Hall-B Slow Controls N. Baltzell 2 nd 1 st CLAS12 Experiment Workshop February 23, 2016.

Slides:



Advertisements
Similar presentations
CBM slow controls CBM collaboration meeting DAQ work group CBM collaboration meeting DAQ work group Burkhard Kolb GSI1.
Advertisements

CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
SS and AFC Control Systems Brian Martlew 21 st Sept 2011.
Hall D Solenoid Controls. Rockwell Software Overview RSLogix5000 (PLC Programming) RSLinx Classic (Rockwell software/hardware interface) FactoryTalk (GUI.
HPS Slow Controls Overview
R. Lange, M. Giacchini: Monitoring a Control System Using Nagios Monitoring a Control System Using Nagios Ralph Lange, BESSY – Mauro Giacchini, LNL.
Plans for EPICS in Hall D at Jefferson Lab Elliott Wolin EPICS Collaboration Meeting Vancouver, BC 30-Apr-2009.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
CLAS12 CalCom Activity CLAS Collaboration Meeting, March 6 th 2014.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
Thomas Jefferson National Accelerator Facility Page 1 Slow Controls Ken Livingston University of Glasgow.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
The Commissioning of the CLAS12 Detector V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 workshop, June 21 st 2011.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Hovanes Egiyan Jefferson Lab. Main Hall B Beamline Components Beam Tuning Procedure HV System in Hall B Temperature Sensors Summary 10/19/ Hovanes.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring Summary of DAQ WS III o General Architecture o RF System C&M o D0 EPICS extensions.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
FOPI – Slow Control Content 1.FOPI experiment - Overview 2.GUIs for FOPI 3.System Design.
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, June 14 th 2012.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
Product Overview Presentation Issue 1.0 9/4/07 External distribution MKT-SD-P-001E.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
CLAS12 ECAL PCAL DC FTOF... Region 2 DewPnt Region 3 Region 4 Region 1 Mod 1... Mod 2 HV TEMP LV Hierarchy of Slow Controls: Driven by Finite State Machine.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Hall B Gas System Controls Physics Detector Support Group.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
Reveal™ Touch Screen Product Overview
HADES collaboration meeting XXIII GSI, Darmstadt
CLAS12 DAQ/Trigger/Online Status
ATLAS MDT HV – LV Detector Control System (DCS)
CLAS12 Calibration and Commissioning (CALCOM)
GFA Controls IT Alain Bertrand
Overview of CLAS12 Calibration
CLAS12 First Experiment Workshop Report
The IFR Online Detector Control at the BaBar experiment at SLAC
TPC Detector Control System
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Hall-B Slow Controls N. Baltzell 2 nd 1 st CLAS12 Experiment Workshop February 23, 2016

Overview Hall-B Team: – Glasgow & JLab: N. Baltzell, K. Livingston, B. McKinnon, W. Moore – Biweekly meetings: 8:30 on Fridays in L210A – Wiki: With meeting agendas and minutes, Gantt chart, subsystem specs, improving documentation – First goal: KPP, full baseline support by summer’s end – Essential Groups Involved: Detector Support Group (Torus/Solenoid/Cryo/Gas) S. Boyarinov (DAQ) Framework: – UI: java-based CS-Studio – OS: RHEL7 – EPICS: R – Lots of sharing with Hall-D – BEAST alarm handler inside CS-Studio – JLab Mya EPICS archiver – Porting & improving/replacing CLAS6 software – Upgrading hardware where necessary/possible

Overview Detector specific GUIs developed and in use Hierarchical system with navigable tree view Alarm system tested and to be deployed spring 2016 Gas/Torus/Solenoid/Cryo EPICS interface in progress DAQ-Integration developed with HPS Moller counters refurbished Hardware Purchases Ongoing FTC controls

Detector HV Geographic screens for HV – shows status via color trip/on/off/ramping/comms

Detector HV Geographic screens for HV – shows status via color trip/on/off/ramping/comms Provides acces to – global/group/individual controls

Detector HV Geographic screens for HV – shows status via color trip/on/off/ramping/comms Provides acces to – global/group/individual controls

Detector HV Geographic screens for HV – shows status via color trip/on/off/ramping/comms Provides acces to – global/group/individual controls – save/restore

Detector HV Geographic screens for HV – shows status via color trip/on/off/ramping/comms Provides acces to – global/group/individual controls – save/restore ECAL,PCAL,FTOF,CTOF,HTCC – Coming soon: DC, LTCC

Alarm Handler

Hierarchical Tree View Navigate through entire system – by detector/sector – *with wildcard search* Graphs can be included in any screen – e.g. HV Current/Voltage Hierarchy to be used for alarm system – including daq info, scalers, etc

Detector Overview Screens By request of detector groups Example shown for FTC – Includes HV, LV, Gas, Temps, Chiller – Links to controls for each subsystem – Involvement from detector group Similar overview for HTCC exists

Detector Overview Screens By request of detector groups Example shown for FTC – Includes HV, LV, Gas, Temps, Chiller – Links to controls for each subsystem – Involvement from detector group Similar overview for HTCC exists

Detector Overview Screens By request of detector groups Example shown for FTC – Includes HV, LV, Gas, Temps, Chiller – Links to controls for each subsystem – Involvement from detector group Similar overview for HTCC exists Flasher controls screen

Gas System CompactRIO (DSG) EPICS integration for user monitoring & alarms in counting house in progress

Torus, Solenoid 3 Allen-Bradley PLCs (DSG): Power Supplies, Vacuum, Cryo EPICS integration for user monitoring & alarms in counting house in progress

Summary / Outlook En Route to KPP by end of summer 2016 Some of the bigger unfinished pieces: – Refurbish Moller Polarimeter system – FADC/DSC2 scalers to EPICS – Saclay Target integration into EPICS Progress Status HV System [95%] Alarms [50%] Beamline Motors/Scalers [80%] Moller Polarimeter [10%] EPICS DAQ [90%] EPICS rundb [95%] MYA Archiver [50%] Select FADC/DISC Scalers [0%] Gas System [75%] Torus, Solenoid, Cryo [75%] Saclay Target [EPICS=0%] Hall Weather [50%] Wiener Crates [80%] IOC Admin [90%] Detector Specific Screens [50%] SVT (by OPS) [95%] BTA [0%] Wish List Web browser access (WebOPI/VDI) All FADC/DISC Scalers in EPICS Full DAQ controls in CS-Studio Full SVT integration in CS-Studio More …

Upgrade Purchases Server for Mya EPICS archiver (all systems) MOXA serial comms (various  EPICS) – chillers, thermocouples, gaussmeters … GPIB-ETH converters (DC LV  EPICS) Weather system (FC, SF, CH) * – Temperature+Humidity CAEN mainframe CPU+MPS (HV) Cameras (general) * Additional server for remote users * * not finalized