Linear Programming Water Resources Problem. 2: Water Resources Problem The total water demand for Gaza Strip is 160 MCM/yr (80 for Municipal and Industrial.

Slides:



Advertisements
Similar presentations
Transshipment Problem
Advertisements

Sustainable Management of Scarce Resources in the Coastal Zone SMART ICA3 – Kick-off Meeting CEDARE, Cairo, 5-6 January, 2003 Case Study Jordan.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
INTEGRATED MANAGEMENT OF GROUND WATER RESOURCES IN CYPRUS
Linear Programming Sensitivity of the Right Hand Side Coefficients.
Desalination and Reverse Osmosis
WRWSA Water Supply Plan Update Progress Report – (April 1- May 15) >Project Tasks 1.Water Demand Estimates 2.Availability of Ground- and Surface Water.
Water Resources Problem
Linear Programming Special Cases Alternate Optimal Solutions No Feasible Solution Unbounded Solutions.
Heart Valves Suppliers
Math Minutes 1/20/ Write the equation of the line.
MED-CSP Concentrating Solar Power for the Mediterranean Region WP1: Sustainability Goals WP2: Renewable Energy Technologies WP3: Renewable Energy Resources.
Wastewater generation
Linear Programming Operations Research – Engineering and Math Management Sciences – Business Goals for this section  Modeling situations in a linear environment.
EU, SIXTH FRAMEWORK PROGRAMME Optimisation for Sustainable Water Management EU funded Project: OPTIMA INCO-MPC Partner: INTERGEO Environmental Technology.
Water Crisis in Gaza Strip A study of the Impact of Middle East Conflict upon Water Quantity and Quality in Gaza Strip By: Ayman H. Afifi Islamic University.
1 California Water Plan Update 2009 Resource Management Strategies Overview 1 st Plenary Meeting Sacramento October 23, 2007.
Cottonwood Water & Sanitation DistrictSeptember 2002 Arber Indirect Potable Reuse at Cottonwood Water and Sanitation District Rick Arber, Ben Johnson Richard.
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
Opener. Notes: 3.4 Linear Programming Optimization  Many real-life problems involve a process called optimization.  This means finding a maximum or.
1 «Existing situation, plans and policies for the wastewater reuse in agriculture in Cyprus, Jordan and Palestine» KONSTANTINOS MOUSTAKAS NTUA PhD Candidate.
Warm Up 53 When developing a town for 10,000 people, what are some things (such as houses) that would need to be built?
1.Freshwater, Marine and Brackish Water Resources 2. Freshwater pollution.
Rest of APES Water Pollution Notes. Reducing Water Pollution through Sewage Treatment Natural and artificial wetlands and other ecological systems can.
Abu Dhabi Emirate, one of the seven different Emirates which comprise the United Arab Emirates (UAE), The Environmental Research and Wildlife Development.
1 The Dual in Linear Programming In LP the solution for the profit- maximizing combination of outputs automatically determines the input amounts that must.
Earth’s Waters SQ3R’s. SQ3R Ch. 1, Section 1 How is Water Important *How Do People Use Water? write question Water and Living Things write question Water.
Introduction to linear programming:- - Linear programming (LP) applies to optimization models in which the objective and constraints functions are strictly.
1 Climate Warming & California’s Water Future Jay R. Lund Civil and Environmental Engineering University of California, Davis
1 What is Optimization The Optimization Problem is: Find values of the variables that minimize or maximize the objective function while satisfying the.
Design of bulk supply network in the southern West Bank Prepared by: Muna Faidi Aya Nofal.
D Nagesh Kumar, IIScOptimization Methods: M6L5 1 Dynamic Programming Applications Capacity Expansion.
In some cases, the waste generated by the production of material at a facility must be disposed of at special waste disposal locations. We need to identify.
MSSC 2011 Annual Salinity Summit February 17 – 18, 2011 Thirty Years of Success in Implementing Desalination By Roger K. Noack, P.E. HDR Engineering, Inc.
Tunis-2014, April 3 rd. The beginning of charging was January 2009 and the beginning of monitoring of the impact of the treated wastewater was June 2,
Regionalism in Water Resources Management
TOWARDS A WATER POLICY FOR AUROVILLE & TOWN PLANNING ISSUES: DECISIONS TO TAKE NOW.
RECAP GROUNDWATER. Groundwater Current Use: » DOTD Well Survey (1 mi radius/12 mo) » 500 foot walking receptor survey Potential Use: » sustainable yield.
LINEAR PROGRAMMING 3.4 Learning goals represent constraints by equations or inequalities, and by systems of equations and/or inequalities, and interpret.
January 28, A new power station, privately owned, is established in the Gaza Strip The Israel Electric Company receives a concession.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #4 June 18 – July 15.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #5 July 15 – September 15.
Workshop on Future Water Supplies in Arizona June 21, Day 1 – Highlights Portfolios & Infrastructure Bradley M. Hill, R.G. Water Resources Manager.
EXAMPLE 1 Solve a system graphically Graph the linear system and estimate the solution. Then check the solution algebraically. 4x + y = 8 2x – 3y = 18.
About 70% of national consumption 1.4 Billion m 3 Annual water supply Regional authorities, councils settlements 4,800Customers Permanent and temporary.
Lesson 14.2 Uses of Fresh Water
What are some ways to halt seawater intrusion in the Monterey County aquifers? By Blanca Rios Fall 2015 CSUMB Environmental Studies.
5th World water forum Istanbul, Turkey March 2009
Applications of Linear Programming
Containerized desalination based on RO:
Structural and Non-Structural Approaches to Water Supply
Algebra II Explorations Review ( )
Lecture (3): Estimation of water consumption
Sam Aminfard CATEE 2017 – Texas Energy Summit November 15, 2017
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Why network models? Visualize a mathematical model
Summary Water is a renewable resource that circulates continually between the atmosphere and the Earth’s surface. The energy for the hydrologic cycle is.
WATER WHAT IS IT.
3-3 Optimization with Linear Programming
Max Z = x1 + x2 2 x1 + 3 x2  6 (1) x2  1.5 (2) x1 - x2  2 (3)
Withlacoochee Regional Water Supply Authority
Wastewater effects on Drinking Water
CAPCOG State Water Plan Data
Quantitative aspects in Cyprus (groundwater)
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
LINEARPROGRAMMING 4/26/2019 9:23 AM 4/26/2019 9:23 AM 1.
Solutions of Linear Functions
Water Resources Vocabulary
The Collapse of Gaza's Electricity System – Well-Planned and
Why Potable Reuse in Florida?
Presentation transcript:

Linear Programming Water Resources Problem

2: Water Resources Problem The total water demand for Gaza Strip is 160 MCM/yr (80 for Municipal and Industrial and 80 for agriculture). The M&I demand should be satisfied from groundwater wells, and seawater desalination. The agricultural demand should be satisfied from groundwater wells and from the treated wastewater (TWW) but at least 25% of the agricultural demand should come from the groundwater wells. The maximum capacity of the central seawater desalination plant is 60 MCM/yr. The Palestinian water quality standards require that the water supplied to the M&I should have TDS concentration less than 700mg/l and the water supplied to agriculture should have TDS concentration of less than 1100 mg/l. The integrated aquifer management plan recommended that the max groundwater abstraction should be 100 MCM/yr. The following table shows the estimated benefits, production cost, and the produced quality of each source.

Source BenefitCostQuality $/m3 TDS (mg/l) Sea water desalination Wells for M&I Wells for agriculture TWW for agriculture Ignore other factors, Design a Linear Programming model to seek the optimal utilization from each source? Explain the binding and the slack conditions shown in the answer report? What is the minimum amount of seawater desalination to keep the solution feasible?