Meet with groups and guide1 day9/11/2009 Identify team leader1 day9/11/2009 Decide on team norms and behaviors5.5 days9/11/20099/18/2009 Decide group.

Slides:



Advertisements
Similar presentations
Routed Systems Presented by: Bassam Najar, Design Engineer Butler International Inc.
Advertisements

Trevor Andrews Holli Monroe Emily Piccione William Wright.
Trevor Andrews Holli Monroe Emily Piccione William Wright.
Trevor Andrews Holli Monroe Emily Piccione William Wright.
Plastics Product design Aaltonaut Teppo Vienamo
P11228 Week 2 Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss.
PROJECT THERMOELECTRICS AND FAN SYSTEM FOR COOK STOVE PROJECT UPDATE – DEC. 10, 2010.
P11228 Week 4 Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss.
MSD-I Project Review Modular Motion Tracking Sensors 1.
Week 3: End of Day P Progress Edge Organized page for ease of additional document addition Added New Documents.
P08006: Physical Therapy Motion Tracking System Sponsor: National Science Foundation Customer: Nazareth Physical Therapy Clinic Josemaria Mora Electrical.
Typical phases of a project: 1.Schematic Design 2.Design Development 3.Construction Documents 4.Construction Administration.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
WM Software Process & QualityAssessment Prep - slide# 1©P. Sorenson Assessment Process documented  The Assessment Process must be documented. -
Electron Optics Lillian Tseng Andrew Carmedelle Sarah StrohKorb Kevin McClure 6/6/11.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
IS&T Project Management: Project Management 101 June, 2006.
Harvesting Waste Energy: Bicycle Power Generation RIT-MSD-I Detailed Design Review Winter/Spring P12414.
P13071 – Non-Invasive Blood Glucose Monitor Team Members Jared Bold Yongjie Cao John Louma Andrew Rosen Dan Sinkiewicz Faculty Advisor Professor George.
May15-30: Fast, Compact, High Strength Magnetic Pulse Generator.
Digital Microfluidics Control System II P15610 Complete Detailed Design.
P13621: Conductive Heat Transfer Lab Equipment MSD II: Final Project Review 10 May, 2013 RIT KGCOE.
Degree and Graduation Seminar Project Management Processes
Design of Blended Learning Activities Design of blended learning activities: Issues and perspectives An ASCILITE workshop By Allison Littlejohn Chair of.
EDGE™ Preparing a Poster for a Publication and Display Prepared by Edward Hensel (ME) Elizabeth DeBartolo (ME) Copyright © 2005 Rochester Institute of.
2nd Workshop on Wideband Speech Quality - June ETSI TC STQ STF 294 Improving the quality of eEurope wideband speech applications by developing a.
Plastics Product design Aaltonaut Teppo Vienamo
Parachute Design Unit. Design a parachute that will safely deliver its cargo to the ground according to the following constraints: * The parachute must.
Developing fast clock source with deterministic jitter Final review – Part A Yulia Okunev Supervisor -Yossi Hipsh HS-DSL Laboratory, Dept. of Electrical.
Liver Modeling using DEVS Project Presentation. Team Members: Banan Al-Aubiydy Alexander Dias Supervisor: Professor G. Wainer.
Conceptia was established in the year 2004 and over the last 11 years have been serving the engineering industry in various areas of engineering field.
CUSTOM T-SHIRTS FOR CHEERING TEAM UNIFORM Textile Technology Mini Project.
P16680: AATech Universal Oil and Bag System Bryce Mowers Jessica Reed Maria King Nicole Anklam Philip Couturier Samantha Orlando.
P12022: LVAD P OWER T RANSMISSION T EST R IG Erin McNally Pedro Baez Paul Parthemore Kris Stichter.
P Magnetically Levitated Propeller Group Members: Eli, Zach, Mike, Joe, & Bernie.
OAI and peer review Workshop (CERN 22/03/2001) Thomas Baron – Tibor Simko CERN Document Server: Validation & OAI WORKSHOP on the Open Archives initiative.
Subsystem Design Review P16203 Andre Pelletreau, Kerry Oliviera, Jeremy Willman, Vincent Stowbunenko, Kai Maslanka.
P /24/14 Meeting. What we did well ●Depth and thoroughness of work ●Documentation of work ●Team Work ●Others?
Software Engineering Principles Practical Advice and Steps for Managing Your Project.
Phase One – Project Initiation and Set Up Project Name Your Area Health Service.
1 DESIGN RESPONSIBILITIES Contract Information Supplied by Design Team Responsibility of the Precaster Option I Provide complete drawings and specifications.
Overview of Socio-cognitive Engineering General requirements Theory of Use Design Concept Contextual Studies Task model Design space System specification.
Resuscitation Team Concept. Role of the Team Leader The role of the team leader is multifaceted. The team leader Oranizes the group Moniters individual.
Project Final Presentation Joe Featherall.
Detailed Design Review Group P16228: Mike, Zach, Joe, Elijah & Bernie.
Unit 72 – Game Design Linked in with Unit 02: Communications Skills Introduction.
Angles of Elevation Project. First Steps Assign team responsibilities: – Leader – Data Recorder – Measurement 1 – Measurement 2 – Measurement 3 – Story-Board.
Unit 4 Assignment 3 Practical techniques. Task 1 (P4) You will need to complete the following experiments. You will need to hand in a portfolio of your.
Complete Design & Gate Review. Complete Design Detailed Design Review (DDR) 1.“High and medium technical risk” areas –Design Review (Prelim-DDR): standard.
What has been accomplished at the end of MSD 1 & 2?
P10041 Managerial Review. MSD I Primary Objectives Determine and Refine Customer Needs Map Customer Needs To Engineering Specs Develop Project Plan Thoroughly.
MSD I – P10543 Week 2 Project Update Dale Turley – Project Manager Jason Herrling – Lead Engineer Sam Seibert – System Engineer Dave Wagner – System Engineer.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
1 Functional Area Owners Preparation for Primary Working Session.
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
Practical Assessment Project Template – DMADV
Executive Alignment Workshop
Promotion in Extension Presented by: Ken Martin, Ph. D
PM 584 Competitive Success/snaptutorial.com
PM 584 Education for Service/snaptutorial.com
University of Idaho – Interdisciplinary Engineering Capstone Design
Dr Achim Engelhardt Lotus M&E Group Frankfurt – Geneva
Dr Achim Engelhardt Lotus M&E Group Frankfurt – Geneva
Signal Conditioning.
CIC BIM Competition Presentation Template & Content Guide
Team P16228: Magnetically Levitated Propeller
<Your Team # > Your Team Name Here
Preliminary Detailed Design Review: P18001
University of Idaho – Interdisciplinary Engineering Capstone Design
Presentation transcript:

Meet with groups and guide1 day9/11/2009 Identify team leader1 day9/11/2009 Decide on team norms and behaviors5.5 days9/11/20099/18/2009 Decide group structure and roles3 days9/14/20099/16/2009 Identify project objectives6 days9/18/20099/25/2009 Meet with customer1 day9/15/2009 Identify Customer Needs9 days9/16/20099/28/2009 Identify known and unknowns11 days9/11/20099/25/2009 Meet with other group to discuss ideas1 day9/18/2009 Understand full scope of joint projects5.5 days9/18/20099/25/2009 Asses risks and mitigation5.5 days9/18/20099/25/2009 Develop high level schematic5.5 days9/18/20099/25/2009 Peer review for group members1 day9/25/2009 System design schematic5.5 days9/25/200910/2/2009 Update project plan5.5 days9/25/200910/2/2009 Upload documents to EDGE6 days9/25/200910/2/2009 Research signal transmission technology15 days9/11/200910/1/2009 Choose signal transmission technology1 day10/2/2009 Design review preparation5 days10/2/200910/8/2009 Design review0 days10/9/2009 Meet with customer to reevaluate review if needed1 day10/9/2009 Meet with other teams to see level of collaboration needed1 day10/9/2009 Reevaluate system design review6 days10/9/200910/16/2009 Work on detailed design11 days10/9/200910/23/2009 Peer review1 day10/30/2009 Prepare for detailed level design11 days10/23/200911/6/2009 Detailed Level Design Review0 days11/6/2009 Prepare project management review7 days11/6/200911/16/2009 Project management review0 days11/16/2009 Move on to MSDII1 day11/16/2009

Technology Choice11 days9/11/20099/25/2009 Research possible transmission designs11 days9/11/20099/25/2009 Research data transfer6 days9/18/20099/25/2009 Transmission Design25 days9/28/ /30/200 9 Research available parts6 days9/28/200910/5/2009 Sampling Rate6 days10/9/ /16/200 9 Wire length and gage6 days10/9/ /16/200 9 Final Schematic6 days 10/23/ /30/200 9 Transmit/ receive design out of body24.5 days9/28/ /30/200 9 Research available parts6 days9/28/200910/5/2009 Accuracy of signal1 day9/28/2009 Counter Design5.5 days10/9/ /16/200 9 Voltage Division5.5 days 10/16/ /23/200 9 Validation through simulation5.5 days 10/16/ /23/200 9 Final Schematic5 days 10/23/ /30/200 9 Transmit/ receive design into body25 days9/28/ /30/200 9 Research available parts6 days9/28/200910/5/2009 Accuracy of signal1 day9/28/2009 Counter Design5.5 days10/9/ /16/200 9 Voltage Division5.5 days 10/16/ /23/200 9 Validation through simulation5.5 days 10/16/ /23/200 9 Final Schematic5.5 days 10/23/ /30/200 9

Parts36.5 days9/18/200911/9/2009 Research required parts5.5 days11/2/200911/9/2009 Create a BOM5.5 days11/2/200911/9/2009 Background Research Enclosure13 days9/18/200910/6/2009 Research existing implantable enclosures and materials13 days9/18/200910/6/2009 Enclosure Design Development23 days9/30/200910/30/2009 Generate concepts4 days9/30/200910/5/2009 Research viability of concepts3 days10/1/200910/5/2009 Choose concept5 days10/6/200910/12/2009 Select materials5 days10/6/200910/12/2009 Design seal5 days10/13/200910/19/2009 Determine dimensions9.5 days10/13/200910/26/2009 Design shock limiting restraints for electronics9.5 days10/13/200910/26/2009 Draw CAD models of both enclosures14 days10/13/200910/30/2009