City of Cambridge Department of Public Works October 19, 2010 Schedule: Construction Beginning: October 2010 Construction Duration: 18 months Contractor:

Slides:



Advertisements
Similar presentations
City of Madras – Madras Elementary/Buff Elementary School: Sidewalk construction, crosswalk improvements, and safety.
Advertisements

City of Eugene: (1) Meadow View School (2) Prairie Mountain School (3) Malabon Elementary School (4) Arts & Technology Academy
Who we are these people? Gabriela Vega – Transportation Planner, DDOT/PPSA George Branyan – Pedestrian Program Coordinator, DDOT/PPSA Trey Dickerson –
Downtown Access Improvements Plan Town of Hillsborough 2014.
Walnut Creek Pedestrian Master Plan Summary of results of April–May 2014 online survey June 9, 2014 E ISEN |L ETUNIC.
Lawrence Park-Wide Traffic Task Force Update April 11 th, 2008 Lawrence Park Ratepayers Association.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
COMPLETE STREETS ROCHESTER, MINNESOTA September 28, 2011 Mitzi A. Baker, AICP Active Living Rochester Rochester-Olmsted Planning Department.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
City of Cudahy Packard Avenue Streetscape Project INFORMATIONAL MEETING #2 Prepared for the City of Cudahy Common Council Packard Avenue Businesses & Property.
Titusville to Edgewater Bike Loop PD&E Study
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
45 th Ave S Shared Street Design Commission September 17 th, 2009 Megan Hoyt SDOT Traffic Operations.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Examples of Context Sensitive Solutions in an Urban Environment ITD Project Development Conference April 7, 2005 Doug Camenisch, P.E. Parametrix.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Harrisburg Area Transportation Study Cross-river Connections Study Capital Area Cross-River Connections Study prepared for Harrisburg Area Transportation.
Contact: Beth Morris
Slide 1. Slide 2 Introduction How did you get to school as a child?
How Walkable and Bike-able Is UCLA ? Multi-Modal Level Of Service Analysis in the UCLA Campus HYERAN LEE CLASS OF 2014 MASTER OF URBAN AND REGIONAL PLANNING.
Make CSUN Shine Brighter Vehicular and Pedestrian Flow Improvement Projects as of January 2014 Status Update – Active Projects Only.
Downtown Aspen Falls Presented by Donald Norris, City Engineer.
East 169 Street & Third Avenue 24 children hit by vehicles in five years - tied for 4th most dangerous.
Fordham Road & Webster Avenue 26 children hit by vehicles in five years- 3rd most dangerous.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
Some important pedestrian considerations 4-1. Skew increases crosswalk length, decreases visibility 4-2.
March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Nick Johnson, PE Senior Project Manager October 1, 2012.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Current Construction Projects Major Projects Pinellas County.
What does PWD do for our City?. Administrative Services Engineering Operations.
Rte 11, Canton Village PIN Village Board Meeting October 29 th, 2007 Project Information.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Rantoul Street / 1A Reconstruction Project December 10, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
ACHIEVING PHILADELPHIA’S VISION ZERO ACTION PLAN THROUGH INNOVATIVE STREET DESIGN Jackson Wandres, RLA – The RBA Group December 3, 2015.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works.
1 BASIC URBAN BIKEWAY TYPES. 2 Suburban arterial: bike lanes.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
City of Belmont Pavement Reconstruction Project October 15, 2014.
To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.
M-99 (Superior St) Reconstruction Public Open HouseMarch 21, 2016.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
Public Works Capital Projects FY Projects Completed FY 2014.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Approve Humboldt Avenue Pedestrian and Bicycle Improvement Project Plans.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
Scranton/Carter Road Reconstruction
City of Gresham – Hauton B
District 3 Complete Streets Projects
STREETS & STORMWATER DEPARTMENT
#2 lane is eliminated, providing extra space for those exiting parked vehicles and the addition of a bike lane Greater distance between through traffic.
SW Gage Blvd - Street Repair Project
GATE SAFETY Traffic gates on JMU campus are for vehicles only. Do not cross beneath gates that are up as they may come down without warning. James Madison.
City Council March 18, 2014.
Presented by Donald Norris, City Engineer
Presentation transcript:

City of Cambridge Department of Public Works October 19, 2010 Schedule: Construction Beginning: October 2010 Construction Duration: 18 months Contractor: D’Allesandro Corp. For more information :Kelly Dunn,

Charles River Cambridge Common JFK Park Brattle St. Mt. Auburn St. Mass. Ave. JFK St. Mass. Ave. Memorial Dr. Garden St. Mt. Auburn St. Harvard St. Broadway Quincy St. Peabody St. Harvard Yard Harvard Sq. Church Street JFK Street Lampoon Plaza Johnston Gate Winthrop Street Palmer Street Super Crosswalk

Charles River Cambridge Common JFK Park Brattle St. Mt. Auburn St. Mass. Ave. JFK St. Mass. Ave. Memorial Dr. Garden St. Mt. Auburn St. Harvard St. Broadway Quincy St. Peabody St. Harvard Yard Harvard Sq. JFK Street Dunster, Linden, Plympton

Linden Street – Fall 2010 into Spring 2011 Plympton Street – Fall 2010 into Spring 2011 JFK Street – Spring 2011 into Fall 2011 Dunster Street – Summer 2011 into Fall 2011

Existing Conditions Sidewalks in poor condition – mix of bricks, concrete and asphalt patches. Street paving in poor condition. Street lighting – metal cobras. Narrow Sidewalks – meters and street lights limit available sidewalk width.

Existing Conditions Sidewalk in poor condition – mix of bricks, concrete and asphalt patches. Street paving in poor condition. Street lighting – metal cobras. Narrow Sidewalks – meters and street lights limit available sidewalk width. Existing wood utility poles.

Existing Conditions Sidewalk in poor condition – mix of bricks, concrete and asphalt patches. Street paving in poor condition. Street lighting – metal cobras. Large demand for bike parking.

Existing Conditions Sidewalks in poor condition – mix of bricks and concrete. Street paving in poor condition. Street lighting – metal cobras. Ambulances and other vehicles have difficulty exiting the Harvard Medical Facility. Large demand for bike parking.

Improvements New Paving (All Streets) New Sidewalks (All Streets) Wire Cut Bricks Concrete Pedestrian Ramps Raised Pedestrian Crossings (See Plans) Curb Extensions (See Plans) Bike Lane (JFK Street) Pay and Display Parking Meters (All Streets) Bike Parking (JFK and Dunster) Street Trees (Maximum extent feasible) 1907 Lighting Fixtures (JFK – Eliot to Mt. Auburn, Dunster, Linden, Plympton) Acorn Lighting Fixtures (JFK – Mt. Auburn to Brattle)

Examples of Street Lighting 1907 and Acorn Fixtures

Examples of Recently Completed Wire Cut Brick Super Crosswalk JFK Street (Memorial Drive to Eliot Street) Appian Way