11/3/2010 CM15 Controls for LARP and LAFS - 1 Terri Lahey LARP/LAFS/CERN and SLAC.

Slides:



Advertisements
Similar presentations
Point of Sale (POS) Client & Back Office Server. Operational Concept What is our Objective? What is our Objective? What are our Goals? What are our Goals?
Advertisements

System Construction and Implementation Objectives:
Project Status E911 Provisioning System Royal Flush Software Kevin Francis, Jason Plaisted, Jessica St. Croix, Mike O’Connor, Derrick Hudson.
Slide 1 Sterling Software Peter Sharer Sterling Software.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Database Infrastructure Major Current Projects –CDF Connection Metering, codegen rewrite, hep w/ TRGSim++ – Dennis –CDF DB Client Monitor Server and MySQL.
High Level LHC Schottky Software Development Jerry Cai & The LAFS Team 28 January 2009 Presented by Elliott McCrory.
High Level LHC Schottky Software Development Jerry Cai & The LAFS Team.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
Terri Lahey EPICS Collaboration Meeting June June 2006 LCLS Network & Support Planning Terri Lahey.
CryptKeeper Project Plan 1 CryptKeeper Project Plan.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Vaia Papadimitriou The Supertable (Introducing Supertable II) Run II meeting September 2, 2004 Timofei Bolshakov and Vaia Papadimitriou.
Suzanne Gysin1 Software for the LHC Types of Software Current Prototyping Architecture Ideas Requirements Revisited WBS considerations.
NASA/ESA Interoperability Efforts CEOS Subgroup - CINTEX Alexandria, Sept 12, 2002 Ananth Rao Yonsook Enloe SGT, Inc.
COMP-14: Automating your deployments using ANT Gary S Clink Business Consultant.
Impressions from CERN Elliott McCrory February 1, 2006.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
CERN – European Organization for Nuclear Research Administrative Information Services Demonstration of 3 HTMLDB-based applications 1 IT-AIS-HRMarch 17.
Statistics Monitor of SPMSII Warrior Team Pu Su Heng Tan Kening Zhang.
Fermilab User Facility US-CMS User Facility and Regional Center at Fermilab Matthias Kasemann FNAL.
California State University, Northridge Certification Process Team B Carlos Guzman John Kramer Stacey LaMotte University of Phoenix.
Project Plan for nSite Central Michael Dunn Ryan Sessions Kyle Kerrigan.
CERN Trip Report: April 4-8, 2011 LAFS Work Elliott McCrory April 20, 2011.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer Science.
Jean Slaughter -Feb 24, 2004 Shot Data Responsible for physics analysis of shot data Oversees the development of shot data analysis tools Responsible for.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Jean Slaughter –April 5, 2004 – all experimenters’ meeting Purposes of SDA Store to store monitoring of performance Long term trends Analysis of specific.
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009.
The DIAMON Project Monitoring and Diagnostics for the CERN Controls Infrastructure Pierre Charrue, Mark Buttner, Joel Lauener, Katarina Sigerud, Maciej.
F LHC Accelerator Research Program Accelerator Systems Tanaji Sen FNAL/APC  Project management  Accelerator Physics  Instrumentation  Beam commissioning.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The Juggernaut Team Tyler Douthitt  Project Manager  Lead Website Developer Mike Harman  Lead Programmer Eric Rakers  Lead Documenter  Lead Analyst.
Accelerator Physics Department Meeting July 26, 2006 Jean slaughter1 Status Report APD Meeting July 26, 2007 Jean Slaughter.
Bina Nusantara 19 C H A P T E R SYSTEM CONSTRUCTION AND IMPLEMENTATION.
State of Georgia Release Management Training
LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC Status Report E. Harms 28 March 2006.
Instrumentation of the Controls Configuration Directory Service J. Luis González Arias BE3528 Software Developer for the Accelerator Controls Configuration.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
Introduction to ITIL and ITIS. CONFIDENTIAL Agenda ITIL Introduction  What is ITIL?  ITIL History  ITIL Phases  ITIL Certification Introduction to.
TRIUMF HLA Development High Level Applications Perform tasks of accelerator and beam control at control- room level, directly interfacing with operators.
Remote Monitoring for Hardware & Beam Commissioning E. Harms/FNAL 7 April 2005 Port Jefferson, New York bnl - fnal- lbnl - slac US LHC Accelerator Research.
5. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Describe the activities of the requirements discipline  Describe the difference.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
Suzanne Gysin 1, Andrey D. Petrov 1, Pierre Charrue 2, Wojciech Gajewski 2, Kris Kostro 2, Maciej Peryt 2 1 Fermi National Accelerator Laboratory, 2 European.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CS 389 Software Engineering MultiLib 2008 Final Presentation Adam Pitzer -Team Leader Paul Dumoulin - Quality Manager Miguel Vega - Wiki Master Steve Malko.
Committee – June 30, News from CERN Erik Gottschalk June 30, 2005.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
MANAGEMENT OF STATISTICAL PRODUCTION PROCESS METADATA IN ISIS
Erik Gottschalk for Jean Slaughter
Remote Operations Erik Gottschalk 5 October, 2005
Computing infrastructure for accelerator controls and security-related aspects BE/CO Day – 22.June.2010 The first part of this talk gives an overview of.
Update Erik Gottschalk.
Remote Operations Erik Gottschalk 7 September, 2005
LCG Operations Workshop, e-IRG Workshop
CPMGT 300 Competitive Success/snaptutorial.com
CPMGT 300 Education for Service/snaptutorial.com.
CPMGT 300 Teaching Effectively-- snaptutorial.com.
Systems Construction and Implementation
System Construction and Implementation
Systems Construction and Implementation
King Saud University College of Engineering IE – 462: “Industrial Information Systems” Fall – 2018 (1st Sem H) Introduction (Chapter 1) part.
Presentation transcript:

11/3/2010 CM15 Controls for LARP and LAFS - 1 Terri Lahey LARP/LAFS/CERN and SLAC

Overview Two Roles while at CERN LARP and LAFS Liaison CERN BE/CO infrastructure and security project, next step beyond LAFS RBAC project. 11/3/2010 CM15 Controls for LARP and LAFS - 2

LARP and LAFS Liaison Liaison and Controls/Software support for LARP and LAFS projects Physically located at CERN to assist in Transatlantic Communications – Interface with CERN teams, including Beam Instrumentation, Operations, and Controls – Communicate with LARP/LAFS teams Extension of some of Elliott McCrory’s work, after he returned to Fermilab 11/3/2010 CM15 Controls for LARP and LAFS - 3

LARP and LAFS projects: Schottky Work with CERN teams for control of instruments that are being transferred to CERN. Schottky: Assist with the debugging, releasing and commissioning of the Schottky software suite Working with teams at Fermilab (E. McCrory, R. Pasquinelli, J. Cai, A. Jansson) and CERN (R. Jones et.al., BE/CO teams for software and logging) Assist with transfer to CERN people who will be taking over this software: G. Crockford (BE/OP) control room GUI, M. Favier (BE/BI) fits and daemon, M. Misiowiec (BE/CO) controls system tools Integrating Schottky into LHC logging database for archiving Schottky data – Currently in the measurement database – next step to validate data preparing for implementation in logging database for long term availability 11/3/2010 CM15 Controls for LARP and LAFS - 4

LARP and LAFS projects: Schottky Parameters in Measurement DB 11/3/2010 CM15 Controls for LARP and LAFS - 5

LARP and LAFS projects: SuperTable Liaison to BE/OP on “Super Table” project – Mike Lamont wants an LHC version of this Fermilab Application – Summarizes physics fills: luminosities, emittances, intensities, lifetimes, Injection & Beta Star Scheme – Prototype is available at supertable.web.cern.ch/lhc-supertable/index.htmlhttps://lhc- supertable.web.cern.ch/lhc-supertable/index.html – Revise cells as we get input: eg. add “initial emittance from luminosity” – Next step is to release application to production with added JAVA dynamic interface (BE/OP) – Mario Pereira (BE/OP) and Elliott McCrory (LAFS) coding, Lahey, liaison and testing 11/3/2010 CM15 Controls for LARP and LAFS - 6

Super Table summarizes Fills 11/3/2010 CM15 Controls for LARP and LAFS - 7

LARP and LAFS projects (cont’d) Liaison to BE/OP on the existing LAFS-supplied application: Wire Scanner Application and Synchrotron Radiation Monitor Application. Fermilab Remote Operations Center: improve login procedure and connection from ROC consoles to CERN Upcoming projects for LARP instruments and LAFS applications: – Work with PS and PSB staff, and the InCA team to develop documentation for the Tomoscope and the LKTIM projects – Liaison to BE/CO for Luminosity Monitor Software General liaison to facilitate the acquisition and access to LHC accelerator data related to LARP hardware and/or accelerator physics studies. 11/3/2010 CM15 Controls for LARP and LAFS - 8

LARP and LAFS Communication Logistics Attend morning commissioning meeting and report to LAFS. This is being extended to a website for viewing by LARP members. Weekly video meeting with LAFS and phone Direct communication with CERN personnel 11/3/2010 CM15 Controls for LARP and LAFS - 9

LAFS Personnel LAFS personnel: Gerald Annala (Fermilab AD/Tevatron) Jerry Cai (Fermilab AD/EE-Support) Suzanne Gysin (Fermilab CD/FP&E/A&DS&S/CET) Terri Lahey (LARP/LAFS/CERN, on leave from SLAC) Elliott McCrory (Fermilab AD/HQ) Dave McGinnis (Fermilab AD/EE-Support) Dennis Nicklaus (Fermilab AD/Controls) Jim Patrick (Fermilab AD/Controls) Observing personnel: Erik Gottschalk (PPD/EP; Head of ROC) Eric Prebys (Fermilab APC; Head of LARP) 11/3/2010 CM15 Controls for LARP and LAFS - 10

CERN A&T Project: Control System Interdependencies and Security Risks Requested by Accelerators & Technology (A&T) sector to – document control system network security and infrastructure dependencies – improve documentation, security and reliability, and minimize possible risks to Operations Supporting LHC operation and LAFS collaboration, this is a follow-up project to the very successful LAFS Role Based Access Control (RBAC) project that is firmly established in LHC. 11/3/2010 CM15 Controls for LARP and LAFS - 11

TN Interdepencies & Risks: Work Packages 1.Phase I – Make an inventory of service/system and their dependencies – Implement a questionnaire to collect the A&T sector data – Implement a Data Base with a web interface to enter the data – Populate the database – Extract the security risks from A&T sector data 2.Phase II – Mitigate these risks with the A&T management and derive the actions needed to address them – Propose action in management – Proceed with implementation of agreed actions Pierre Charrue, group leader of BE/CO Infrastructure is project leader. 11/3/2010 CM15 Controls for LARP and LAFS - 12

TN Interdependecies & Risks Computer, System, and software owners will use this tool to – Describe what other computers and services they depend upon – answer questions identifying risk in their control system component BE/CO and BE/OP will use this tool to – Identify and minimize possible risks to Operations – Plan for improvements Deliverables – Finalize Questions – Create TN Questionnaire web-based tool and database integrated with the existing LHC distributed databases – Work with system owners in Beams, Engineering, and Technologies Departments to identify their system-specific needs and to help them enter their data – Interdependencies Summary to Steve Myers 11/3/2010 CM15 Controls for LARP and LAFS - 13

Example Questions 11/3/2010 CM15 Controls for LARP and LAFS - 14

Summary Working on projects to support LARP/LAFS and their collaboration with CERN Instrumentation, Controls, and Operations I can be reached by or 11/3/2010 CM15 Controls for LARP and LAFS - 15