ESS 2014-04-03 The INFN in-kind contribution to the accelerator of the European Spallation Source.

Slides:



Advertisements
Similar presentations
Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
ESS SPOKE LINAC (WP4) Sebastien BOUSSON Guillaume OLRY ESS/SPL Meeting - Lund – 2010/07/01.
Requirements Structure and Status for NCFE
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
H. Danared | Sw/Fr Coordination Committee | Page 1 Swedish/French Coordination Committee Håkan Danared Saclay, 13 January 2015.
ESS DTL beam commissioning
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
ESS cavities interfaces
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Anders Sunesson RF Group ESS Accelerator Division
1 1. Some recent views ( ) 2 Linac tunnel
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Alexander Aleksandrov Oak Ridge National Laboratory
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
The ESS Linear Accelerator
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
CSC, Status of HIPPI – September 2008 M. Vretenar, A. Lombardi.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
LASA status for medium-beta cavity Paolo Michelato.
Drift Tube Linac CDR Introduction, general aspects
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
DTL RF properties F.Grespan LNL _06_22 CDRF. Grespan.
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
H. Danared | Collaboration Board, March 2014 | Page 1 Status of In-Kind Contributions to Accelerator Håkan Danared Kastrup, 14 April 2014.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
Accelerator/ Medium Beta Cavities Rocco Paparella on behalf of INFN Milano – LASA ESS Team April 21st, 2016.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
WU2 - Proton Source & LEBT Schedule 2013 L. Celona Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
DTL F.Grespan – A.Pisent – P.Mereu – M.Poggi-M.Comunian-R.De Prisco LNL– 05/05/2014F. Grespan.
WP High Beta Cavities Delivery
WP5 Elliptical cavities
ESS cavity procurement via in-kind contributions
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
SPES-RFQ review Introduction, general aspects
1- Short pulse neutron source
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
ADS Accelerator Program in China
Olivier Napoly, coordinator CEA/Irfu
Pulsed Ion Linac for EIC
Advanced Research Electron Accelerator Laboratory
Physics Design on Injector I
Ciprian Plostinar Workshop on Testing and Commissioning
Daresbury ESS In-Kind Contributions
ISRC and LEBT Vacuum System Design
Introduction CDR Normal Conducting Linac LLRF
Elettra – Sincrotrone Trieste S.C.p.A.
European Spallation Source ERIC
STATUS of INFN contribution to ESS-accelerator
Status of the ESS High Power RF Systems
RF introduction Anders Sunesson RF group leader
Accelerator Installation Schedule
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

ESS The INFN in-kind contribution to the accelerator of the European Spallation Source

ESS INFN contribution to the European Spallation Source INFN is in charge of the management of the WP3-Normal Conducting Linac 1.Ion Source & LEBT (INFN-Laboratori Nazionali del Sud, Italy) 2.RFQ (CEA-IRFU, France), 3.MEBT (ESS Bilbao, Spain) 4. Drift Tube Linac (INFN-Laboratori Nazionali di Legnaro, Italy) 5. INFN-LASA-Milano (superconducting elliptical cavities for WP5) construction of medium beta section (strong industrial background for series construction) 6.Potential: LNL for ICS ; LNS, LNL and Milan for support to commissioning management WP3 is agreed with ESS Accelerator Division, 6 under discussion INFN is in charge of the management of the WP3-Normal Conducting Linac 1.Ion Source & LEBT (INFN-Laboratori Nazionali del Sud, Italy) 2.RFQ (CEA-IRFU, France), 3.MEBT (ESS Bilbao, Spain) 4. Drift Tube Linac (INFN-Laboratori Nazionali di Legnaro, Italy) 5. INFN-LASA-Milano (superconducting elliptical cavities for WP5) construction of medium beta section (strong industrial background for series construction) 6.Potential: LNL for ICS ; LNS, LNL and Milan for support to commissioning management WP3 is agreed with ESS Accelerator Division, 6 under discussion INFN-LNS INFN-LNL INFN-MI

ESS The PS-ESS very flexible magnetic system Magnet manufactured by Sigma-phi Magnetic system already delivered at LNS Ready for installation!

ESS LEBT Layout 234 mm Extraction 239 mm Vacuum + Utilities 425 mm Solenoid 128 mm Gate valve 325 mm Iris 540 mm Iris utilities + Diagnostics + Vacuum + Chopper 128 mm Gate valve 210 mm Collimator 2654 mm from plasma electrode to LEBT collimator

ESS ESS test area at LNS Particular attention in the grounding to minimize the effects of sparks

ESS Status and open items Sites LNS siteComplete except for interlocks ESS-Lund sitein progress, interaction supp. by Lead Engineer Proton source (PS-ESS) and accelerator column HV platformTo be ordered, short delivery time Power supplies (High current, High voltage)Delivered Microwaves equipmentOrdered Magnetic systemDelivered Plasma chamberOrdered Mechanical integration and LEBTalready defined Extraction systemOrdered Interfaces MPSdefinition in progress Control interfacedefinition in progress

ESS Technical performances (SoW) 7 The DTL (Drift Tube Linac) cavity is constituted of 20 modules, assembled in 5 tanks, composed of 4modules each, for a total length of approximately 40 m. CERN-INFN prototype First tank Drift Tube Linac

ESS ESS DTL properties: design parameters fixed Tank12345 Cells E 0 [MV/m] E max /E k 1.55 φ s [deg]-35, L Tank [m] R Bore [mm] L PMQ [mm]5080 Tun. Range [MHz]±0.5 Q0/ Optimum β Beam Det [kHz] P cu [kW] (no margin) E out [MeV] P TOT [kW]

ESS Prototyping LNL _03_16 PMQ fully tested Test of Cu-plating on Stainless steel Stem order to be placed. It will make them more rigid compared and will allow for a larger bore for the BPM and corrector cables. BPM: feedthrough to be welded on the BPM stripline EBW on Brazing: DT brazed and EB-welded. Vacuum test ok. Next step: section and micrography

ESS WP03 Master Schedule

ESS Medium β-cavities contribution to ESS Up to the end of 2014 INFN-Mi involved in XFEL; Expression of interest for in-kind contribution to ESS of medium-  cavities; Well consolidated expertise + good connection with industries for series production

P. Michelato, INFN LASA Miniworkshop su Acceleratori (17-Feb-2015, LNL) 12 XFEL 1.3 GHz SC cavities: Cavities Performances (EZ) Average maximum gradientbefore re-treatment: (29.1 ± 5.9) MV/m after re-treatment: (32.0 ±3.8) MV/m Average usable gradientbefore re-treatment: (25.8 ± 6.1) MV/m after re-treatment: (29.0 ±3.6) MV/m 1 st test of cavities (as rrived from EZ) E acc Re-treatment typically due to field emission Cavities “cured” mainly by HPR (done both at DESY and at the Company) XFEL goal: E acc ≥ 23.6 MV/m, Q 0 ≥ 1▪10 10

ESS Medium Beta Cavities Technical performances 13 INFN Medium Beta Cavities Technical Performances RequirementsMedium beta Frequency (MHz) Geometric beta0.67 Nominal Accelerating Gradient (MV/m)16.7 Epk (MV/m)< 50 Cell coupling k(%)≥ 1.5 RF peak power (kW)1100 Q ext Q0 at nominal gradient>

ESS Elliptical SC cavities: in-kind contribution Deliverable no. Deliverable 1Medium beta pre-series cavity, vertically tested at LASA 2High beta pre-series cavity, vertically tested at LASA From 3 To 38 (# 36) Superconducting RF cavity for the medium beta section of the linac, equipped of all the necessary ancillaries (helium tank, flanges, vacuum valve, frame, RF antenna and pickup), tested vertically and delivered at the cryomodule assembling facility. Two spare cavities could be foreseen during the series production (constituting Deliverable nos ). RI and EZ keep average production rate of 4 cav/week End of XFEL cavities production September 2015 First 4 series cavities delivered by end 2017

ESS In-kind contribution Some preliminary work, for about 6M€ (a great part from INFN) has been carried out in the frame of Accelerator Design Update and the contract for this phase was concluded in Dec.2014 with the acceptance of ESS-AB of these pre- construction contributions as in-kind. The IK contribution related to Isrc & LEBT, DTL and WP3 management is well defined The IK contribution related to medium beta superc. cavities has been recently agreed and the details of integration in cryomodules will be defined soon. The amount of contribution related to ICS and to the support to commissioning has been estimated by INFN but not yet defined in details The amount of INFN contributions should account to about 33 M€ As the conditions for the signature of in-kind contract are not yet mature, a preliminary set of “Heads of Agreement” are going to be signed. IK contract preparation is under way.

ESS ISLEBT+WP3 managmtDTLSup. cavities Control system, support to commissioning (INFN) Totale INFN33,300 k€ INFN contribution to ESS

ESS INFN33,100 k€ ELETTRA Ts30,050 k€ CNR20,050 k€ Total83,200 k€ 3 institutes’ contribution to ESS ( ) Cash contribution 20,800 k€, Grand total 104 M€ (+6 preconstruction=110 M€, i.e. 6%)

ESS Contract between Italy and ESS ERIC will be established in summer 2015 Italy should sign before end of the year (no VAT  urgent) Heads of Agreement approved by Executive board and Directors’ Council, to be signed by INFN President and Elettra President before June 10th In-kind Agreement to be prepared and signed with or before ERIC signature Human resources at LNL and Milan-LASA to be increased