ANNEXE OFFICE CONVERSION. Heating Operation Two gas fired boilers provide hot water to two separate circuits, a constant temperature circuit and a variable.

Slides:



Advertisements
Similar presentations
Using Ground Source Heat Pump The Avenue Centre.
Advertisements

Chapter 3. HVAC Delivery Systems
TESTING AND BALANCING IN HEALTHCARE FACILITIES. What is Test & Balance The art of establishing air and water flows to meet design criteria. Total System.
Operational Ideas for Supercritical Systems The Ultimate Criteria for Appreciation ….. P M V Subbarao Professor Mechanical Engineering Department I I.
Presented by Tim Baldwin. Established by the Energy Act 2011 Loan scheme attached to energy bill. Governed by the consumer credit act Supervised by Independent.
IGCSE ICT Control Systems.
HEALTHCARE BUILDING AUTOMATION
Sustainability is Good for Business HOUSEKEEPING DEPARTMENT.
WebStat™ Programming and Configuration of Thermostats.
Heating, Ventilating, and Air-Conditioning
IX. REDUCING GREENHOUSE TEMPERATURE A. temperature regimes –range deg, stress above 90 deg.
Sustainability Advocates Program New Advocates Training April 7, 2009 ENERGY AT NYU.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
Controlling Sutardja Dai Hall Andrew Krioukov Stephen Dawson-Haggerty, Jay Taneja David Culler.
Preparing for Power Outages Like any other part of the infrastructure, electrical power to the campus can fail, either as an isolated incident (e.g., tripped.
① The output signal of a room thermostat is ON or OFF according to changes of room temperature ② The power supply to a motorized valve is ON or OFF according.
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
Heating Control Devices
1 Direct Fired Gas Heating Presented by Jim Jagers of Applied Air.
Benefits of Floor Heating Control Individual Room Temperature Control In Hydronic Floor Heating Applications – Simulation Studies, August 2003 Danfoss.
BRE Energy Efficient Office of the Future
11-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 11 OPERATION.
Presented by: Terry Stohs Viessmann Manufacturing Company Inc.
Engineer Presentation
Unit 6.2. Mechanical and mixed mode ventilation TB Infection Control Training for Managers at National and Subnational Level.
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
DEPT OF ESTATES AND FACILITIES Engineering Team DEPT OF ESTATES AND FACILITIES Engineering Team Too hot, too cold, just right Presented by: Russell Smith.
Energy Efficiency with ABB i-bus® KNX
How to create... A Fire Evacuation Plan.
Gary C Akers Technical Manager. * No wall clutter. * Reduced risk of clashes. * Aesthetically pleasing. * Site benefits. * Environmental benefits. * Cooling.
10 Energy Saving Advices. 1- Lowering of the temperature at night Limit the lowering of the temperature at night. If the temperature is reduced too much,
L 17 - Thermodynamics [2] Today’s topics
L 17 - Thermodynamics [2] Today’s topics –Practical thermal effects –Devices for temperature measurement –Mechanisms of heat transfer Science dealing.
Control Systems Did you get these? Washing machine Microwave cooker
Autoclaves in the School of Life Sciences at Warwick Janine Kimpton – Technical Services Centre Manager Dave Hibberd – Workshop & Infrastructure Manager.
Melcotel TM Features and Benefits Melcotel - Introduction New features –Links with up to 250 room units –Settings reset –Automatic switch OFF –Setback.
HYDRONIC HEATING AQUASTATS
The European Office Building S.H. Liem, A.H.C. van Paassen M.Verwaal, H.F. Broekhuizen Delft, April 1998 S.H. Liem, A.H.C. van Paassen M.Verwaal, H.F.
License No Innovative Solutions. Enduring Principles.
Air Conditioning Heating Refrigeration
Looking at systems. What is a SYSTEM? The radiator makes the room warmer by turning ON when the temperature of the room is lower than required The THERMOSTAT.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only.
Environmental Monitoring of Room 308 Fiona Wain and Gennifer Majors Preventive Conservation Anita Quye.
Using Technology to Manage Energy Bob Schoch-Director of Business Administration Tom Schneider-Supervisor of Operations.
Healthy Homes Home Energy & Weatherization. Energy Management for Home goals … save energy provide comfort assure safety and health.
4. INTERIOR LAYOUT  Good interior layout will facilitate many of the passive strategies recommended in this toolkit, in particular thermal mass, lighting.
Energy Efficient Heating for Churches Cooltouch Heaters Ltd.
CUE – Make Any Pump an E-Pump
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
System A collection of parts that perform a function.
Taking Control of Energy. In this workshop... Understanding Bills 3 Easy Ways to Save Concessions & Grants Switch & Save Saving Energy Flexible Pricing.
Energy Basics Understand it, Control it and Save.
1 Chapter No. 17 Radiation Detection and Measurements, Glenn T. Knoll, Third edition (2000), John Willey. Measurement of Timing Properties.
Lighting facts.  Lighting can be a big energy consumer in offices and production areas and experience shows that energy savings may be achieved - often.
TREND 963 Basic Operation Course Helpful hints for running your Trend system.
Day 1 Part 4 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Boiler Energy Saver Advanced Boiler Controls. Most boiler controls at present consist of a switch!
DSLAM Configuration in a Cabinet Heat and Noise testing December 2008.
Energy Mythbusters!. For most schools hot water is provided by your boiler – which is in turn controlled by your TREND Building Management System It’s.
Air source heat pump Understand the fundamental principles and
Fan Coil Controller FC/S 1.1
Story of No-Cost Energy Savings at Ohio Union
Bell work Predict whether leaving the refrigerator door open on a hot summer day will help to cool the kitchen.
Roof Top Unit Overview (MAGNUM)
PREPARATION FOR WINTER
Input-Output-Process Demo
General Guide to Thermostat Settings
How electronic systems work using the Systems approach.
Presentation transcript:

ANNEXE OFFICE CONVERSION

Heating Operation Two gas fired boilers provide hot water to two separate circuits, a constant temperature circuit and a variable temperature circuit. The variable temperature circuit provides hot water to the trench heating in the open plan office and this is compensated against external ambient temperature. The heating is designed to achieve a minimum of 19°C internal building temperature for early morning occupancy, when the external air temperature is no lower than minus 5°C. The BEMS learns from historical system operation and monitors external air temperature, then activates the boilers when required. The boilers are firing late Sunday evening on occasion to bring the building up to temperature on cold Monday mornings after the weekend closure Localised thermostatic controls allow occupants to set the radiators output to their own local comfort level, but it should be kept in mind that valve settings equate to the following respective temperature outputs: 3 = 20°C, 4 = 23°C, 5 = 26°C and I = 28°C, when 21 to 22°C is considered a comfortable office environment Turning thermostats up to max at the start of the week then off on Friday, will significantly inhibit heating performance, particularly after the heating has been off all weekend. Maintenance may choose to fit lockable heads on a standard setting in future

Building Temp Too Hot? 1. Check the heating is OFF to all areas. Check open plan space temperature Check meeting rooms and training rooms temperature Check over-door heaters are off 2. Open windowsAll sides of the building to allow a flow of air throughout. 3. Open the ventilation turretsUse the manual over-ride if these have not opened automatically (if external temp is over 12.5°C and internal temp is over 25.1°C). Check the external air temperature recorded on the BEMS. The building is naturally ventilated and does not provide air conditioning throughout the occupied space. Due to the heating effect of occupants and equipment, it cannot reach a temperature lower than the external air temperature. During extended periods of warm weather, ensure that the heating system is off by checking the automatic controls. The set-back temperature may also be reduced to minimize the overnight heat input. If, despite these measures, the internal air temperature remains noticeably higher than the external then contact the help desk for assistance

Building Temp Too Cold? 1. Check the heating is ON to all areas and there is not a fault with the boilers operation Check open plan space temperature Check meeting rooms and training rooms temperature 2. Close windowsAll sides of the building to prevent draughts 3. Close the ventilation turrets and set the de-stratification fans to blow mode Facilities staff to action via BEMS (turrets could only be open due to CO2 limit being exceeded in cold weather) 4. Check the radiator valvesCheck that thermostatic valves are set correctly (not low or off) 5. Check over-door heatersEnsure these are operating and set to the highest output mode 6. Check heating in training and meeting rooms Ensure the thermostats are correctly set in all areas 7. GeneralFacilities staff to check the automatic control settings for the heating system to ensure that the overnight set-back is correct and that the target temperature/time parameters have been correctly adjusted. If, despite these measures, the internal air temperature remains below an acceptable level, contact the help desk.

Staff Roles and Responsibilities Can set the temperature output of radiators using local thermostats Can open and close windows to allow natural ventilation, which design assumes will happen Can set the thermostatic controls in training rooms and meeting rooms to comfort levels Can open the wind turrets using short term localised control switches Report issues using the Facilities online form

Facilities Roles and Responsibilities Will control the BEMS settings for heating, ventilation and lighting operation Will control the over door heat curtain settings Will check any reported temperature concerns (high or low) and take necessary action in accordance with the trouble-shooting guide Will control the lighting levels in the open plan area via the BEMS and make any essential adjustments required Should inform the Property Maintenance help desk of unresolved problems for further investigation and instruction of repairs contractors as required

Property Maintenance Roles and Responsibilities Will arrange regular servicing and repairs to all systems Will assist Facilities staff to investigate any recurring problems with systems malfunction Will provide advice on set-point levels in the BEMS and Summer/Winter adjustments in consultation with the Energy Officer