Water Rights Permitting Process What TCEQ is looking for to make an application administratively complete Water Rights Permitting & Availability Section.

Slides:



Advertisements
Similar presentations
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
Advertisements

Water Planning 101 Lower Colorado Regional Planning Group-Region K January 9, 2013 W. David Meesey, O.W.P. (Old Water Planner) 1.
General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
Department of the Environment Water Use and Appropriation of Maryland’s Waters.
Division of State Lands’ Wetlands Program. Issues That Spawned State Wetlands Program (SB 3) Lack of detailed wetlands inventory information or guidance.
Drought Planning and Response Linwood Peele Linwood Peele Water Supply Planning Section Water Supply Planning Section NCDENR - Division of Water Resources.
Presentation Texas Water: What You Should Know November 6, 2010.
THE EXPANDING ROLE of RECYCLED WATER The Need, Benefits and Cost Effectiveness Make Recycled Water an Increasingly Valued Resource Harry Ehrlich, SDA Principal.
Water for Texas 2012 State Water Plan. Water Planning: Legislative Response to Drought  Late 1950s Drought of Record – 1957: Creation of TWDB – $200.
DESALINATION How Critical Is It for the State to Develop Seawater Desalination Supplies? BILL WEST GBRA, General Manager 1.
Southwest Florida Water Management District Rule Development Workshop Water Use Permitting May 2013.
Review of Revised Regional Water Planning Requirements Related to New Drought Chapter 7.0 Spring-Summer 2013 | Matt Nelson Manager, Regional Water Planning.
Water Resources Issues in the Lower Rio Grande June 3, 2005 J. Phillip King, P.E. Assc. Professor/Assc. Dept. Head Dept. of Civil Engineering, NMSU Consultant,
Texas Stream Team …is a joint partnership with Texas Commission on Environmental Quality, U.S. EPA Region VI, Texas State University-San Marcos, and numerous.
THE ARANSAS PROJECT v. BRYAN SHAW, et al. Case No. 2:10-cv-075 U.S. District Court, Southern Division of Texas, Corpus Christi Division.
The Compact  Legally enforceable contract among the Great Lakes States  Provided for in the U.S. Constitution  Ratification by State legislatures 
State Water Planning Methodology of Texas Michelle Buckholtz Rebecca Cesa Wyatt Ellertson.
Water Conservation and Drought Planning Jennifer Allis Texas Commission on Environmental Quality Water Availability Division Resource Protection Team.
Water Conservation Annual Report. Mission Statement The mission of the Texas Water Development Board is to provide leadership, planning, financial assistance,
Water in California: Self-induced Scarcity Waterscape International Group.
Groundwater Management and Groundwater Districts in Texas Rima Petrossian, Texas Water Development Board Public Hearing on Hays Trinity Groundwater Conservation.
ARIZONA DEPARTMENT OF WATER RESOURCES SURFACE WATER RIGHTS UNIT.
Leonard H. Dougal Jackson Walker L.L.P. (512) Upstream Development Water Needs: Supply and Permitting Considerations 24th Annual.
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
Commercial Webinar Series 1 hour presentation Questions will be answered at the end. For technical questions, call
Region K Water Plan John E. Burke, P.E. Chairman, Lower Colorado Regional Planning Group (Region K) General Manager, Aqua Water Supply Corp.
Texas Clean Rivers Program Nueces River Authority Texas Commission on Environmental Quality Citizens.
Water and Wastewater Certification 1 Water & Wastewater Reference Manual.
Permits to Take Water: What you need to know.
Taking Care of Your Water Rights: Permits, Extensions & Certificates Oregon Association of Water Utilities August 2013 Lisa Jaramillo Water Right Services.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
2011 Lower Basin Stakeholder Forum Nueces River Authority Feb 16, 2011 – Uvalde Feb 23, 2011 – Corpus Christi.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
WATER AVAILABILITY MODELING for the SULPHUR RIVER BASIN Texas Natural Resource Conservation Commission Austin, Texas Consultant: R. J. Brandes Company.
Emergency Action Plans for Dams in Texas An EMC’s Role With The EAP Presented By: Megan Dutton, P.E. TCEQ Dam Safety Program.
Water Bank & Water Trust Barney Austin Surface Water Resources Division Texas Water Development Board May 21, 2004.
An Interregional Water Solution with Conjunctive Use of Groundwater Haskell L. Simon President, Coastal Plains Groundwater Conservation District Vice President,
Declaring Beneficial Use in Water Use Groups R
Ecological Characteristics of Region K. Region K.
Preparing For Drought Alexander Hinz Daniel Rice Dorothy Young ________________ Water Supply Division Texas Commission on Environmental Quality 2015 TCEQ.
FLOWS FOR THE FUTURE 2005 Environmental Flows Conference Texas State University – San Marcos November 1, 2005 Bob Brandes Region M Water Planning Study.
1 Floodplain Management SESSION 21 Policy History: Rivers as a Legal Battleground Public Policy in the American Federal System – An Overview Prepared by.
Texas Water Development Board and the State Water Implementation Fund for Texas (SWIFT) Doug Shaw Agriculture and Rural Texas Ombudsman.
Policy for Maintaining Instream Flows in Northern California Coastal Streams Monitoring and Reporting Provisions for Water Rights Victoria Whitney Deputy.
ERCOT Generation Drought Best Practices Workshop Water Conservation Practices for Texas Generators February 27, 2012.
STRATEGIES FOR FRESHWATER. CONTEXT FOR STRATEGIES.
Procedures to Implement the Texas Surface Water Quality Standards
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
Reservoir Development Update Region K Meeting July 11, 2012 Karen Bondy, P.E. Manager of Resource Strategy 1.
Texas Surface Water Quality Standards Update Joe Martin Water Quality Standards Work Leader Joe Martin Water Quality Standards Work Leader.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
1. 2 Required under water right Establishes limit on LCRA firm water contract sales from lakes Industry standard for evaluating available water supply.
Chapter 21 Water Supply, Use and Management. Groundwater and Streams Groundwater –Water found below the Earth’s surface, within the zone of saturation,
Water Rights: Change of Ownership Stephen Kinal Water Rights Availability Division Water Rights Compliance Assurance Team.
Climate Change Threat Reduced Snowpack 1. Potential Impacts Related to Reduced Snowpack How might our community be impacted by reduced snowpack? 2.
HB 2031 and HB 4097: Marine Seawater Desalination Rulemaking Trade Fair / May 2016 Office of Water Water Availability Division Water Quality Division.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
permitting.
Water Rights: Change of Ownership
2017 Llano Estacado Regional Water Plan Planning Group Meeting
Kansas Experience in Technical Negotiations for Tribal Water Right Settlements Symposium on the Settlement of Indian Reserved Water Rights Claims, Great.
Water Rights Permitting Process
Texas Hydrological Conditions An Overview
Water Quality and Environmental Flows
Water Rights Permitting Process
Water Loss, Use and Conservation - you gave us the data, now what?
Brooke McGregor, Program Liaison, Watermaster Section
Changing Owners of Water Rights
Presentation transcript:

Water Rights Permitting Process What TCEQ is looking for to make an application administratively complete Water Rights Permitting & Availability Section Water Availability Division

Overview of Water Rights Application Review Process Permitting Hydrology Environmental Conservation Q & A Session Topics

Permitting Review of Water Rights Chris Kozlowski Natural Resource Specialist Water Rights Permitting Team

What is State Water? Texas Water Code Section State Water – The water of the ordinary flow, underflow, and tides of every flowing river, natural stream, and lake, and of every bay or arm of the Gulf of Mexico, and the storm water, floodwater, and rainwater of every river, natural stream, canyon, ravine, depression, and watershed in the state is the property of the state.

When is a Water Rights Permit Required? Texas Water Code Section No person may appropriate any state water or begin construction of any work designed for the storage, taking, or diversion of water without first obtaining a permit… Individuals, corporate entities, water supply corporations, municipalities, river authorities, etc.

Types of Water Rights Perpetual Rights Water Use Permits Certificates of Adjudication Certified Filings and Claims (rare) Temporary Permits Issued for a period of 3 years or less 10 acre-feet or more and/or more than one year 10 acre-feet or less and less than one year (Regional Office or Watermaster) Term Right Issued to use appropriated but unused water

Most Common Exemptions Texas Water Code Section (a) & (b) A person may construct on a person’s own property a dam/reservoir with a normal storage capacity of no more than 200 acre-feet of water for domestic, livestock, or wildlife management purposes. The reservoir is NOT EXEMPT if located on a navigable stream. “Reasonable” diversions for domestic use

Application Process

Pre-Application Meeting Not mandatory but highly recommended Speeds up the process and helps make sure your application is administratively complete before submitting to TCEQ. Who will attend? Applicant Consultants and attorneys Technical staff (Permitting, Hydrology, Conservation, Environmental, Legal, Dam Safety)

General Information TCEQ evaluates each water right application to determine if it can be granted. This involves a review to ensure: the application is administratively complete, with all the information we need to evaluate it Title 30, Texas Administrative Code, Chapter 295 technical requirements are met, such as water availability, conservation, and environmental aspects Title 30, Texas Administrative Code, Chapters 288, 297, 298

Project Manager - Application Review The project manager is the applicant’s main point of contact at the TCEQ. Ensures that all application details (amounts, uses, etc.) are consistent Updates/creates Central Registry entries Calculates application and notice fees Determines whether courtesy information should be given (General Land Office consent, Water Use Fee assessment)

TCEQ staff reviews: Legal name of the Applicant Signature authority Outstanding fees and penalties TWDB surveys Bearing and distances Ownership Deeds for land irrigated and inundated Proper consents or contracts ZIP Codes Project Manager - Application Review

Hydrology Review of Water Right Applications Chris Peters Team Leader Surface Water Availability Team

Topics Supplemental Information Sheets Diversion Dam/Reservoir Maps Alternate Sources of Water

Common Information for All Supplemental Information Sheets Locational Information Coordinates in decimal degrees to 6 decimal places Drainage Area TCEQ calculates in square miles Watercourse Information USGS Topographic Maps Stream or reservoir

Supplemental Diversion Point Information Sheets Diversion Point Number This is helpful when there are multiple diversion points Diversion Rate Information Number of pumps and the maximum rate in gallons per minute (gpm) Clarification if the rate will be a maximum combined rate between multiple points

Supplemental Dam/Reservoir Information Sheets Reservoir number This is helpful when there are multiple reservoirs Type of reservoir On-channel or off-channel Capacity Acre-feet

Maps Acceptable Maps USGS 7.5 Minute Topographic Aerial Photography Information to Add to Maps All Diversion points All Discharge points All Reservoirs

Alternate Sources of Water Groundwater 24 hour pump test Well location Groundwater Conservation District permit Surface Water Contract or Lease Agreement

Environmental Review of Water Right Applications Robert Hansen Aquatic Scientist Resource Protection Team

In 2007, the 80th Legislature passed Senate Bill 3 relating to the development, management, and preservation of the water resources of the state. S.B. 3 changed the process for incorporating environmental protection into water rights permits for new appropriations of water. Environmental Flow Standards

SubchapterBasin and Bay System AGeneral Provisions BTrinity and San Jacinto Rivers and Galveston Bay CSabine and Neches Rivers and Sabine Lake Bay DColorado and Lavaca Rivers and Matagorda and Lavaca Bays E Guadalupe, San Antonio, Mission, and Aransas Rivers and Mission, Copano, Aransas, and San Antonio Bays FNueces River and Corpus Christi and Baffin Bays GBrazos River and its associated bay and estuary system HRio Grande, the Rio Grande estuary, and the Lower Laguna Madre Information on the adopted environmental flow standards can be found in Title 30 the Texas Administrative Code (TAC) Chapter 298 TCEQ’s Rules

Environmental Reviews in Basins without Adopted Eflow Standards Reviews are conducted in accordance with Texas Water Code Sections: – Bed and Banks Authorizations – Bed and Banks Authorizations – Effects on Bays and Estuaries and Instream Uses – Effects on Bays and Estuaries and Instream Uses – Evaluation of Bays and Estuaries Data – Evaluation of Bays and Estuaries Data – Effects on Water Quality – Effects on Water Quality – Effects on Fish and Wildlife Habitat – Effects on Fish and Wildlife Habitat

Required Application Information Color photographs of the stream and riparian areas (upstream and downstream) Brief description of the waterbody Description of known recreation or other public uses

Information for Dams/Reservoirs Description of area affected if a new proposed dam/reservoir Surface area of lake inundation at normal pool level Project number and name of USACE project manager if 404 Permit is required Identification of alternate source of water to maintain the reservoir Construction date of dam (if existing)

Information on Groundwater Well depth and name of source aquifer Water chemistry including: Chlorides Sulfates Total Dissolved Solids (TDS) pH Temperature

Water Conservation Review Jennifer Allis Natural Resource Specialist Resource Protection Team

Title 30 TAC Chapter 288 Rules and requirements for Water Conservation Plans are governed by Title 30 TAC Sections 288.2, 288.3, and Rules and requirements for Drought Contingency Plans are governed by Title 30 TAC Sections , and Rules and requirements for Drought Contingency Plans are governed by Title 30 TAC Sections , and

Water Conservation Plans (WCP) Water Conservation - everyday practices or techniques intended to reduce water consumption, reduce loss or waste of water, improve the efficiency in the use of water and increase recycling & reuse so that a water supply is available for future use. Water Conservation - everyday practices or techniques intended to reduce water consumption, reduce loss or waste of water, improve the efficiency in the use of water and increase recycling & reuse so that a water supply is available for future use.

Drought Contingency Plans (DCP) A strategy or combination of strategies for temporary and potentially recurring water supply shortages and other water supply emergencies.A strategy or combination of strategies for temporary and potentially recurring water supply shortages and other water supply emergencies.

Drought Contingency vs. Water Conservation Water Conservation = all the time Drought Contingency = when necessary

WCPs for Water Right Applications An application for a new water right and certain applications to amend existing water rights require the submission of a WCP. The TCEQ evaluates WCPs in accordance with agency rule requirements in Title 30 TAC Chapter 288 for applications requesting consumptive uses of water including municipal, industrial, mining, and agricultural purposes. The TCEQ also determines consistency with State and Regional Water Plans for water rights applications.

Municipal WCP Elements Utility Profile Record Management (Retail use only) 5 & 10 year goals for water savings Meter calibration and replacement Water loss accounting Public education program Non-promotional water rates Implementation and Enforcement Coordination with your RWPG

Utility Profile Population and customer data Water use data in gallons per capita per day (GPCD) Water supply system data Wastewater system data

DCPs for Water Rights Applications TCEQ requires wholesale and retail public water suppliers and irrigation districts to develop drought contingency plans consistent with the appropriate approved regional water plan to be implemented during periods of water shortages and drought. DCPs are also required for all municipal water rights applications.

DCP Plan Elements Public Involvement Public Involvement Ongoing Education Ongoing Education Notification Procedures Notification Procedures Triggering Criteria Triggering Criteria Response Stages Response Stages Quantified Targets Quantified Targets Management Measures Management Measures Variances Variances Enforcement & Adoption of the DCP Enforcement & Adoption of the DCP

Non-Water Rights Submittals Who is required to have a WCP? Non-irrigation (municipal and industrial) water rights holders of 1,000 acre-feet or more and Irrigation water rights holders of 10,000 acre-feet or more WCPs are required to be submitted to TCEQ every 5 years

Non-Water Rights Submittals Who is required to have a DCP? Retail public water suppliers with 3,300 or more connections, wholesale water suppliers, and irrigation districts are required to submit their DCP to the TCEQ every 5 years. Retail public water suppliers with less than 3,300 connections must prepare and adopt a drought contingency plan and make the plan available for inspection by TCEQ, but they are not required to submit plans to TCEQ.

Reminders DCPs should be revised as often as necessary especially as your triggers change over time. DCPs should be revised as often as necessary especially as your triggers change over time. Reminder: Reminder: The next deadline to submit revised WCPs and DCPs for non-water right submittals TCEQ is May 1, 2019.

Contact Information & Website Water Availability Division Water Rights Permitting & Availability _rights/wawr_permits.html