HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *

Slides:



Advertisements
Similar presentations
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Advertisements

Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW April 2015.
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Target conceptual design WP6, ESR9 CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Serena Cimmino – Stefano.
Final Review Meeting, September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
Design of electrostatic septum for slow extraction from J-PARC main ring 2005, March 2nd ICFA septa workshop 2005 Acc. Lab., KEK M. Tomizawa, Y. Arakaki,
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Mid Term Review Meeting, 26 September 2012P. FARANTATOS1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Mid Term Review Meeting, 26 September 2012E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
1 C osmic dust R eflectron for I sotopic A nalysis CRIA LAMA (A cria is a baby llama)
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Heat load of the radiation cooled Ti target of the undulator based e+ source Felix Dietrich (DESY, TH-Wildau),Sabine Riemann(DESY), Andriy Ushakov(U- Hamburg),
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
11/4/2005OLAV 1 Workshop CERNW. Maan Fast Vacuum Valves at CERN -Introduction to fast valves -History of fast valves in use/used at CERN -LEP fast shutters.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
CATHI Final Review Meeting, September 2014E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
The HIE-ISOLDE Faraday Cup
Consolidation and Upgrade plans for the LHC Vacuum System
HIE-ISOLDE Design Study Richard Catherall EN-STI-RBS ISOLDE Workshop and Users Meeting th – 27 th November 2013.
High Resolution Separator
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
C.KotnigFCC Design Meeting FCC Beam Screen cooling Claudio Kotnig.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
Pekka Suominen 2010 CERN Plasma ion sources for radioactive molecular ion beams.
Mid Term Review Meeting, 26 September 2012M.AUGUSTIN1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Michał Matusiak Sławomir Wronka
Beam Wire Scanner for PS/SPS/PSB Mechanical 3D Model Review (for BE/RF-ABP Impedance meeting 02.Nov.2015) Dmitry Gudkov Mechanical Engineer BE/BI-ML.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Status of the Design Study Richard Catherall EN-STI-RBS.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
Mullard Space Science Laboratory Using a CCD for the direct detection of electrons in a low energy space plasma spectrometer A CCD in place of an MCP:
LINAC3 UPGRADE Strategy for the hardware modification of the GTS-LHC 18/3/2015 Ville Toivanen.
HIE-ISOLDE Workshop, 29 November 2013M. COLCIAGO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
The definition of the Earth system or grounding: the electric connection between the work of intentionally electrical device or network devices on the.
BSRT UPDATE LMC 02-OCT-2012 F.Roncarolo on behalf of the BSRT team W.Andreazza, E.Bravin, A.Boccardi, J-J.Gras, A.Goldblatt, M.Hamani, T.Lefevre, R.Jones,
Mid Term Review Meeting, 26 September 2012A. Shornikov 1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
Mid Term Review Meeting, 26 September * This research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
Seungyu Rah (Pohang Accelerator Laboratory, POSTECH, Korea) Nov
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
Halo Collimation of Protons and Heavy Ions in SIS-100.
WP1: Superconducting Cavity Developments and Tests Walter Venturini Delsolaro Mid Term Review Meeting, 26 September 2012 CATHI Marie Curie Initial Training.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Report Technical Director Storage-Ring-Installation Completed
I. Bergevoet - Training preparation
First ideas on particle free installation of BESSY VSR
Detector building Notes of our discussion
PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet
Sub-system integration for the VBOX
Installation of an Instrument on a CERN machine
Hosting Orsay Walid KAABI
Target and Horn status report
ISOLDE Front-End design review – Details of previous faults
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Presentation transcript:

HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the European Community’s Seventh Programme under contract number (PITN-GA CATHI)

HIE-ISOLDE Design Study Outline Brief description of the ISOLDE-frontend Expected requirements for HIE-ISOLDE Extraction optics From single stage to double stage extraction Prototype Thermal, electrostatic and particle tracking simulations Off-line lab 2

HIE-ISOLDE Design Study ISOLDE-frontend For ISOLDE, the frontend is the machine that hosts the target chamber and produces the radioactive ion beams (RIB) There are two of these machines installed On-line at ISOLDE Frontends (1,2),3,4 Frontends (5),6,7,8,9 Much accumulated experience at ISOLDE… Ready for another frontend upgrade!

HIE-ISOLDE Design Study ISOLDE-frontend Target chamber coupling Vacuum …to be improved: Vacuum Target coupling Electrical connections Target cooling Target valve Ion extraction system Target valve

HIE-ISOLDE Design Study Requirements for HIE-ISOLDE HIE-ISOLDE will bring an important increment in the radiation levels at the target area from target: 6.3 Mgy → 31.5 MGy Only few polymers present a radiation hardness high enough to resist the HIE-ISOLDE expected doses These materials are often essentials for vacuum seals as well as for thermal and electrical insulations H. Schönbacher, A. Stolarz - Iycka. CERN Report: COMPILATION OF RADIATION DAMAGE TEST DATA. PART I: Cable insulating materials.

HIE-ISOLDE Design Study Extraction optics The positioning of the extraction electrode represents, at the moment, a degree of freedom for the extraction optics The electrode tip is removable. This operation requires human intervention, but it’s necessary when this tip gets dirty Neutral material can condensate on the insulator surface, worsening its performance The extraction system mechanism allows the axial positioning of the electrode The presence of a mechanism represents by itself a factor of mechanical failure risk The system takes between one and two minutes while performing its entire path; no fast valve closing is possible in case of emergency

HIE-ISOLDE Design Study Extraction optics For a single electrode: Close to the electrode the gradient is bigger than 1kV/mm 1kV/mm

HIE-ISOLDE Design Study Extraction optics Extracting with two stages can reduce the mentioned risks 60 kV57 kVGround 1kV/mm

HIE-ISOLDE Design Study Electrode prototype A prototype has been designed, constructed and assembled. The main idea: Electrode – valve integration

HIE-ISOLDE Design Study Extraction optics Thermal simulations Electrostatic and particle tracking simulations The thermal contact conductivity value becomes crucial for this analysis thermal measurements ongoing The minimum beam losses against the electrode is the optimization criterion Beam losses measurements ongoing

HIE-ISOLDE Design Study Extraction optics Optimization with particle tracking Beam losses For larger acceleration distances the beams are smaller and easier to transport to the ground electrode. The aperture doesn’t seem to produce any effect on the focusing, but for larger acceleration distances the largest apertures present beam losses

HIE-ISOLDE Design Study Extraction optics Setup for measurements on electrode: Insulated and modified “valve”: -Electrode body integrated -Instrument ports

HIE-ISOLDE Design Study ISOLDE Off-line lab 2

HIE-ISOLDE Design Study Summary Currently there are installed and operating 4 frontends and one spare frontend HIE-ISOLDE will require an upgrade of the frontend in terms of safety but keeping the beam quality The extraction system is targeted to be upgraded A two stage extraction prototype has been constructed and is being tested at the new ISOLDE off-line lab 2

HIE-ISOLDE Design Study Thank you for your attention! Questions?