Project Overview BCTC, Newtown Pike Campus Classroom Building May 13, 2010.

Slides:



Advertisements
Similar presentations
INTRODUCTION. ARCHITECTURAL TECHNOLOGY COURSES INVOLVED ACH 150 Construction Documents II 2 nd Semester Drafting/Design Studio Normal project – advanced.
Advertisements

PA Architects. PA Architects Presents SUNSET Elementary School Welcome to SUNSET Elementary School RENOVATIONS & CLASSROOM ADDITION SCHEMATIC DESIGN.
Edna Maguire School Modernization - Phase 1 Summer 2012.
Space Reallocation Update October, Summary “Almost” on time “Almost” on time Definitely under budget Definitely under budget Thanks to all for their.
First Floor Plan Description – First Floor: Library - Two story plus mezzanine Main library on the second floor Office/support spaces on the first fl.
Fall 2010 Convocation. Budget Transparency Leeward Community College Operating Budget.
MENDOCINO COLLEGE MASTER PLAN Mendocino College Faculty and Staff Presentation December 10, 2008.
Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
Institutional Services Human Resources Facilities Maintenance Custodian Services Security Construction Wilmington Campus North Campus.
Tuesday, October 2, 2012 MSS Room #1.  The Leadership Team has not had a formal discussion about HSD facilities.  Individual discussions have taken.
Jeffrey R. Holland Centennial Commons Utah State Legislature Capital Facilities and Government Operations Appropriations Sub Committee February 1, 2010.
1 UAS Campus Masterplan December 2012 Draft. 2 PRIOR WORK - INPUTS –UAS Masterplan 2009 – Accreditation Review 2010 – UAS Strategic & Assessment.
Finance and Administration Advisory Group June 30, 2010.
Recycle North Building Renovation and Design Senior Capstone Design Project Civil and Environmental Engineering Scott Hamshaw Presenting.
ASU Downtown Phoenix Campus City Council February 6, 2007.
BUSINESS SERVICES PLANNING PRIORITIES FOR
MICHIGAN STATE UNIVERSITY OWEN HALL REFURBISHMENT RE-ENERGIZING OWEN HALL.
A Long Term Solution Oak Ridge Addition. NPD117’ s Core Values Visionary Leadership Learning-Center Education Organizational and Personal Learning Managing.
Archdiocese of Boston Brockton Regional Proposal Presentation to Parents, Teachers & Staff January 28, 2007.
Guiding Principles: –Neo Georgian Aesthetic – Civic proportions –Beautiful – “Wow factor” – distinguished –Campus Great Lawn with outdoor teaching opportunity.
Feasibility Study Update – April 23 th, Agenda and Goals 1.Review Design Values 2.Review Program Elements 3.Review Design Strategies 4.Review Next.
Finding Academic Success After Probation International Conference on College Teaching & Learning March 27, 2014.
Transportation Center Rolling Forward Into Phase 2 October, 2008.
A Small Step For Our Library But A Giant Leap For Our Students… How A Library And A Title V Grant Worked To Create A Student Centered Space Theresa C.
Mary Lin Elementary School 586 Candler Park Drive Phasing Plan March 25, 2010.
ADDITION & REMODEL Eugene Field Elementary School.
Facilities Maintenance Status Report John Ozurovich, Director Facilities – Saddleback College John Edwards, Director Facilities – Irvine Valley College.
Paradise Valley Community College CLC Update Jacalyn A Askin, Vice President of Administrative Services May 8, 2009.
Project Title: CONSTRUCTION OF SCIENCE & TECHNOLOGY BLDG. (Ph. 1) Approved Budget for the Contract (ABC): Php 26,102, (Ph. 1) Source of Funds:Fund.
Schematic design presentation School of Business South Hall Renovation.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
1 SCS Building Committee. 2 The SCS Building Committee Members: Guy Blelloch Randy Bryant Sharon Burks Peter Lee Jim Skees Manuela Veloso.
Library to Learning Center Matti Raatikainen Aalto University Library OpeVeivit
Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE  ENGAGE  EMPOWER 1.
City of Rehoboth Beach Summary of Master Plan Consultations, Recommendations and Progress to date By Stan Mills for July 7 Board of Commissioner's Meeting.
Q Building Remodel Update September 10, What We Started With…
Welcome to Our Virtual Tour. Student Lounge Second Floor.
University of Washington Tacoma Budget Presentation May, 2014.
Senior Survey Data: Overview. First administration fall 05  135 responses; grad class 608;  22% response rate Second administration spring 06  264.
Leeward Community College Fall Semester 2011 Convocation.
Spencer High School – School Network The Muscogee County School District utilizes a wide area network (WAN) with all school connecting to a data center.
SMHa/CGD/TT c r o s s h i g h s c h o o l b e r k e l e y c o u n t y s c h o o l s addition + renovations phase 2.
Missoula County Space Needs Plan Planning Logistics Phasing Plan Schematic Designs Questions.
USF System Campus Master Plan Updates October 20, 2015 St. Petersburg.
Master Plan SODERSTROM ARCHITECTS Site Aerial Grade School High School Middle School Athletics Dining.
FACILITY IMPROVEMENT PROGRAM SUMMER 2004 NEW CONSTRUCTION –Molecular and Computational Biology Building –Cognitive Imaging Center REMODELED LABORATORIES.
UAA Fall 2002 Leadership Retreat “ Focusing on Student Success ” Noel-Levitz Student Satisfaction Survey Fall 2001 Results Anchorage Campus.
February 2, 2012 City of Lee’s Summit Cultural Facilities Master Plan 1.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
Willard and DiLoreto Hall Renovation and Addition
STUDENT RESOURCES By: Joe & Stephanie. EMPLOYMENT CENTER  Students can take resume classes  They have a list of jobs that students can apply on and.
Strategic Planning and High Performance Design to Reduce Energy and Environmental Impacts at Brown University EPA Brownfields 2006 Kurt Teichert Resource.
SAN FRANCISCO INTERNATIONAL AIRPORT CONSOLIDATED ADMINISTRATION CAMPUS SFAC Civic Design Review – Informational Overview February 8, 2016.
2006 Facilities Master Plan Update Cañada College
Student Experience Survey Spring 2009 Report
Forsyth County 2016 Bond Referendum
Population Health Facility
Columbus State Community College
ADDITION AND MODERNIZATION
Facilities Update November 17, 2017
21st Century School Buildings Plan
MIRACOSTA COMMUNITY COLLEGE DISTRICT
2013 RTS Campus Improvement Project
1 Semester Project Design A Multi Story Office Building
ULM Library Virtual Tour.
CAVE SPRING HIGH SCHOOL SITE PLAN JOB NO NOVEMBER 27, 2017
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
North Augusta High School – Phase 2A and 2B
The New Leavelle McCampbell Middle School
Presentation transcript:

Project Overview BCTC, Newtown Pike Campus Classroom Building May 13, 2010

Who? DECA KCTCS College Administrators College Faculty Design Team Construction Manager Commissioning Agent

What? Programming Departmental Meetings College Leadership Meetings Existing Site & Building Review Schematic Design –Site –Building –Cost Analysis

Project Goals Provide efficient and cost conscientious program and design that utilizes the available construction budget to maximize the usable area within the building Provide flexible programs and spaces that can be adapted to a variety of different uses in the future as the campus grows and develops Provide programs and spaces that attract the largest number of students and provides a dense population utilizing the building for the largest part of the day Provide programs that will support and propagate a diverse and balanced group of students; ethnically, culturally and by gender.

Project Goals, Cont’d Move intact programs and group synergistically within buildings and on campus Create and maximize the potential of business partnerships with the downtown community Provide programs that portray the college in a positive and forward looking manner. Encourage the community use of the building and campus by campus development, building placement and providing spaces for such use Create a safe and secure campus environment that is accessible and connected to the neighborhood

Program Academic Programs –Business –CSIS –General Education –Film Support Spaces –Faculty Offices –Administrative Offices –Learning Commons –IT Support –Student / Business Services –Maintenance & Operations

Program, Cont’d Business4,600 NSF –Contains 4 Computer Labs, 7 Lecture Classrooms, 1 Business & Industry Training Room Computer Science & Information Systems (CSIS)11,800 NSF –Contains 3 IMD Lab, 3 CIT Labs, and 3 General Computer Classrooms General Education17,500 NSF –Contains 16 Standard Classrooms, 3 Computer Classrooms, and a Science Lab Film3,700 NSF –Contains a Production Studio and Editing Room

Program, Cont’d Administration & Faculty Offices11,880 NSF –Contains 56 Faculty Offices, Support Spaces, Adjunct Office Area and Administrative Offices Learning Commons4,277 NSF –Contains Service Desk, Periodicals, Computer Stations, Study Carrels, Group Study Areas, Lounge Area, Tutoring Center, Copy Room and Workroom IT Support1,150 NSF –Contains Secure Server Room, Staging/Testing Room and Offices

Program, Cont’d Student/Business Services2,393 NSF –Contains Admissions, Records, Financial Aid, Advising, Veterans Resource Center, Compass Testing Room, and Career Center Miscellaneous2,330 NSF –Contains Lounge Area, Conference Room, Kitchenette and Study Areas Maintenance & Operations 990 NSF –Contains Receiving, Storage, Housekeeping, and Recycling

Building Summary 4 Stories 60,000 NSF 90,000 GSF LEED Silver

Schedule Programming:11.09 – 3.10 (3 mo.) Phase A (Schematic Design):3.10 – 5.10 (3 mo.) Phase B (Design Development):6.10 – 8.10 (3 mo.) Phase C (Construction Documents):9.10 – 12.10(4 mo.) Bidding / Negotiation:1.11 – 2.11(2 mo.) Early Sitework/Building Demolition12.10 – 2.11 (3 mo.) Building Construction:3.11 – 9.12(18 mo.) Demo/Renovation of Existing Buildings:6.12 – (6 mo.) New Building Owner Move – In:9.12 – 11.12(2 mo.) Classes Begin:1.13

Aerial

Existing

Phase 1

Final Masterplan

Site Plan, Phase 1 Minor renovation of Administration, Megowan and Warehouse buildings New classroom building New entrance and vehicular arrival area off Newtown New minimal parking at the new building. Resurfaced existing parking lots and drives in vicinity of new and renovated buildings. Restored grounds when building demolition complete Landscaped areas in vicinity of new building New Walks on campus

Site Plan, Phase 1

Project Overview BCTC, Newtown Pike Campus Classroom Building May 13, 2010

East Elevation

Entry Perspective

Lower Level, Option A

1 st Floor, Option A

2 nd Floor, Option A

3 rd Floor, Option A

Lower Level, Option B

1 st Floor, Option B

2 nd Floor, Option B

3 rd Floor, Option B

4 th Floor, Option B