Indian Creek Golf Club October 13, 2015. Lakes Course Condition - Summary Tees – Very good condition, needs typical fall/winter maintenance Fairways –

Slides:



Advertisements
Similar presentations
Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
Advertisements

Simple Technique to Introduce New Grass on an Established Course.
Bunker Maintenance and Bunker Renovations
BOLTON RESERVOIR 2012 BOLTON RESERVOIR CLEANING AND INSPECTION.
San Juan County Solid Waste: Funding. Solid Waste Funding Current Solid Waste Revenue Current Solid Waste Revenue Rate Structure used to collect revenue.
Oakhurst CC Jon Christenson Golf Course Superintendent 2013 Fall Project Update.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
2010 C ITY OF E LMIRA B UDGET P ROPOSAL November 2009 John J. Burin, City Manager David Vandermark, City Chamberlain C ITY OF E LMIRA 2010 BUDGET PROPOSAL.
City of Gooding FLOOD IRRIGATION SYSTEM Town Hall Meeting September 5, 2013.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
to 2015 Operating Budgets Governance & Priorities Committee March 7, 2013.
Storm Recovery David V. Bloniarz USDA Forest Service
Projects Ce. Sodding Grass Nr 7 Nr. 7 Fertilizing and Rehabilitation of Fairway.
NGF - KEEPING GOLF BUSINESSES AHEAD OF THE GAME SINCE SOUTH U.S. HIGHWAY ONE, SUITE 401, JUPITER, FL PHONE: ∙ FAX:
Cultivation & Layering Information courtesy of Texas A&M University Turf Grass
Www. the-gtc.co.uk Its All About Standards Presentation to the Golf Union of Wales by David Golding GTC Education Director.
Public Transit Department Bus and Fuel Procurement Strategy AzTA/ADOT Transit Conference April 2013.
Completion of Winter Projects. Bunker Reconstruction Nr. 4 Pre - Construction.
2016 BUDGET OVERVIEW SANGER, TEXAS. BUDGET PHYLOSOPHY Conservative revenue estimates based on history. Expenditures based on history and anticipated cost.
SAGHA Annual Homeowners Meeting August 20, Agenda  Open Board Positions Resolution  Year in Review  Treasurer’s Report  Common Area Items.
2013 Grounds Schedule. MondayTuesdayWednesdayThursdayFridaySaturdaySunday January 2013 MondayTuesdayWednesdayThursdayFridaySaturdaySunday.
FY Budget April 24, 2014 Personnel and Debt Prepared by: Dana P. Hlavac, Interim Budget Manager and David Felix, Finance Manager.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Air Estates/Bald Eagle Estates) Improvement Project December 13, 2010.
Salt Lake City Golf Division 2008 Overall Chart Report for 2,178 surveys received *service provided by Six Star Solutions, Inc*
The Villages Golf and Country Club 2009/2010 Operating and Reserve Budget Presentation FINAL DRAFT – APRIL 22, 2009.
Maintaining Stormwater BMPs: RWMWD 2013 BMP Maintenance Pilot Program Paige Ahlborg Stormwater U April 1, 2014.
25,000Estimated Rounds used in Projection $29.00Estimated Revenue Per Round Advisory Board Projections Year 1Year 2Year 3Year 4Year.
Report Ce Centurion Golf Course Report River damage on Hole Nr 7.
Duck Creek HOA Spring Start Up. Things You Can Do Now for the Summer Season Mower Maintenance Tool Maintenance Irrigation Maintenance Color Beds and Shrubs.
GOLF RULES, ETIQUETTE, & EQUIPMENT. USGA GOLF RULES n MATCH PLAY WIN OR LOSE THE HOLEWIN OR LOSE THE HOLE n MEDAL PLAY TOTAL STROKESTOTAL STROKES.
…it’s all in the Details… …quality, efficiency and integrity. One Company for Commercial Grounds Maintenance & Landscape Management.
Golf Terms Addressing the Ball Taking a stance and grounding the club(except in a hazard)
Bill Leedom Summer Internship Timber Trail Golf Course.
LGCC Annual Meeting Committees Finance Committee –Bill Anhorn, Mike Moeller, Heather Price Greens Committee –Brian Bell, Russ Scott, Monte.
Fitting cover crops into your rotation. Step 1: identify the issue Weed management Nitrogen fixation Organic matter building Nutrient “scavenging” Erosion.
Overseeding TRF 230. Why Overseed Bermuda goes dormant Green color Traffic tolerance Economic reasons.
DISTRICT IMPROVEMENT PLAN Technology Domain Annual Progress Report Lakewood School District # 306.
Whitney Park East Annual Meeting October 18 th, 2011.
Burrowing Owl Conservation: Artificial Burrows and Golf Courses Matthew Denman Smith Courtney J. Conway Arizona Cooperative Fish and Wildlife Research.
The Game of Golf Hole in One Golf Team (Fremont HS)
Golf Mr. Schmidt.
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
Nutrient Management on Public Lands Forest Greens Golf Club Employs Urban Nutrient Management August 12, 2005 Jeff Van Fleet, Golf Course.
GOLF UNIT LIFETIME SPORTS. GOLF ETIQUITTE Maximum of 14 clubs in bag Proper Attire - soft spike golf shoes, collared shirt, shorts or slacks- no jeans,
Course Development Programme Year 2 (Commencing October 2015)
Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.
Indian Creek Golf Club January 5, Lakes/Creek Course – Recurring Cost **Eagle/Arcis estimated 30,000 rounds on the Lakes Course (April – December)
NOTE: To change the image on this slide, select the picture and delete it. Then click the Pictures icon in the placeholder to insert your own image. Season.
INDIAN CREEK GOLF CLUB Post Flood Analysis September
Looking toward the Future. Proposed BJGC Mission Statement To grow the game of golf by providing an enjoyable experience on well-maintained courses in.
Innovative Approach to Water Main Renewal
PUBLIC ASSISTANCE GRANTS
Budget Overview State Budget Overview M & O Levy Review
CCCC Annual Membership Meeting
Big French Creek Slide Timeline of Events
Baseline Performance Measurement Report
Welcome Members & Volunteers
ROADS Services Training Group
NORTH TRUNK SEWER REPLACEMENT PROJECT
Budget Overview Review of Last Years Budget
Cost of crew.
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Why Sweep a Parking Lot? Asphalt Maintenance.
Cost Estimation and Budgeting
GoodMORning Grade 2`s!!!.
TRAINING & EDUCATION RULES OF GOLF 2019 Club Workshop.
Deer Valley Annual General Meeting
Annual Meeting Tuesday, October 16, 2018.
NH 1A Maintenance – Going beyond the roadway
Forest Rim Informational Meeting Deferred Maintenance
Presentation transcript:

Indian Creek Golf Club October 13, 2015

Lakes Course Condition - Summary Tees – Very good condition, needs typical fall/winter maintenance Fairways – varies, some are in average/good condition, some below pre-flood conditions Greens - Good condition, needs typical fall/winter maintenance Bunkers – Poor condition, needs drainage work, sand/silt removal, new sand Misc. – Cart path work, significant irrigation repairs, tree trimming/removal needed, some debris clean-up Driving Range – Poor condition, below pre- flood condition.

Lakes Course Green

Lakes Course – Green and Collar

Lakes Course Bunker

Lakes Course – Cart Path

Lakes Course – Erosion Control

Lakes Course – Silted Bunker with Drainage Issue

Lakes Course - Fairway

Lakes Course – Drainage Issue

Lakes Course – Cart Path

Lakes Course – Irrigation Leaks

Driving Range

Lakes Course – Non-Recurring Cost (Pre-flood condition) *Sand (1,100 tons to cover 50,000 sqft) *No Bunker liners *Includes scheduled tree removal/trimming *Includes additional cart path repairs (will not fix all areas of damage) Bunker Costs$204, Equipment Costs$93, Drainage Repair$66, Tree Trimming$60, CH Start Up87, Cart Path40, Irrigation and Aerification25, Total$575,500.00

Lakes Course – Non Recurring Cost (Worse condition than pre-flood) Bunker Costs$204, Equipment Costs$93, Drainage Repair$66, Tree Trimming$20, CH Start Up87, Cart Path20, Irrigation and Aerification25, Total$515, *Sand (1,100 tons to cover 50,000 sqft) *No bunker liners *Does not include scheduled tree removal/trimming *Minimal cart path repairs

Lakes Course – Non-Recurring Cost (Better condition than pre-flood) *Higher grade sand (1,100 tons to cover 50,000 sqft) *Includes bunker liners (same as Creek course) *Includes scheduled tree removal/trimming *Includes additional cart path repairs (will not fix all areas of damage) Bunker Costs$330, Equipment Costs$93, Drainage Repair$66, Tree Trimming$60, CH Start Up$87, Cart Path$40, Irrigation and Aerification$25, Total$701,500.00

Lakes Course – Recurring Cost *Includes basic maintenance on Creek Course *Eagle/Arcis estimated 30,000 rounds on the Lakes Course (April – December) *Does not include $334,158 General Fund Overhead Allocation *Does not include $407,628 (2016) Debt Service *Does not include $373,661 (2017) Debt Service Eagle/Arcis Maintenance Nov-Dec 2015$160,000 Eagle/Arcis Operating 2016$1,631,000 Cart Lease$68,000 City Operating (Nov 2015 – Dec 2016)$175,000 Ongoing Capital Maintenance$50,000 Total$2,084,000 Est. Revenues$1,017,000 Nov-Dec 2015 Cost and 2016 Cost($1,067,000)

Lake Course -Timeline Routine Seasonal Maintenance in Fall/Winter Bunker Repairs – Winter Cart path replacement – Winter Delivery of Lakes Course restroom – Winter Aerify, top dress, new sod – dependent on weather (limitations based on growing season) Tree Trimming/Removal – Winter Irrigation/Drainage – Ongoing Eagle/Arcis will hire staff – Winter City to start cart lease – Winter Bid/Quote repairs Anticipated opening April 2016 *Weather Dependent

Creek Course Conditions - Summary Tees – Very good condition, needs typical fall/winter maintenance Fairways – varies, some are in average/good condition, silt on fairways, several below pre- flood conditions Greens - Good condition, needs typical fall/winter maintenance Bunkers – Poor condition, sand/silt removal, new sand Misc. – Aerification recommended for fairways, debris clean-up, Additional weed control needed

Creek Course – Tee Box

Creek Course - Fairway

Creek Course – Bunker and Fairway

Creek Course – Potential Action Plan FALL 2015 During the land use study, aerify all the Fairways in the fall (October) SPRING/SUMMER 2016 Needed repairs/maintenance: -Additional Aerifications in the Spring (2-3) -Top-Dressing of Fairways after aerification -Bunker clean out and sand replacement -Increased maintenance/fertilization (anticipated increased weed control measures) *Future consideration - flood mitigation options