SARMa Emilia-Romagna & Parma Activity report End of June, 2010 Budapest, June, 28th
WP1 - Partner Project Management (of project relevance) ANPAR withdrawal – ER acquisition of activities and budget ANPAR activities revision WP2: international meeting at ECOMONDO, Rimini, Nov WP3: 2 new pilot sites in ER territory, best definition of LCA manual output WP4: Best integration of Recycling in WP4.2 (ER task leader) in term of Sustainable Supply, Planning, GIS Proposal under valuation by JTS New partnership agreement under signing ANPAR budget revision
WPCOMPLETEDIN PROGRESSNEXT STEPS OPEN PROBLEMS WP 2.2 Parma (Nov 2009) SARMa presentation Local Bologna (Dec 2010) WP3 – Pilot sites, GIS Regional\national Parma (May 2011) WP4 – Model sites, GIS, SSM Regional\national - WP 2.3 Bologna (Jun 2009) Project Kick-off Rimini (Nov 2010) Ecomondo WP3.3, 3.4 Recycling International -- WP2 – Meetings directly managed by ER+Parma
WPCOMPLETEDIN PROGRESSNEXT STEPSOPEN PROBLEMS WP3.1 pilot site quarry restoration SDB, BSR, PSR--- WP3.2 pilot site Illegal quarrying SDB, BSR, PSR PSR update final results of LIDAr remote-sensing experimentation -- WP3.3 coord. (See Blengini report for details) - Coordination BSR-R, SDB-R LCA document, C&DW document Ecomondo Nov 2010 C&DW manual will be presented a draft of the LCA guidelines will be provided Several documents by other partners are still missing: see Blengini report WP3.3 pilot sites recycling - SDB-R, BSR-R for the new pilot sites “Madregolo” and “Castellarano” - Some problems in collecting required information at “Castellarano” WP3.4 synthesisSQSQ-R- In Italy data are difficult to gather at national/regional scale (provincial scale may be the best) WP3 – 3.3 Task coordination (dark colors); 3.1, 3.2, 3.4 contributions
WP ACTIVITIESCOMPLETEDIN PROGRESSNEXT STEPSOPEN PROBLEMS WP4.1 SQ SQ4.1 (some details are under revision of translation) - How about the SSM opinion pool by Tamas ? (for which stakeholders? In national language?) WP4.2 coordination Preparation of SQ4.2; GIS activities workplan Definition and preparation of BSR for 3 Model Site (MS) 4.2 Collecting SQ4.2; Sinthesis Report 4.2 (+statistical synthesis from web questionnary ) Synthesis Report 4.2: 3 boxes Model Sites: Pella (???), Trebbia (natural area), Styria (economy) 1 box GIS-ER GIS activities require contributions of Deborah and Fotini (Nikos); no contribution from Pella for Model Site WP4.2 SQ Model site (MS) quarrying in natural area SQ4.2 draft; Model Site Report (MSR) draft SQ4.2 MSR - WP4/5-- Contr. to Recommendations for GIS; Contributions to WP4+5 final reports about “Planning for sustainability” - WP5.3- Contribution for WP4+5 manual: Best Practices for post- quarrying restoration - WP4/5 – 4.2 Task coordination (dark colors); 4.1, 5.3 contributions
WP ACTIVITIESCOMPLETEDIN PROGRESSNEXT STEPSOPEN PROBLEMS WP 2.2 Meeting Parma SARMa presentation (11/09) Meeting Bologna WP3 (12/10)Meeting Parma WP4 (05/11)- WP 2.3KOM Bologna (6/09)Ecomondo WP3.3, 3.4 (11/10)-- WP 3.1 (Lanca dei Francesi) SDB, BSR, PSR--- WP 3.2 (Taro River) Required: SDB, BSR, PSR* Indirect: LIDAr survey of the Taro river alluvial fan Integration to PSR (addendum including the final results of LIDAr remote-sensing sperimentation,). -- WP 3.3- SDB-R, BSR-R for pilot sites “Madregolo” and “Castellarano”. - Some problems in collecting required information at “Castellarano” site. WP 3.3 coordination- Coordination BSR-R, SDB-R LCA document, C&DW document Meeting Rimini (Ecomondo): 3-6 Nov 2010 C&DW manual will be presented a draft of the LCA guidelines will be provided Several documents are still missing: see note below WP 3.4SQSQ-R- Some data are difficult to gather at national/regional scale, whereas at provincial scale may be easier. WP 4.1SQ4.1*- SSM opinion pool Tamas ??? (for stakeholders? national language?) WP 4.2-SQ4.2 (final draft); PSR Trebbia (final draft)Box GIS-ER in Sinthesis Report 4.2- WP 4.2 coordination Preparation of SQ4.2; GIS activities workplan Preparation of BSR for pilote site 4.2 Collecting SQ4.2; Sinthesis Report 4.2 (+statistical synthesis from web questionnary ) 3 Boxes pilot-sites 4.2: Pella (???), Trebbia (natural area), Styria (economy) in Sinthesis Report 4.2 GIS activities require contributions of Deborah and Fotini (Nikos); no contribution from Pella for Pilot Site. WP 4/5-- Contr. to Recommendations for GIS; Contributions to WP4+5 final reports about “Planning for sustainability” - WP Contribution for WP4+5 manual: Best Practices for post-quarrying restoration - ER+Parma Technical report (June, 2010) - summary table Dark colors for activities at Project coordination level – ER task leader