Welcome Mats Lindroos Head of the ESS Accelerator Division EPG 5/12/2011.

Slides:



Advertisements
Similar presentations
Nine months at the European Spallation Source, Lund, Sweden
Advertisements

ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
The European Spallation Source Dave McGinnis Chief Engineer – ESS\Accelerator Division IVEC 2013.
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
ESS linac Mats Lindroos, Cristina Oyon and Steve Peggs.
LLRF Requirement and Parameters at ESS Rihua Zeng, Anders J Johansson LLRF workshop, Hamburg,
ESS Accelerator Design Upgrade Project Suzanne Gysin Prject Support Officer ESS Accelerator Division , SLHIPP-1
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Page The High power proton accelerator for the European Spallation Source (ESS) S. Gammino Milano, 9 Marzo
H. Danared | Sw/Fr Coordination Committee | Page 1 Swedish/French Coordination Committee Håkan Danared Saclay, 13 January 2015.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
European Spallation Source A World-Leading Centre for Materials Research and Life Science with Neutrons HEPTech Workshop 7 May 2013 James H. Yeck CEO ESS.
The ESS ADU project Mats Lindroos Head of the ESS Accelerator Division Lund,
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
Response to ESS Accelerator Technical Advisory Committee April 2014 Recommendations 5 November 2014 Dave McGinnis.
Dave McGinnis Chief Engineer – Accelerator Division
Managing Parameters Karin Rathsman Parameter Management Enforce groups as well as individuals to work towards the same solution Provide tools.
Anders Sunesson RF Group ESS Accelerator Division
The European Spallation Source Control System
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Accelerator/program Mats Lindroos Head of accelerator April 21, 2015.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
H. Danared | Cryomodule Workshop | Page 1 The In-Kind Process at ESS Håkan Danared Lund, 15 October 2014.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
ESS Accelerator| Construction Phase| | MC | 1 ESS Accelerator management & governance for Product Integration - Construction phase 25 January 2013.
H. Danared | Collaboration Board, March 2014 | Page 1 Status of In-Kind Contributions to Accelerator Håkan Danared Kastrup, 14 April 2014.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Status of the French-Swedish Cooperation Agreement 10 th Oct, 2012 Christine Darve.
AD retreat Accelerator 2012 December Mats Lindroos, David McGinnis, Suzanne Gysin, Jörgen Andersson and Steve Peggs.
WP High Beta Cavities Delivery
Cryogenics at the European Spallation Source ESS
WP5 Elliptical cavities
ESS cavity procurement via in-kind contributions
Uppsala Commitment to ESS and FREIA Planning
Hosting Orsay Walid KAABI
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
ESS RF Development at Uppsala University
Superbeams with SPL at CERN
Managing Parameters Karin Rathsman
RF systems introduction
Ciprian Plostinar Workshop on Testing and Commissioning
Daresbury ESS In-Kind Contributions
CLIC Feasibility Demonstration at CTF3
European Spallation Source ERIC
RF introduction Anders Sunesson RF group leader
Charge and Agenda of the 18th TAC meeting
Accelerator Installation Schedule
SNS-PPU upgrades the existing accelerator structure
ACCSYS Collaboration Board Triestre, 3rd october 2017
Roger Ruber for the FREIA team 11 June 2013, Uppsala
Presentation transcript:

Welcome Mats Lindroos Head of the ESS Accelerator Division EPG 5/12/2011

ESS accelerator high-level technical objectives: 5 MW long pulse source ms pulses -14 Hz -Protons (H+) -Low losses -High reliability, >95% -Cryostats for minimum Energy consumption -Flexible design for a future power upgrade ESS accelerator design High level objectives

LINAC layout 3 Length (m)Input Energy (MeV) Frequency (MHz) Geometric β # of Sections Temp (K) RFQ4.775 × ≈ 300 DTL ≈ 300 Spoke (2c)≈ 2 Low Beta (4c)≈ 2 High Beta (8c)≈ 2 HEBT H. Danared, M. Eshraqi, A. Ponton, ESS

Data Management ESS AB Board CEO C. Carlile CEO C. Carlile Accelerator Target Conventional Facilities Instruments Administration Director Administration Director Machine Director Science Director Science Director Steering Comm (STC ) Adm Financial Comm Programme Director Programmme Office Science Adv. Comm Technology Adv. Comm Preconstruction Construction Operation Phase Collaboration Partners Neutron Science ESS Programme Organisation

Accelerator Design Update Work Package (work areas) 1. Management Coordination – ESS (Mats Lindroos) 2. Accelerator Science – ESS (Steve Peggs) 3. Infrastructure Services – Tekniker, Bilbao (Josu Eguia) 4. SCRF Spoke cavities – IPN, Orsay (Sebastien Bousson) 5. SCRF Elliptical cavities – CEA, Saclay (Guillaume Devanz) 6. Front End and NC linac – INFN, Catania (Santo Gammino) 7. Beam transport, NC magnets and Power Supplies – Århus University (Søren Pape-Møller) 8. RF Systems – Uppsala university (Roger Ruber) Josu Eguia Guillaume Devanz Sebastien Bousson Søren Pape Møller Roger Ruber Romuald Duperrier (30 years ago) Steve Peggs Cristina Oyon Mats Lindroos Santo Gammino

Some of the committees… EMT: ESS management team which consists of the ESS CEO, the thre directors and the head of administration EPG: ESS Project management group which consists of EMT, AD head, TD head and ID head CCB-M and CCB-F: Change control and coordination of machine and facilities

ESS Program Phases, Gates and Milestones Program level Accelerator Target Instruments Conventional Facilities Program Initiation Program Set-up Delivery of Contsruction phase PG3PG3 PG 2 PG 1 PG 4 Full beam power on target Design Update Prepare to Build Construction Technical Design Report Design Update Prepare to Build Construction Concepual Design Installation 1-22 Installation Design Update Site preparation Construction # 7 List Ground Break Pre-construction phase Operations Installation Design and Manufacturing 22 instruments Construction First Building First Neutrons to Instruments losure Pre Construction Report ESS Master Programme Schedule

Progress in 2011 Recruitment of staff in Lund, we are now 25! –Experts present in Lund for shorter and longer periods to support AD and ADU project Kick-off of ADU project –Regular TB meetings for change control and coordination –Work has started in all WPs –First revision of Parameter lists, available at AD homepage in PDF form –Collaboration board had its first meeting Conceptual Design Report in V1 (going to V2) Modulator ordered for CERN test stand Project support in Lund at AD for ADU and P2B –Reporting fully operational and first project review passed –Alfresco, please use it! –Suzanne Gysin, what a star! The project office in Lund –CCB and EPG meetings for chnage and configuration control, project reviews and coordination –More from Johan Brisfors

Some on-going work… Strategy for Elliptical cavitiy cryomdoule prototyping –Several visit to potential partners and one workshop in Lund –To be presented to ESS senior management in the end of February Strategy for modulator prototypes –Discussions between Uppsala University, Lunds university and ESS on how to optmize existing reources and assure a coherent plan and division of responsibilities –To be presented to senior management in February for decision New baseline to be “downloaded” in January and April 2012 –Issues: Hybrid or not, MEBT design, DTL length, transition energies, RFQ length,… –Beam physics is the integrating cavity for any accelerator project CDR to become a living document which will progress to TDR under change control –Steve is the chief Editor and CCB and EPG manages change control Internal reviews for all ADU activities and future P2B and construction activities –Suzanne will present next steps at TB meeting Planning, re-planning and launching of ADU and P2B Wus and WPs –Launched as we are ready to go: CM prototyping, Uppsala test stand, Infrastructure and services Planning for construction project under PMO –WBS to level 3, schedule and costing to enable us to enter into construction in 2013

10 First thoughts - CM production line (XFEL) SDMS, ZANON, RI, … Other Manufacturer

Upgrade options Increase the repetition rate –Requires new RF sources –Not favored for operation with operation at a single target station as it would require moving the instruments Increase the beam current –Requires additional RF sources and/or additional cryomdoules and that linac and shielding is design for higher currents (with some additional cost) –Favored from instrument study (power upgrade with preserved time structure improves almost all instrument performance almost linearly) Increase the pulse length –Will require new RF sources –Not all instruments would benefit Add a second target station –Could be combined with increased repetition rate Short pulse operation with H- and ring –Can be combined with H+ operation but would require new RF sources and a new front-end Increase beam energy –Only moderate beam energy increase can be handled by the target and moderators EPG adopted guidelines for upgrade studies: –Beam current limitation at mA with a single front-end –Beam energy limitation at 3.5 GeV set by shielding and target

Upgrades The mandate is to build a 5 MW accelerator! The presently favored upgrade scenario is a power upgrade to higher power with maintained time structure –Present understanding at AD is that this best is achieved with a higher beam current or/and a moderate beam energy increase We will study how this can be prepared within the present 5 MW baseline –The additional cost should be understood and made apparent in the costing of the 5 MW baseline –First technical studies and financial estimates for the upgrade itself should be done as part of the ADU project

Headlines We are designing the ESS accelerator –Good progress in all areas –Many thanks for your contribution We should plan for entering construction in 2013 –Will require that we deliver in time on all deliverables and that we that we launch key P2B activities in 2012 –Will require that we deliver on construction project planning to PMO –Will require that we prepare through internal reviews with external experts for a comprehensive technical review of the ESS accelerator construction project None of this would be possible without you and your collaborators at our partner institutes and labs. 13

Greetings from Bejing

page Thank you for your attention!