TRL5 vibration-free soprtion-based cooler for the temperature range 15 to 30 K H.J.M. ter Brake 1, H.J. Holland 1, C.H. Vermeer 2, J.F. Burger 3, A. Maas.

Slides:



Advertisements
Similar presentations
HEATING AIR © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
Active Coolers for cooling Infrared Detector on satellite payloads
Introduction to Air Conditioning
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Hydraulics.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
Harnessing Free Heat. The Energy Harness provides hot water using multiple heat sources, making the best use of low grade heat. It improves the efficiency.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
STARLight PDR 3 Oct ‘01 G.1.1 Rashid STARLight STARLight Thermal Tahir Rashid STARLight Mechanical Engineer (734)
MICE Target Status Chris Booth Sheffield 10 th May 2006.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Spectrometer Solenoid Lead Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab MICO Meeting January 19, 2010.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
MICE Collaboration Meeting CM-151 Is the the pulse tube cooler a must or is it simply better for the MICE AFC module? Michael A. Green Lawrence Berkeley.
Development of a Joule-Thomson Micro Compressor
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
CMS FPIX Cooling Prototype Phase One Estimate and Conceptual Design R. L. Schmitt 10/28/2009.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Close Cycle Dilution for Space Ph. Camus, G. Vermeulen, G. Chaudhry, A. Benoit, F. Martin B-POL Workshop, IAP Paris, 29th July 2010.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
1 Approved for public release, distribution unlimited Workshop on X­ Ray Mission Architectural C oncepts December 14-15, 2011 Approved for public release,
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
National Aeronautics and Space Administration NASA Goddard Space Flight Center A S T R O -H/SXS Low-Power, Fast-Response Active Gas-Gap Heat.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Cryogenics for FPP S. Masi Two inter-related issues: –Cryogenic chain for the focal plane (final temperature 0.1K) –Thermal system to radiatively cool.
Modeling and simulation of cryogenic processes using EcosimPro
Modeling the Adsorption of Mixed-Gases Based on Pure Gas Adsorption Properties Nir Tzabar, Harry J. Holland, Cris H. Vermeer, Marcel H.J. ter Brake Energy,
`` Solid DT Studies - Update presented by John Sheliak - GA Drew A. Geller, & James K. Hoffer - LANL presented at the 16th High Average Power Laser Workshop.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
CM-26 Cooler and Lead Test1 Tests of a PT415 Cooler with HTS Leads in the Drop-in Mode Michael A. Green Lawrence Berkeley Laboratory, Berkeley CA 94720,
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
Large Tonnage Chiller AC Screw. Content Mechanical System Key Components Control Logic Application 2.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
C.KotnigFCC Design Meeting FCC Beam Screen cooling Claudio Kotnig.
LARP Collaboration Meeting Racetrack Coil Fabrication
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Internal Guide : Batch No : 4 Mrs.Punyavathi Madam
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
Ullrich, DESY Dubna GDE XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Water cooling XFEL Desingn of the XFEL water cooling.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
Michael A. Green and Heng Pan
LCWS11 WG4 Fully featured accelerating structure engineering design
Ball Aerospace Scalable Configurable Cryocooler Electronics (SCCE)
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
T5.2: Harmonization - Material and Component Reference
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
SC1R Cold Box PDR Assembly Sequence
JLAB CHL 2K COLD BOX REPLACEMENT
Presentation transcript:

TRL5 vibration-free soprtion-based cooler for the temperature range 15 to 30 K H.J.M. ter Brake 1, H.J. Holland 1, C.H. Vermeer 2, J.F. Burger 3, A. Maas 4, R. Kaal 4, M. Linder 5 (5) (3) (1) (2) (4)

ICEC26-ICMC2016 H.J.M. ter Brake Sorption cooler

Advantages of sorption-based JT coolers: -No vibrations (not measurable) -Long lifetime (no moving parts and physi- sorption is fully reversible) -Low level of Electro Magnetic Interference (only heater current which may be bifilar) -Easier integration (all parts in cold section, no room-temperature compressor) -Flexibility: Same design of compressor can be applied to other T-ranges by changing working gas and/or change low pressure.Disadvantage: -Less mature than mechanical coolers (this project aims atTRL 5 in 2016) ICEC26-ICMC2016 H.J.M. ter Brake

4.5 K cooler system design for operation at L2 (e.g Darwin) ICEC26-ICMC2016 H.J.M. ter Brake bar, 1.9 W in 4.5 K ; 5 mW bar, 4.2 W in 14.5 K ; 35 mW

Helium stage: demonstrator 2005 – 2007 (TRL 4) 4.5 K Helium-stage sorption cooler ICEC26-ICMC2016 H.J.M. ter Brake bar, 1.9 W in 4.5 K ; 5 mW

Helium stage: demo experiments Hydrogen stage: can also be “stand- alone”14.5 K cooler 14.5 K Hydrogen-stage sorption cooler ICEC26-ICMC2016 H.J.M. ter Brake bar, 4.2 W in 14.5 K ; 35 mW

CEC June 2013 H.J.M. ter Brake 9 grams of carbon Hydrogen-stage sorption compressor cells

Hydrogen-stage check valves machined in 316L stainless steel flap: Au layer 10  m flat-on-flat for low pressure (0.1 – 3 bar) knife-edge design for high pressure (3 – 50 bar) ICEC26-ICMC2016 H.J.M. ter Brake

Getter Heat SinkAftercoolerGas gap actuator Pinch off tube ThermocoupleHeater Check valve Hydrogen sorption cooler ICEC26-ICMC2016 H.J.M. ter Brake

Measuring results p low [mbar]T equilibrium [K] ESA requirement: ± 25 mK in 24 h, measured: ± 15 mK (4 mK std) Component and breadboard validation in lab environment: TRL4 (status 2013) ICEC26-ICMC2016 H.J.M. ter Brake

Follow-up ESA project “TRL+ project” (Kick Off: 14 Oct 2013) 1.Establish TRL 5, “relevant environment” >> survive launch mechanical loads! (analysis and shaker tests) 2. Show feasibility at higher temperatures (to 25 K or higher) ICEC26-ICMC2016 H.J.M. ter Brake Tip temperature can be varied by varying low pressure which in turn can be set by the buffer temperature. So, tip temperature is controlled by buffer temperature 107 K 137 K 154 K

TRL+ project: Vibration levels Sinus vibration acceleration levels Minimum random vibration power spectral density Goal required random vibration power spectral density ICEC26-ICMC2016 H.J.M. ter Brake

Chemical getter and connecting tube redesigned to withstand random goal levels. Orientation changed: tube is now better aligned with respect with most important vibrations. Pill and container lighter, now is ca 1 gram. Bracket (connection and fixation of gas line) was made of Al now made of stainless steel. No stress caused by difference in CTE. Spacer spokes: little wider and thicker now which results in a 10% higher conductive heat load through the spacer. T sensor in cell container is removed: may cause leak of hydrogen gas via feedthrough (SPF). In addition unclear what T is measured (carbon or gas) TRL+ project: Compressor-cell redesign ICEC26-ICMC2016 H.J.M. ter Brake

TRL+ project: Check-valve redesign Minor changes: - Tolerances reduced to prevent a too small opening between boss and filter. -Connecting lines laser welded instead of being brazed. (stronger connection and prevents damage during mounting, which in the bread boarding caused gas leakages). - Total mass reduced : compressor cell plus valves now is 368 grams (was 388 grams) ICEC26-ICMC2016 H.J.M. ter Brake

TRL+ project: Compressor and check valves test platform Set up for axial shaker tests Compressor with two knife- edge valves that are tested on pressure drop and leak flow rate prior to assembly Completed compressor platform tested on functional performance prior and after shaking Separate valves will be tested also prior and after shaking ICEC26-ICMC2016 H.J.M. ter Brake

TRL+ project: functional tests ICEC26-ICMC2016 H.J.M. ter Brake

TRL+ project: status and planning Check valves assembled Ready for e-beam welding Next, pressure drop and leak flow test After that add to compressor unit ICEC26-ICMC2016 H.J.M. ter Brake

TRL+ project: status and planning Compressor container filled with carbon, closed (e-beam welded) and gold plated Next, mount in heat sink and e-beam weld Then, combine with check valves and functional tests prior to shaking ICEC26-ICMC2016 H.J.M. ter Brake

TRL+ project: conclusion Check valve pressure drop and leak flow measurements Complete compressor cell assembly Operate existing hydrogen cooler at higher temperatures (15 – 30 K?) Combine compressor cell and check valves and mount on plate Functional test experiments of compressor cell Shaking all three directions in-plane and normal, sinus and goal random Functional test experiments of compressor cell Pressure drop and leak flow measurments of check valves TRL 5 established March April May/June June/July August/September October ICEC26-ICMC2016 H.J.M. ter Brake

Test experiments: results cold tip temperature stabilized by PID controller and heater day 1 day K Helium-stage sorption cooler ICEC26-ICMC2016 H.J.M. ter Brake

Test results (lower pressure, Tcold = 3.15 K)