1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception 03 06 2015 EuroCirCol-1505271400 WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Summary.

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
FCC Horizon 2020 Design Study Proposal Daniel Schulte for the FCC team Preparatory Collaboration Board Meeting, September 2014.
1 Electron Cloud in LHC V. Baglin CERN AT-VAC, Geneva 1. Mecanism and Recipies 2. LHC Vacuum Chambers 3. Diagnostics 4. Conclusions Vincent Baglin Electron.
LHeC Experimental Beam Pipe
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
Damping Rings Y. Papaphilippou, CERN, D. Rubin, Cornell.
Peter Spiller, CBM collaboration meeting GSI-Darmstadt 11. February 2004 Status of the future accelerator project.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Objectives,
EuroCirCol Plan Overview Daniel Schulte for the EuroCirCol team CERN, June 2015.
Beam screens in IT phase 1
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Work.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Preliminary View on the LHeC Experimental Vacuum Chambers Jonathan Bosch - University of Manchester And Ray Veness - TE/VSC J.Bosch and R.Veness LHeC -
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Dr. José Miguel JIMENEZ (Coordinator) CERN, Technology Department 1 FCC Week March, Washington (US)
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
FCC Week 2015, Washington Cooling the FCC beam screens
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015.
ANKA Synchrotron Radiation Facility 1 S.Casalbuoni, E. Huttel, WP4 Coordination Meeting , CERN, Geneva, Switzerland EuroCirCol Kickoff Meeting,
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
GWADW2011 Elba/Italy, 23/May/2011 N. KIMURA and Y. SAKAKIBARA Present Design of LCGT Cryogenic Payload - Status of Cryogenic Design - N. KIMURA*, Y. SAKAKIBARA**,
Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 CERN March’15 EuroCirCol Kick of meeting Study Beam Induced Vacuum Effects.
Tiina Salmi and Antti Stenvall, Tampere University of technology, Finland FCCW2016 Roma, April 13 th, 2016 Quench protection of the 16T dipoles for the.
Title Page Design 3 Vacuum considerations for JLEIC beamline and Interaction Region Marcy L. Stutzman.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
Developing the Collaboration P McIntosh STFC Daresbury Laboratory.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Task 4.3: Mitigate beam-induced vacuum effects (STFC, CERN) O.B. Malyshev and R. Valizadeh, ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK EuroCirCol.
Task 4.3: Mitigate beam-induced vacuum effects (STFC, CERN) O.B. Malyshev and R. Valizadeh, ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK EuroCirCol.
Beam screen cooling: scaling from LHC to FHC Philippe Lebrun FHC meeting on beam pipe design, CERN 20 December 2013.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
WP4 Cryogenic Beam Vacuum System Conception: Activity LNF (task 4.4, 4.6) R. Cimino LNF-INFN, Frascati (Italy) 1.
Results from 2016 COLDEX runs and future experimental plans
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Study of vacuum stability at cryogenic temperature
Francis Perez (ALBA) and Paolo Chiggiato (CERN)
Manufacturing of the first FCC-hh beam screen prototype for ANKA
FCC summary report March 2015 Washington.
Some Thoughts About Possible Measurements with SR at DaFne
Challenges of vacuum chambers with adjustable gap for SC undulators
R. Kersevan, TE-VSC-VSM 30/06/2016
CERN-INFN, 23 Febbraio 2017 Stato del programma 16 T Davide Tommasini.
Cedric Garion, TE-VSC-DLM, WP12
Electron cloud & vacuum pressure observations: 2011 proton run
Hollow e- lens, Cryogenic aspects
Forming a Gender Equality Group
Cryogenic temperature for SPPC
TASK 5.4 MAGNET conceptual DESIGn (preliminary) organization structure
STFC Contributions to the FCC Study
Study of vacuum stability at cryogenic temperature
Beam Pipe Meeting Introduction
Challenges for FCC-ee MDI mechanical design
Update on beam screen issues
Update on beam screen with shielding and other vacuum issues
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
CLIC damping rings working plan towards the CDR
Cryogenic management of the LHC Run 2 dynamic heat loads
Presentation transcript:

1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Summary

Objectives EuroCirCol WP4 – Cryogenic Beam Vacuum Concept To develop the technical design concept for the cryogenic vacuum beam pipe, with constrains: -Beam screen -Cryogenics -Magnet core bore To test a beam screen prototype in the ANKA light source with similar synchrotron light conditions

Team EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Japan KEK Finland TUT France CEA, CNRS Italy INFN Germany KIT, TUD Switzerland EPFL, UNIGE Netherlands UT Spain ALBA, CIEMAT CERN United Kingdom STFC, UNILIV, UOXF CERNIEIO KITGermany INFNItaly ALBASpain CIEMATSpain STFCUnited Kingdom Man power, hardware cost is not included in EuroCirCol

Tasks EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Task 4.1: Work Package Coordination Task 4.2: Study beam induced vacuum effects Task 4.3: Mitigate beam induced vacuum effects Task 4.4: Study vacuum stability at cryogenic temperature Task 4.5: Develop conceptual design for cryogenic beam vacuum system Task 4.6: Measurements on cryogenic beam vacuum system prototype

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Task 4.1: Work Package Coordination (ALBA) ALBA with the assistance of CERN coordinates the work of all other tasks of this work package to ensure consistency of the work according to the project plan and to coordinate the WP technical and scientific scope with the tasks carried out by the other WPs. Video meetingeach 2 months On person meetingeach 6 months week before the FCC Week Specific Meetingswhen required

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Task 4.2: Study beam induced vacuum effects (ALBA, CERN) ALBA will model and compute the cryogenic beam vacuum system, both in static and in time constant (so called “dynamic”).The model will include synchrotron radiation effects. In a second stage, ALBA, in close correlation with CERN, will evaluate options to implement cryophoton absorbers.

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Task 4.3: Mitigate beam induced vacuum effects (STFC, CERN) STFC will study different coatings to mitigate beam induced electron cloud and ion instabilities Compatibility of these coatings with cryogenics temperatures has to be demonstrated, in particular sticking and flaking of coatings after several cool down and warm up cycles. ~2.2 m, ID 67 beam screen Internally coated with amorphous carbon Tests Laser Surface Treatment - Prototype samples of SS+Cu um Investigate other coatings: - NEG, Carbon … coatings

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Task 4.4: Study vacuum stability at cryogenic temperature (INFN, CERN) INFN Frascati will determine vacuum stability and adsorption isotherms at different cryogenic beam screen operating temperature ranges. It will perform complementary studies on beam induced stimulated desorption phenomena by photons, electrons and ions. Absortion isotherms -Validation of temperature window: K -Cryoabsortion surface PSD + PEY (at room temp) (in relation with task 4.6) Photon reflectivity (in relation with task 4.6) -Synchrotron Radiation in grazing incidence PSD + PEY at LN2 (in relation with task 4.6)

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Task 4.5: Develop conceptual design for cryogenic beam vacuum system (CERN, CIEMAT) CIEMAT will closely collaborate with CERN on the mechanical design of the cryo beam screen, ensuring compatibility with fast magnetic transitions and cryogenic cooling concepts CERN will manufacture the beamscreen prototypes and qualify them in one of its magnet test stands at different beamscreen temperatures. Coil diameter 50 mm (from WP5) Inner dimension 32.5mm x 28mm (to be confirmed by WP2 asap) Prototype production

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Task 4.6: Measurements on cryogenic beam vacuum system prototype (KIT, INFN, CERN) KIT will be responsible for the “beam qualification” of the beamscreen prototype supplied by CERN. The goal is to determine synchrotron radiation heat loads and photoelectrons generation inside the beamscreen prototype. This beamscreen will be qualified with beam by installing the CERN COLDEX experiment in the ANKA synchrotron ring and exposing the beamscreen prototype to significant levels of synchrotron radiation. ANKA will assist for the installation and integration of COLDEX carried out by CERN and INFN. INFN will commission the experiment and perform the measurements under CERN advice. Design to be started immediately

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept WP2 + WP4 (close follow needed) - Dimensions agree Injection concern Vertical orbit sensitivity - e-cloud Proper data for PEY & reflectivity for simulation - Input needed for Gas density/lifetime - Impedance Need of real Cu data for simulation

EuroCirCol WP4 – Cryogenic Beam Vacuum Concept WP5 + WP4 (close follow needed) - Coil inner diameter agree ( mm) - Baseline temperature for WP5 is 4.2K but for WP4 is 1.9K - Beam shall pass through the center of the magnets - Test of quench feasible with 2 T room temperature pulsed magnet and beam screen cryo-cooled.

Re-schedule needed… Careful analysis in following weeks