1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.

Slides:



Advertisements
Similar presentations
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
Selection Board PRR G. Avoni, I. Lax, U. Marconi INFN Bologna PRR, 13/6/06.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
Stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The NEMO DAQ electronics: Actual characteristics and new features.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
EUDRB: the data reduction board of the EUDET pixel telescope Lorenzo Chiarelli, Angelo Cotta Ramusino, Livio Piemontese, Davide Spazian Università & INFN.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
1 GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE “off-detector” readout electronics for the Gigatracker: status update.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
TALK, LKr readout and the rest… R. Fantechi, G. Lamanna 15/12/2010.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Status of NA62 straw electronics Webs Covers Services Readout.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
July 17, 2013 CERN T. Flick University of Wuppertal.
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
OPERA TT MEETING BRUSSELS, April 11, 2003 Status of the OPERA DAQ Status of the OPERA DAQ D.Autiero, J.Marteau T.Descombes  informatics S.Gardien, C.Girerd,
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
Trigger matched firmware Top Level block diagram 4ch 3.2gbps deserializer “Test Assembly 1” Module Latency buffer 1GB DDR2 DRAM a.c.r The GTKRO.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Status of the NA62 network R. Fantechi 23/5/2012.
Amsterdam, Oct A. Cotta Ramusino, INFN Ferrara 1 EUDRB: status report and plans for interfacing to the IPHC’s M26 Summary: EUDRB developments.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
29 May 2009 Henk Boterenbrood, Augusto Ceccucci, Bjorn Hallgren, Mauro Piccini and Helmut Wendler 1 The Calorimeter Recorder CARE.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Marc R. StockmeierDCS-meeting, CERN DCS status ● DCS overview ● Implementation ● Examples – DCS board.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
X SuperB Workshop - SLAC Oct 06 to Oct 09, 2009 A.Cotta Ramusino, INFN Ferrara 1 SuperB IFR: outline of the IFR prototype electronics A.C.R
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
PC-based L0TP Status Report “on behalf of the Ferrara L0TP Group” Ilaria Neri University of Ferrara and INFN - Italy Ferrara, September 02, 2014.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
LKr status R. Fantechi.
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Iwaki System Readout Board User’s Guide
L0 processor for NA62 Marian Krivda 1) , Cristina Lazzeroni 1) , Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava,
EMU Slice Test Run Plan a working document.
Front-end electronic system for large area photomultipliers readout
TileCal ROD Commissioning Counting Room Installation
Commodity Flash ADC-FPGA Based Electronics for an
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker “off-detector” readout (GTK-RO)electronics

2 Preliminary DCS technical specifications (v1.0) for the GTK-RO electronics Topics:  Introduction  Types and quantities of standard VME crates  List of GTK-RO status variables  Preliminary list of TDC-pix status variables (to be defined with Alex) DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE

3 “off-detector” readout electronics for the Gigatracker (GTK_RO): status report  Introduction This document describes the types of crates and modules composing the “off- detector” readout system for the GTK subdetector. The DCS should perform a set of standard control / monitoring functions on the crate power supplies of the “off-detector” electronics. The “off-detector” GTK readout card (GTK-RO) will also monitor some local variables whose status could be monitored by the DCS and this document provides a list of such variables. This document does not cover the topic of configuring the Gigatracker ASICs (“TDCpix”) configuration. The Gigatracker subdetector PCs will maintain the information concerning the configuration and the status of the TDCpix on the GTK stations and the handling of these parameters will then be covered in a separate document. DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE

4 “off-detector” readout electronics for the Gigatracker (GTK_RO): status report  Types and quantities of standard VME crates Four VME crates located in the farm room: they are one each in rack S16 and S14 and two in rack S15 (of the 2 in rack S15 one if for the GTK-RO cards and one is for the main timing unit) The characteristics of the VME crates (all are the same) for the “off-detector” electronics are summarized in the table below: DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE LHC inv noManuf. part noDescription 71130P U (+3.3V/100A, +5V/100A, +-12V/10A, 48V/12A) 71290B06.025JVME64x BIN Local 21x6U 71300F U FM (160mm) Eth+RS232 Controls to be performed on each crate: the standard remote controls: power cycling crate wide reset (not mandatory) and monitoring: supply voltages and currents (only +5V and +12V are used by the GTK-RO cards) temperature fan speed should be sufficient: Cables: the standard for the type of the intelligent fan tray listed above (0F )

5 “off-detector” readout electronics for the Gigatracker (GTK_RO): status report  Types and quantities of standard VME crates DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Crate denomination: Referring to the layout of racks in the PC farm room, the racks assigned to the GTK-RO systems are J04, J05, J06 and J07, the last one hosting fibers patch panels and ethernet switches. J04J05J06 J07 GTK1GTK2GTK3 GTK_TU 10 boards 1 to 3 boards

6 “off-detector” readout electronics for the Gigatracker (GTK_RO): status report Variables exposed by EACH GTK-RO card: (total of 30) - 1x : FPGA temperature - 5x : optical signal power detected by the on-board optical receivers - 1x : supply current at +12V power input - 1x : supply current at +5V power input - 1x : supply current from +0.9V regulators for FPGA core - 1x : supply current from +1.8V regulators for DDR2 bias - 1x: "Global status register", 16bit: bit 0: UFT clock generators configured bit 1: DDR2_port1 initial calibration OK bit 2: DDR2_port2 initial calibration OK bit 3: fast_data_RX_link_0_Clock_Data_Recovery_OK bit 4: fast_data_RX_link_1_Clock_Data_Recovery_OK bit 5: fast_data_RX_link_2_Clock_Data_Recovery_OK bit 6: fast_data_RX_link_3_Clock_Data_Recovery_OK bit 7: slow_control_link_OK (connection to the “TDC-pix Slow-link controller” ASIC is properly working) bit 8: TTC_link_OK ( meaning that the TTC-rq module installed on the GTK-RO card is correctly receiving and decoding the TTC signals) bit : to be defined - 1x: "Received_Trigger_Number_register": 32bit : number of triggers received by the GTK-RO card in the last burst (Note: it needs the knowledge of burst START and END) - 1x: "Sent_Trigger_Number_register": 32bit : number of trigger response packets sent by the GTK- RO card in the last burst (Note: it needs the knowledge of burst START and END) DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE  List of GTK-RO status variables

7 “off-detector” readout electronics for the Gigatracker (GTK_RO): status report Variables exposed by the “GTK_TimingUnit “ card: (total of 1 to 3) - 1x : FPGA temperature - 1x : temperature of the “high quality timing” circuit block - 1x : supply current at +12V power input - 1x : supply current at +5V power input - 1x : supply current from +0.9V regulators for FPGA core - 1x: "Global status register", 16bit: bit 0: UFT clock generators configured bit 1: TTC_link_OK ( meaning that the TTC-rq module installed on the GTK-RO card is correctly receiving and decoding the TTC signals) bit : to be defined - 12x: TX optical power feedback DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE  List of GTK-RO status variables