May 12, 2016 Multi-Material B.C. (MMBc) City of Vancouver Recycling Program.

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

BC Packaging and Printed Paper Producer Responsibility Program Next Steps for Packaging and Printed Paper Program in British Columbia UBCM Annual Conference.
1 Geoff Rathbone General Manager Solid Waste Management Services City of Toronto In-Store Packaging Report 2008 RCO Annual General Meeting November 7,
West Michigan Transit Linkages Study Wednesday, June 4 th, :00 a.m. Grand Valley State University Kirkhof Center Conference Room 2266.
OUTSOURCING INDUSTRIAL WASTEWATER TREATMENT Jerzy Kołłajtis – Magda Trybuch –
The Dorset Waste Partnership Louise Bryant Service Development Manager.
Solid Waste Management In the Thompson-Nicola Regional District Presented By Mr. Peter Hughes and Mr. Martin Dickson City of Merritt Council Meeting May.
Zero Waste Operational Plan Policy & Services Committee 3/13/2007.
Waste Ban Compliance Training Program Administrative Compliance Requirements April and May 2006 Administrative Compliance Requirements April and May 2006.
2013 BUDGET General Fund Revenues$84,870,998 Expenditures Divisional 69,635,424 Non-Divisional 5,695,509 Transfers 9,540,065 84,870,998 $ Nil * Capital$14,788,522.
Presented to SWAC February 16, 2012 City of Cleveland Automated Waste Collection And Curbside Recycling Program.
MWA Spring Conference May 14, 2014 Preparing to Launch MMBC’s PPP Program.
LOCAL REGULATION AND CLIMATE CHANGE QUICK TELECONFERENCE American Bar Association Section of Environment, Energy, and Resources Climate Change, Sustainable.
MULTI-FAMILY SOLID WASTE COLLECTION WHY FOOD SCRAPS IN GARBAGE ARE A PROBLEM ? More than 40% of garbage is food scraps Tipping fee for garbage $109/MT.
Building a Recycling Program Through Innovation and Creativity instead of Big Budgets Financial Sustainability – Recycling in the City.
Feb 17, 2010 Revised Blue Box Program Plan Draft for Consultation.
2011 Draft Budget February 3,  Current 2011 draft budget is $12, 088,673, an increase of $497,449 from the 2010 budget or an increase of 4.29%
Resource Recovery Legislation Dave Gordon MWA Spring Workshop May 2015.
Context Report and Long Range Financial Plan Presentation to City Council May 11, 2004 E D M O N T O N.
1 Bringing Curbside Recycling to Delaware A Proposal by: The Recycling Public Advisory Council (RPAC) The Delaware Solid Waste Authority (DSWA) The Department.
Rural Waste Collection Options Department of Budget and Management 01/21/2014.
WHAT’s NEXT 15 TH OCTOBER DAVID CARTER PRESIDENT PACKAGING COUNCIL OF NEW ZEALAND ACCORD? AFTER THE PACKAGING.
Municipal Waste Statistics in Belarus. The owner of municipal waste statistics in Belarus is the Ministry of Housing and Utilities.
1 Achieving 60%+ recycling Proposals to introduce weekly recycling collection.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
City of Loveland Solid Waste Division Diversion Versus Disposal: Determining the Costs Diversion Versus Disposal: Determining the Costs.
Steward Packaging Initiatives Sherry Arcaro, Director of Field Services.
Changing the Way South Carolina Values Trash Kristen Brown – Green Waste Solutions April 10, 2013 Turning waste into new products that can be sold to consumers.
Nirmala Menikpura Institute of Global Environmental Strategies (IGES) Life cycle greenhouse gas emissions and other impacts from recycling activities:
MED 2007 – 2013 Low Cost Zero Waste Municipality The Integrated Decision Support Tool under development within Zero Waste project: the 1 st step towards.
2013 Budget Presentation. Outline Planning Framework Proposed Tax Rate Increase Analysis of cost drivers Detailed work plan Strategic Linkage Timeline.
Town of Plymouth Solid Waste Management Town of Plymouth Department of Public Works November 26, 2012.
Payment Mechanisms for PPP Development off PPP and Implementation Possibilities in Latvia Conference, September 2008.
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
Finance Department Presentation to the City of Houston Budget and Fiscal Affairs Committee First Quarter Review General Fund Five Year Scenario and FY2012.
FY Budget Briefing General Fund Operating Budget and Fees & Charges.
Utilities Department Solid Waste System Tipping Fees November 11, 2008.
DSM E NVIRONMENTAL S ERVICES, I NC. Analysis of Enhanced Residential Recycling System for New Castle County Prepared for the Delaware Recycling Public.
1 11/8/ Waste Pro of South Carolina and Greenspace Louis J. Diaz Region Vice President South Carolina and Coastal Georgia.
CONVERSION TECHNOLOGIES MARKET IMPACT ASSESSMENT Preliminary Results Workshop April 15, 2004 Susan V. Collins Hilton Farnkopf & Hobson, LLC.
9/15/031 Fort Collins, Colorado “ Pay as You Throw” Trash Rates
Kindersley Waste & Recycle: Landfill Impacts SWANA Regional Waste Management Workshop November 16, 2015 – Saskatoon, SK.
Region 2000 Solid Waste Management Initiative January 18, 2007 Virginia’s Region 2000 Local Government Council Briefing Region 2000 Solid Waste Management.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
Recycling of Solid Waste February 10, 2016 Russell Schreiber, P.E. Director of Public Works.
Solid Waste Services Residential Solid Waste Collection Options April 6, 2016.
Community Stakeholders Group Workshops A GENDA I TEM 7.1 UPDATE: Single-Use Bag Waste Reduction.
Environment Protection (Waste to Resources) Policy 2010 November 2012 Image: worradmu / FreeDigitalPhotos.net.
Curbside Recycling: Home. Work. Play. Kate Bailey, June 2016.
1 Transportation Impact Fees and Street Maintenance Fees Presented to the City Council by the Planning and Development Department January 21, 2010.
1 REFUSE AND RECYCLING STUDY COLLECTION ALTERNATIVES AND COST COMPARISONS May 18, 2009.
Implementing Packaging and Printed Paper Stewardship Plan Southern Interior Waste Manager’s Association Annual Conference September 19, 2013.
Metro Vancouver New Waste-to-Energy Capacity Project SIWMA Conference, Pemberton September 20, 2013 Sarah Wellman, Acting Project Manager.
Waste Diversion Planning
Solid Waste Draft AMP 2018/2021.
Portsmouth Solid Waste Disposal Critical Decisions
Pay-as-You-Throw for Kingston MA
Proposed Draft Financial Plan April 10, 2017
City of Durham Solid Waste Management
Curbside Waste Collection on Private Roads
Developing a MRF Public-Private Partnership in the City of Dallas
Curbside Collection of Leaf & Yard Waste
Recycling Reimagined Overcoming Today’s Challenges…
Mecklenburg County Solid Waste FY 2018.
Hybrid Service Delivery Model
City of Cornwall Solid Waste Management Master Plan.
Central Elgin Waste Management Service Delivery
Public Works Department October 2016
SWAC – Agenda 1/22/19 1. Introduction / Approval of Minutes
City of Chelan Recycling Options
Presentation transcript:

May 12, 2016 Multi-Material B.C. (MMBc) City of Vancouver Recycling Program

2 tier Municipal Government –Metro Vancouver = Regional 24 local municipalities Total Responsible for transfer and disposal (except for City of Vancouver) –City of Vancouver (CoV) = local (2011) Responsible for collection Owns the only MSW landfill Owns transfer station 2 Background

Vancouver historically provided recycling services – Single and Multi-Family, Depots Single Family Collection with Union staff Multi Family approx bldgs. –1/3 City staff 1/3 Contracted Depots at landfill and transfer station Processing contracted –Operates as a Utility with annual rate based on net operating costs 3 Background

BC Environmental Management Act (2004) Recycling Regulation – Schedule 5 Packaging & Printed Paper (2011) Producers and Consumers Now Responsible for:  75% recovery rate of all recyclables  Producer arranges collections, cost, and recycling of PPP  Stakeholders should have input into plan, any transitions and operations  No incremental cost to taxpayers  Implement program by May 19, 2014 (CONFIRMED)

Draft plan submitted to Province late 2012 –Ignored municipal governments –Assumed they would do all collection Municipal feedback –Keep us involved –Didn’t believe MMBC could deliver entire province in time available 5 MMBC History/Timelines

Adjusted plan to support municipal involvement Surveyed municipal costs for benchmark Submitted final plan w/o financials in April 2013 –Short on details – left to implementation –Included opportunity for contracts with Municipalities 6 MMBC History/Timeline

Developed draft contracts –Modeled after municipal contracts –One sided, overly prescriptive, downloaded all risks, inadequate payments –Separate glass –Max 3% contamination –Significant penalties Had to indicate acceptance by Nov 29, 2013 Negotiated separately with individual municipalities 7 MMBC History/Timelines

City Staff’s Risk Assessment to Accept MMBC Contract  Significant savings but does not cover all costs  Utility rate charge reduced but not eliminated  Terms not acceptable for long term contract, however:  Term will be limited; City can provide 6 mos notice at any time  MMBC not able to take on CoV work at this time  Incentive provides some relief to utility rate in interim  Operational adjustments required to:  Accommodate new PPP materials – more volume expected over time  Manage glass separately – service delivery options under review  CoV recycling truck fleet for SF (30 trucks) is due for replacement in 2016: ~ $8 M  Existing Multi-Family contract ends in May 2016 – MMBC’s multi-family approach is flawed 8

Staff Recommendation to Council That Council authorise the City Engineer to advise MMBC that the City is interested in continuing to provide recycling services to the residents of the City of Vancouver consisting of: single-family curbside recycling multi-unit residential building (MURB) recycling depot recycling at the Vancouver South Transfer Station and Vancouver Landfill under contract to MMBC subject to negotiation of a mutually agreeable contractual and financial arrangement 9

Contracts Contracts signed Nov. 30, 2013 –Single-family collection – 5 years to Nov 30, 2018, commitment to review after 2 years –Multi-family buildings –2 ½ years to April 30, 2016 Aligns with expiry date of City’s apartment recycling contract MMBC taking responsibility after that Contracts require Adding new materials Separate collection of glass 10

MMBC Additional Materials SF CURBSIDE, MURBs & DEPOTS Paper Containers Milk cartons Soy tetrapaks Ice cream tubs Microwavables Plastic Containers Plastics with resin codes Metal Containers Aerosol cans DEPOTS ONLY Polystyrene Foam Cushion packaging Takeout containers Styrofoam cups Some Plastic Film Grocery bags Dry-cleaning bags Bread bags Toilet paper overwrap 11 Spiral-Wound Cans

Single Family Recycling: –5 year contract with MMBC (Nov to Nov. 2018) Recycling delivered entirely by City crews Requires separate collection of glass Option for without cause termination of contract on 6 months notice 109,000 SF units Revenue from MMBC $38.50/unit = $4.1M/yr COV cost to deliver ~ $9.2M/yr 12 CoV Contracts with MMBC

Multi-Family Recycling: –Ends no option to extend –Combination of contract and City services Private Contract for majority of MF buildings – ends April 2016 COV service for smaller buildings within residential routes 169,000 MF units Revenue from MMBC $23.75/unit - $3.9M/yr COV cost to deliver ~ $3.2M/yr 13 COV Contracts with MMBC – as of Nov 2013

2 years in –Gap remains at $4-5M/yr Could be used for other services (Public Realm Cleanliness) –Need to buy new Trucks $7-8M Capital Contract life too short to amortize –Multi-Family Contract Ending Increases the financial burden on SF –Contamination is a growing concern –Communities with MMBC delivered service report positive results (mostly smaller than CoV) 14 City Decision

15 Recycling Funding Gap ( )

16 SF Recycling Rates once MMBC MF Contract ends Before MMBC ( ) 169,000 MURB Units 109,000 SF In Contract with MMBC (2015) 169,000 MURB Units 109,000 SF After MMBC MURB Contract Ends ( ) 109,000 SF Only Utility fee drops Utility fee more than doubles Net Program Cost: $5.1M Net Program Cost: $6.2M Net Program Cost $8.0M Proportion of Utility Fees Proportion of Utility Fees Proportion of Utility Fees 55% MURB 60% MURB 45% SF 40% SF 100% SF MURB revenues from MMBC & utility subsidize SF Curbside rate

Advance discussions/review with Council to set the stage and obtain feed back. Councils Biggest issues were: –Job loss – had to guarantee no job loss and work with Union –Service quality/levels – MMBC indicated they would maintain City service levels –Loss of control and backsliding on diversion – By-law to Mandate Recycling at the building level for all sectors 17 How did we deal with divesting recycling?

Expected Transition date Oct. 3, 2016 Joint Steering committee with MMBC Joint focus is on minimizing impact to the public –Seamless service change –Gradual transition of 311 service Working closely with MMBC and their selected contractors –Open sharing of info –Joint efforts around communication –Minimize barriers to cooperation 18 Status

Questions? Albert Shamess – Director Waste Management City of Vancouver MMBC – website 19