TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen1 TCR Remote Monitoring.

Slides:



Advertisements
Similar presentations
ALICE DCS Workshop Day 10th September The Cooling and Ventilation Control System D. Blanc, Process Control Team and Project Leader CERN ST/CV-Design.
Advertisements

Mario Bätz CERN ST-MO-TC ENGINEERING PROCESS MONITORING FOR CONTROL ROOM OPERATION GTPM Gestion Technique dune Panne Majeure.
INFORMATION TECHNOLOGY
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Learning and Teaching Conference 2012 Skill integration for students through in-class feedback and continuous assessment. Konstantinos Dimopoulos City.
Test Long and Prosper presented by Janet Gray July 26, 2005.
Chapter 3 Project Initiation
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
Lab/Sessional -CSE-374. SYSTEM DEVELOPMENT LIFE CYCLE.
Software Engineering For Beginners. General Information Lecturer, Patricia O’Byrne, office K115A. –
Stephen S. Yau CSE , Fall Security Strategies.
Roles of IT Personnel Unit Customer Service This is a facility that helps customers with wide-ranging questions relating to a specific company,
Mitun PatelMXP07U. Organisational structure Top management; this includes the organisation’s general manager and its executives Department managers; this.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
ST Technical Committee 15th October LHC Ventilation Control System migration D. Blanc ST-CV.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
Interaction of ST & TIS in matters of safety Mandate & OrganisationMandate & Organisation InteractionsInteractions Basis for cooperationBasis for cooperation.
Foundation Degree IT Project Methodologies (for reference)
Computers & Employment By Andrew Attard and Stephen Calleja.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
National Cheng Kung University 軟體品質管理 期末報告 The SQA Unit and Other Actors in the SQA System Reporter: 羅國益 Teacher: 朱治平 Date: 2014/12/30.
Software Project Management Introduction to Project Management.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks From ROCs to NGIs The pole1 and pole 2 people.
Best Practices: Aligning Process, Culture and Tools Michael Jordan Senior Project Manager - Microsoft Consulting Services
PCR Status report AESAG, September Supported by:
LHC machine Schedule, coordination & WAT K. Foraz March 22 nd, 2011 IMWG - LHC machine1.
4th ST Workshop, Chamonix 2001U. Epting, M.C. Morodo Testa, P. Sollander Is the CERN recommended SCADA useable for the ST division?
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Using Business Scenarios for Active Loss Prevention Terry Blevins t
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
Operation & Maintenance in ST-MA presented by Rui Nunes.
6th ST workshop, Thoiry, 1-3 April ST-HM Design Section Strategy and working methods 3rd April 2003 C. Bertone ST-HM.
Systems Analysis and Design in a Changing World, Fourth Edition
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
1LHC COOP, Uwe EPTING, CERN, ST/MO LHC - Technical Infrastructure Monitoring Uwe EPTING CERN, ST/MO.
Partners in Learning Student Help Desk Program Building 21 st Century Skills.
ICASAS305A Provide Advice to Clients This unit describes the performance outcomes, skills and knowledge required to provide IT advice and support to clients,
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
CV Industrial Control SystemsJCOV Meeting October 23, 2003 ST/CV ACTIVITY Industrial Automation ST/CV is responsible for the design and implementation.
TS workshop 2004U. Epting, M.C. Morodo Testa - TS department1 Improving Industrial Process Control Systems Security Uwe Epting (TS/CSE) Maria Carmen Morodo.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Software Production ( ) Lecture 3: Dr. Samer Odeh Hanna (PhD) office: 318.
13th May 2004Uwe Epting - TS/CSE-CO1 TS-CSE Outline –TCR and TS-CSE-CO mandate –Applications –Console layout –Hardware and Operating System –Strategy –Conclusion.
LHCONE Monitoring Thoughts June 14 th, LHCOPN/LHCONE Meeting Jason Zurawski – Research Liaison.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
Support for Technical Infrastructure operations P. Sollander, AB/OP/TI.
Connect Collaborate Innovate End to end video solutions.
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Safety Systems for ALICE
Performance monitoring framework for the technical infrastructure
Cross-site problem resolution Focus on reliable file transfer service
Software Configuration Management
Safety in Construction and Upgrade Phases
IEEE Std 1074: Standard for Software Lifecycle
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
Projects Integrating Planning for Successful Occupancy, Operation, and Maintenance into your Capital Project.
Leigh Grundhoefer Indiana University
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Presentation transcript:

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen1 TCR Remote Monitoring for the LHC Technical Infrastructure M.C. Morodo Testa (ST/CV) S. Poulsen (ST/EL) U. Epting (ST/MA) TCR Remote Monitoring for the LHC Technical Infrastructure M.C. Morodo Testa (ST/CV) S. Poulsen (ST/EL) U. Epting (ST/MA)

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen2 Outline Purpose Procedure Clients and project organization Integration lifecycle Problems and solutions Conclusion Purpose Procedure Clients and project organization Integration lifecycle Problems and solutions Conclusion

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen3 Purpose Equipment –local installation and responsibility –operational 24h/day -> monitoring needed Equipment –local installation and responsibility –operational 24h/day -> monitoring needed TCR –common control room to monitor equipment from different groups –first line intervention by TCR (outside working hours) –troubleshooting by the equipment groups TCR –common control room to monitor equipment from different groups –first line intervention by TCR (outside working hours) –troubleshooting by the equipment groups Communication (technical) Communication (human)

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen4 Procedure Easy procedure = TCR Control Desk (TCD) –exists since 2000 –approved procedure (used more than 600 times) –covers both: projects operation/maintenance Easy procedure = TCR Control Desk (TCD) –exists since 2000 –approved procedure (used more than 600 times) –covers both: projects operation/maintenance How does it work?

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen5 TCR and ST/MA/INEquipment Group TCD Procedure Announce equipment installation or change Define linkmen (Equipment expert and TCR operator) Establish planning Define data (alarms, signals, mimic diagrams, tools,...) Equipment installationData integration Operation and Maintenance Phase Test Reception

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen6 Clients Project leader Technical expert Group linkman ST/MA linkman Technical expert ST/EL –ENS integration ST/CV –Water 2000 –LHC ventilation –Computer centre ventilation –... ST/MA/AS –Fire detection –Gaz detection Others (mainly for GTPM) –Vacuum –Access Control –... ST/EL –ENS integration ST/CV –Water 2000 –LHC ventilation –Computer centre ventilation –... ST/MA/AS –Fire detection –Gaz detection Others (mainly for GTPM) –Vacuum –Access Control –...

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen7 ST/EL Organization ST/EL (ENS) –One linkman (EL and TCR) for all problems –Single data exchange interface (GATEX), one contractor –No change from project start to operation phase since 3 years ST/EL (ENS) –One linkman (EL and TCR) for all problems –Single data exchange interface (GATEX), one contractor –No change from project start to operation phase since 3 years Project leader Technical expert Group linkman ST/MA linkman Technical expert ST/EL C

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen8 ST/CV –Linkman per project (CV and TCR) –2 data exchange interfaces of 2 different contractors (SCADA-ECs) + direct PLC access (Dsec) –Project and operation done by different teams ST/CV –Linkman per project (CV and TCR) –2 data exchange interfaces of 2 different contractors (SCADA-ECs) + direct PLC access (Dsec) –Project and operation done by different teams ST/CV Organization Project leader Technical expert Group linkman ST/MA linkman Technical expert ST/CV CCC

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen9 ST/MA/AS Organization Project leader Technical expert Group linkman ST/MA linkman Technical expert MA/AS C ST/MA/AS (Fire- and Gaz Detection) –One linkman –One data exchange interface (PLC, Dsec) –Installation, maintenance and upgrades done by ST/MA/IN ST/MA/AS (Fire- and Gaz Detection) –One linkman –One data exchange interface (PLC, Dsec) –Installation, maintenance and upgrades done by ST/MA/IN

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen10 Others - Organization Project leader Technical expert Group linkman ST/MA linkman Technical expert Others Others (Vacuum, Access Control,...) –Linkman per group –different data exchange interfaces, maintained by ST/MA/IN –not critical for operation –Alarms handled directly with AB/CO (CAS) –Mimic diagrams often delivered by groups Others (Vacuum, Access Control,...) –Linkman per group –different data exchange interfaces, maintained by ST/MA/IN –not critical for operation –Alarms handled directly with AB/CO (CAS) –Mimic diagrams often delivered by groups

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen11 Current Organization Project leader Technical expert Group linkman ST/MA linkman Technical expert ST/EL C ST/CV CCC MA/AS C Others Proposal: "Super - Linkman" Proposal: "Super - Linkman"

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen12 Integration life cycle phases actors process definition monitoring design Test / Reception operational start-up ST/MA PL Group linkman TCR linkmanGroup linkman TCR linkmanPL Group linkman TCD request & CAS t integration effort

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen13 Problems and Solutions phases actors process definition monitoring design Test / Reception operational start-up ST/MA PL Group linkman TCR linkmanGroup linkman TCR linkmanPL Group linkman TCD request & CAS Project launch –Planning not always in phase with TCR availability define ST/MA linkman from the beginning include TCR integration phase in planning –TCR tools requirements not known foresee special development for integration

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen14 Problems and Solutions phases actors process definition monitoring design Test / Reception operational start-up ST/MA PL Group linkman TCR linkmanGroup linkman TCR linkmanPL Group linkman TCD request & CAS Operation and Monitoring roles often unclear –define monitoring role in early project phase Monitoring needs not known –invite linkman to all project meetings –include this point on the meeting agenda

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen15 Problems and Solutions phases actors process definition monitoring design Test / Reception operational start-up ST/MA PL Group linkman TCR linkmanGroup linkman TCR linkmanPL Group linkman TCD request & CAS Alarm and signal definition –careful signal and alarm definition to avoid changes during integration phase Mimic Diagrams for TCR –use of web based mimic diagrams encouraged –development by equipment groups based on TCR- HCI conventions

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen16 Problems and Solutions phases actors process definition monitoring design Test / Reception operational start-up ST/MA PL Group linkman TCR linkmanGroup linkman TCR linkmanPL Group linkman TCD request & CAS Reception –sometimes unclear as equipment runs even if integration tests failed foresee enough time for corrections in case of failed tests –prepare TCR operator training and clear instructions for troubleshooting

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen17 Problems and Solutions phases actors process definition monitoring design Test / Reception operational start-up ST/MA PL Group linkman TCR linkmanGroup linkman TCR linkmanPL Group linkman TCD request & CAS Operation and maintenance –Changes must be coordinated on both sides foresee procedure for changes –be prepared for hard- and software evolution (e.g.: OS updates, API changes,...)

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen18 Conclusion Technical problems almost solved Organizational challenges identified Let's do it... Technical problems almost solved Organizational challenges identified Let's do it...

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen19 Questions ? ?

TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen20 Current situation Number of linkmen –already reduced improvements still possible Meetings –integration issues now addressed in progress meetings must be included already in design phase TCR Mimic Diagrams –HCI conventions exist improve common development Data Exchange Interfaces –Homogenisation envisaged started but not yet finished Number of linkmen –already reduced improvements still possible Meetings –integration issues now addressed in progress meetings must be included already in design phase TCR Mimic Diagrams –HCI conventions exist improve common development Data Exchange Interfaces –Homogenisation envisaged started but not yet finished