Fermilab Technical Division July 10, 20061 The Technical Division Overview Victor Yarba July 10, 2006.

Slides:



Advertisements
Similar presentations
1.Quality-“a characteristic or attribute of something.” As an attribute of an item, quality refers to measurable characteristics— things we are able to.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Software Quality Assurance Plan
More CMM Part Two : Details.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session # 12.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Industrial Engineering Program King Saud University
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Overview Lesson 10,11 - Software Quality Assurance
INDUSTRIAL & SYSTEMS ENGINEERING
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Systems Engineering Management
Introduction to Systems Analysis and Design
Software Verification and Validation (V&V) By Roger U. Fujii Presented by Donovan Faustino.
Manufacturing Engineering Department Lecture 1 - Introduction
An SRF Single Cavity Horizontal Test Facility Tom Peterson, Fermilab May 10, 2005.
The Maintenance and Engineering Organization
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Goal: Understand the stages in design process and the role of computer aided design. Objectives: After this chapter, you should understand the following.
From Research Prototype to Production
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
ASEP Ergonomic support development Fall 2002 The Need... “Scientific evidence shows that musculoskeletal disorders of the lower back and upper extremities.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
Ken Youssefi Mechanical Engineering department 1 Introduction to Concurrent Engineering Computer Aided Design (CAD) Computer Aided Manufacturing (CAM)
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
SOFTWARE ENGINEERING. Objectives Have a basic understanding of the origins of Software development, in particular the problems faced in the Software Crisis.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
NCSX Field Period Assembly (FPA) Operations, Cost and schedule, staffing, and metrology utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
MICE Coupling Coil Test Proposal Ruben Carcagno Fermilab July 9, MICE CC Test Proposal7/11/2011.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Production CM QA/QC Plans and Systems Production Cryomodule Final Design Review Jamie Blowers 12-May-2015.
O. Kester, NuSTAR annual meeting, 27/02/2013
LCLS-II Prototype Cryomodule FDR J. Blowers, C.M. Ginsburg, T. Peterson, R. Stanek, J. Theilacker (FNAL) 21 – 22 January 2015 Homework Responses.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
MMT Retreat Technical Services across ESS Peter Rådahl
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
Advanced Software Engineering Dr. Cheng
SLHC –PP WP6 LHC IR Upgrade - Phase I.
The ILC Control Work Packages
Clinical Engineering Lecture (3).
Introduction to CAD/CAM
Experience with an IT Asset Management System
Advanced Research Electron Accelerator Laboratory
TOPIC: Computer-Aided Design
DOE Review of the LCLS Project October 2006
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Fermilab Technical Division July 10, The Technical Division Overview Victor Yarba July 10, 2006

Fermilab Technical Division July 10, Technical Division Mission The research, development, design, fabrication or procurement, and testing of accelerator and detector components Support the Accelerator Complex Conduct Accelerator R&D –ILC, PD, LHC, LARP Support Projects –CMS Muons, LHC Accelerator Project, Pierre Auger Provide Lab-wide Services –Incoming inspection, material control, specialized machine shop TD is ~235 people accustomed to: Working on technical HEP R&D devices Responding to customer requirements Preparing designs to be ‘production ready’, including integration w/ industry Delivering on accelerator projects for Fermilab and other HEP labs

Fermilab Technical Division July 10, TD Organization TD is a matrix organization Departments are grouped by specific functional skills Projects and Programs focus efforts to specific goals, using personnel from the departments

Fermilab Technical Division July 10, The Magnet Systems Dept. Mission  Provide support for the Fermilab Accelerator complex  repair or refurbish existing accelerator components  design, fabrication and test oversight of new devices for improvements to the accelerator complex.  Develop, evaluate and improve technologies for future accelerators  development of new technologies in the area of superconducting and other structural materials and components;  magnet design, fabrication, test and analysis;  and magnetic measurement instrumentation.  Provide Other Services to the Division and Lab Projects  quality assurance/production control and document management services  tooling design and fabrication  project management ( LARP task leaders, ILC magnets, numerous completed projects for the Tevatron and elsewhere)

Fermilab Technical Division July 10, Accelerator Support Project Workflow/Interactions Request received from customer (AD/MSD) Requirements defined and documented –Design specifications (MSD/AD) –Procurement specifications (MSD/MCD) –Fabrication specifications (MSD) –Measurement requirements (MSD/T&I/AD) Requirements reviewed (AD/MSD/MCD/T&I) Priorities set (AD/MSD) Devices designed (MSD/DDCIS/MCD/AD/T&I) Parts/assemblies procured/fabricated (MCD/MSD) Parts/assemblies inspected (MCD) Devices fabricated (MSD) Devices measured (T&I) Measurement data analyzed (MSD/T&I/AD) Devices delivered to customer Close out - records completed and lessons learned published Maintenance The design process is very iterative. Improvements occur throughout the entire life-cycle.

Fermilab Technical Division July 10, MSD Accelerator Support Projects WQB quadrupoles New OrBump system Repair TEL 1 during shutdown Reshimming Tevatron dipoles Booster Corrector Package

Fermilab Technical Division July 10, LARP Model Magnet R&D Fermilab provides substantial contributions to developing LARP technology quads (TQ). Two technology quadrupole designs: TQS: mechanical structure based on thick Al shrinking cylinder (LBNL) TQC: mechanical structure based on stainless steel collar/yoke/skin support (Fermilab) Fermilab provides: MJR strand for TQS01 and TQC01 Resources for TQ tooling design and procurement in FY04-05 from base program Coil design and technology, and winds coils for TQS01 and TQC01 Model testing at 1.9 K Status: TQS01 built and tested TQC01 near completion, test to follow

Fermilab Technical Division July 10, Superconducting RF Dept. Mission Contribute to the advancement of conventional and superconducting Radio Frequency technology, from conceptualization through commissioning of components and assemblies, to be used in all aspects of beam acceleration, handling and detection. Work includes basic beam dynamic simulation, establishment of design requirements, engineering specifications, design and engineering to develop ‘build-to-print’ packages for procurement, development of prototypes, definition of work process control procedures, development of inspection criteria and fabrication procedures, and providing fabrication and production oversight. The department’s efforts will include follow-up for completed devices such as support of testing and analysis of test data in order to measure, characterize and optimize the performance of RF devices, and support of the installation and commissioning of such devices. It will also include basic material research and development, including the establishment of reliable and repeatable chemical processing recipes and procedures to achieve desired RF cavity accelerating gradients.

Fermilab Technical Division July 10, ILC Type IV Cryomodule SRF Cavity

Fermilab Technical Division July 10, Ion source R&D Initial idea:multicusp, rf-driven, cesium enhanced source of H - (SNS,DESY). –Output energy 50 keV –Output peak current 12.7 (38) mA –Pulse length 3.0 (1.0) ms –Pulse rate 2.5(10) Hz Recent Developments: Plasmatron D. Moehs C. Schmidt H. Piekarz DualPlasmatron Source at MS6.

Fermilab Technical Division July 10, Test & Instrumentation Dept. Mission The Test and Instrumentation (T&I) Department of the Technical Division (TD) is a service and development organization. The department performs measurements and test of both R&D and production accelerator components, and develops technologically advanced instrumentation, control solutions, and cryo-mechanical systems for accelerator applications. The major customers of the T&I department are other TD Departments and TD Projects. The highest priority of the department is to provide efficient and effective support of testing programs to our customers through the products we deliver. These products are test data, instrumentation components, and systems for use within and outside the department. The two major accelerator technologies that the department supports are magnets (conventional and superconducting) and Superconducting Radio Frequency (SRF) cavities.

Fermilab Technical Division July 10, IB1 SRF Test Area Layout Existing Cryo Piping Horizontal Test Area (FY07) (Dressed Cavities) Vertical Test Area (FY06) (Bare Cavities)

Fermilab Technical Division July 10, Material Control Dept. Mission The Material Control Department's purpose is to support the ongoing activities and projects with which the Technical Division is involved. We typically get involved early in a project estimating costs and providing expertise on manufacturing and quality engineering issues. As a project evolves, we initiate procurements for the parts, tooling, and supplies necessary to support the fabrication efforts. We provide source and incoming inspection services throughout the project. After items pass inspection, we provide storage and inventory control functions for devices such as accelerating structures, magnets, and their components. Additionally, we offer metrology and fabrication procurement services to Fermilab and to other National Laboratories. The Material Control Department is committed to ensuring that deliverable items meet our customer's specifications/requirements and that a safe work place is provided for our employees while protecting the environment.

Fermilab Technical Division July 10, Quality Control The QC Group provides a wide variety of services with emphasis on precision metrology. Inspection –At the Source –Incoming Inspection in IB4 Calibration –Periodic Calibration of Measuring & Test Equipment –Database of Calibrated Instruments

Fermilab Technical Division July 10, Quality Control Capabilities Mechanical Inspection –Coordinate Measuring Machines (4 Mechanical Cordaxes, 2 Optical OGP) –Laser Tracker Magnetics Testing –Hysteresigraph –Ferrite/Permeability Indicator(s) Leak Testing –Vacuum –Hydrostatic

Fermilab Technical Division July 10, Quality Control Capabilities (cont’d) Miscellaneous Capabilities –Hardness Testing –Surface Finish Measurement –Ultrasonic Testing (flaw and thickness measurement) –Coating Thickness Measurement

Fermilab Technical Division July 10, Design Drafting Mission Responsible for project design and drafting activities both within the Division and for outside 'customers'. Interact with project engineers, physicists and managers in the development of component, assembly, and system designs. Document control of all drawings, files, specifications, parts lists, releases, and change orders. Home to the Lab CAD Manager (LCM). The LCM has responsibility for managing the CAD/CAM/CAE/PDM software for all of the divisions and sections of Fermilab.

Fermilab Technical Division July 10, Computing & Information Systems Mission Responsible for the computers, networks and administrative/user databases in the division. Installation/maintenance and specification of desktop computing software and hardware, server systems Support services such as printers/plotters and data backups and a division wide helpdesk Long term planning, implementation and upkeep of all TD information systems Responsible for TD computer security

Fermilab Technical Division July 10, DD/CIS – Technical Support DD/CIS support includes; CAD/CAM Software/Customization Desktop applications Web based server/client software Printer/plotter support includes setup, installation and network availability for a variety of printers and plotters Hardware/software computer support of the High Rise and Village Machine Shops Maintaining a property database that contains information about all TD devices

Fermilab Technical Division July 10, Machine Shop Mission The mission of the Fermilab Machine Shop is to provide a range of onsite machine shop and welding capabilities coupled with quick response for: –Modification of existing components in support of accelerator and experiment operations. –Manufacturing of urgently needed details. –Machining of slightly radioactive materials (class I, II). –Development of prototypes and proof of principle concepts. –R&D associated with new machining technologies and processes.

Fermilab Technical Division July 10, How the Shops Function The Fermilab Machine Shops are comprised of a Main Shop and four Satellite Shops ranging from 1 to 4 Machinists in each shop. Main Shop –The Main Machine Shop is equipped to handle large fabrications, special welding requirements, EDM, CNC machining and programming, prototype development, long and short run jobs, and perform radioactive machining. Satellite Shops –Satellite Machine/Weld Shops are located in the major production and repair areas of the Laboratory. There are five Satellite Weld Shops. –Offer the convenience of not having to travel to the main shop. –Priority is established by the Group.

Fermilab Technical Division July 10, Support Department Mission The Technical Division Support Department includes the Facilities Management Group and the Environment, Safety and Health Group. The department is a service organization which supports the mission of the Technical Division and Fermilab in every respect.

Fermilab Technical Division July 10, Support Dept. Key Responsibilities Environment, Safety & Health ES&H Training Emergency Management Facilities Management Infrastructure Improvements & Construction Projects Operational Readiness Reviews & Clearance Recommendations

Fermilab Technical Division July 10, Quality Management in TD Our quality program is organized around DOE O 414.1C Similar to safety, quality is integrated into the work processes throughout the division Every employee is responsible for assuring the quality of their work (TD-2010 section 1.6.1) Peer review is central to the quality program Management provides tools (systems) to aid employees in assuring quality (more on this topic this afternoon)

Fermilab Technical Division July 10, Quality Management in TD In addition to the integrated function, the division maintains a specific QC function in the Material Control Department (described earlier) –Incoming inspection (calibration, CMMs, mechanical inspections, leak checking, laser tracker) The division also has a QA Manager, who is responsible for the overall quality program –He works with department and project leaders to help ensure that management systems are in place and effective in helping to assure quality

Fermilab Technical Division July 10, In Summary The Technical Division is responsible for the designs, development, manufacture, & testing of precision accelerator components requiring extremely tight tolerances Quality Assurance is an important element in our Division’s programs, and is essential if we are to meet our mission requirements A sound QA Program is in place and is central to the success of our organization