
NON-RESIDENTIAL ENERGY MANAGEMENT HCDE, Facilitator and DRF Industries, LLC Consultants Energy Education, Energy Cost, TDU Charges, & Demand Reduction.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
1 Market Operations Presentation Board of Director’s Meeting February 16, 2005.
COMET Working Group Progress Report 11/13/03
TAC Report to the ERCOT Board
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
The New Texas Wholesale/Retail Market
Energy Storage Settlements Consistent with PUCT Project & NPRR461
CEO Report Thomas F. Schrader ERCOT Board of Directors May 17, 2005
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Presentation transcript:

1 Market Operations Presentation Board of Director’s Meeting August 16, 2005

2 Agenda Overall Activity Migration From Native AREPs Performance Measures (Quarter Only) Reliability Services Balancing Services Hub Summary Data Congestion Management Services Retail Activity Wholesale Activity Other Items

3 Overall Activity Transaction Type Switches1,935,034 Move - Ins6,834,283 Move Out3,945,931 CSA1,200,339 Drop to POLR302,496 Total14,218,083 Compared to Last Month 437,750 Retail Transactions Summary As of Thursday, June 30, 2005 since June 1, 2001

4 Residential Small Non-Residential Large Non-Residential Migration from Native AREP % of ESI IDs 16% 20% 60% 24% 29% 72% 30% 75% 73% % of Load * at at at * % of Peak Demand on

5 Q Performance Measures submitted to PUCT SWITCHES 814 Transactions - Enrollment and Meter Read Scheduling RequestRejectto TDSPScheduleto New CRto Old CRfrom Old CR 214,2407,514206,670208,537205,882168,944162,422 % in Protocoln/a99.0%99.9% 99.8%99.0%99.4% 867 Transactions - Historical Usage (H) and Initial (I) Meter Read Deliveries H to ERCOTH to CRI to ERCOTI to CR 196,529196,499160,666160,360 % in Protocol99.7%100.0%n/a98.9%

6 Q Performance Measures submitted to PUCT MIMO 814 Transactions - Enrollment and Meter Read Scheduling RequestRejectto TDSPScheduleto New CRto Old CRfrom Old CR 642,0529,333631,771624,062618,722322,631303,037 % in Protocoln/a90.3%93.4%99.9%96.8%99.1%99.8% 867 Transactions - Historical Usage (H) and Initial (I) Meter Read Deliveries H to ERCOTH to CRI to ERCOTI to CR 330,178330,174579,913578,919 % in Protocol98.7%100.0%n/a99.1% Protocol is 5 hours. Average timing outside of protocol was 12 hours, 12 minutes. Reject transaction calculation was found to be in error due to system handling of duplicate transactions submitted to ERCOT. A Service Investigation Request (SIR) has been filed to correct the error. Depending upon the amount of duplicates, the error may be as much as 6% to 8% lower than actual protocol compliance.

7 Reliability Services 06/30/0506/30/ Market Perspective: Approximate Retail Market (at $.10/kWh PTB) $13, ,471.52,973.32,670.9 Volume (GWh)138,331134,71529,73326,709 % Increase2.7%11.3% Natural Gas Price Index ($/MMBTU) % Increase14.0%16.1% RMR: RMR Capacity and Start Up RMR Energy BENA Credit Net RMR Other Capacity Services: Replacement Reserve0.0 Reg Up and Down Responsive (Spinning) Reserve Non-Spinning Reserve Black Start TOTAL RELIABILITY SERVICES$ YTD ($'s in millions) June ($'s in millions)

8 Balancing Services 06/30/0506/30/ Market Perspective: Approximate Retail Market (at $.10/kWh PTB) $13, ,471.52,973.32,670.9 Volume (GWh)138,331134,71529,73326,709 % Increase2.7%11.3% Natural Gas Price Index ($/MMBTU) % Increase14.0%16.1% Balancing Energy: Balancing Energy - Up$ % Increase 67.1%151.3% Up (GWh)5,146.03,911.51, % Increase 31.6%81.6% % of Market 3.7%2.9%5.1%3.1% Balancing Energy - Down-$ % Increase -30.7%-50.2% Down (GWh)-2, , % Increase -25.6%-51.4% % of Market1.8%2.5%1.4%3.1% YTD ($'s in millions) June ($'s in millions)

9 Hub Summary Data ERCOT Hubs TotalBalancing Average PriceVolumeUp VolumeDown Volume HUB($/MWH)(GWh) South$ North$ Houston$ West$ ERCOT Hub Average$73.431,919.31, ERCOT Bus Average$74.461,919.31, June Weighted

10 Congestion Management Services

11 Other Items Added RepsAdded QSEs Bridgepoint Power & Light, LLC Ideal Energy, Inc.