PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL-MICAST-EVAC CMD: 0/05:00 MSL-MICAST-HEAT1 CMD: 0/02:00 MSL-MICAST-HEAT2 CMD: 0/04:00 MSL-MCS212-EQUIL CMD: 0/06:00 MSL-MCS212-SOLID CMD: 0/01:30 MSL-MICAST-COOL CMD: 0/05:00 MSRR-VES-USAGE and MSRR-VRS-USAGE MSL Batch 2A Set 2 MICAST 212 Process 23:301:00 :5 VS-LK LIM-CHNG ACT :10 PRO-MSRR RIV CLS-CMD MSL-H/W-PWR MSRR-FACILITY-OPS MSRR-FAC-PWR UP CMD MSRR-FAC-PWR DN CMD Avoid docking phase, thruster firings, and CEVIS usage** Once MICAST-HEAT1 CMD begins, all following activities must occur sequentially with no delays :5 VS-LK LIM-CHNG DEACT* Beginning of MSL-MCS212-EQUIL CMD is scheduled at the beginning of crew sleep. *Required at end of MSL MICAST EVAC CMD **Microgravity conditions required to be as good as possible (<10E-4 g) :10 PRO-MSRR RIV OPN-CMD 1:00 PRO-MSRR ACT-CMD PRO-MSRR DEACT-CMD Commanding Additional Activities Unattended A MSL-NO CEVIS
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSRR-VES-USAGE and MSRR-VRS-USAGE MSL Batch 2A Set 2 SCA Exchange #16 MSL-SCA-EXCH2 #16 1:301:00 MSL-SSP-XFER CMD 1:00 MSL-CHMBR-LEAK CHECK 1:30 :10 PRO-MSRR RIV CLS-CMD MSL-H/W-PWR MSRR-FACILITY-OPS MSRR-FAC-PWR UP CMD MSRR-FAC-PWR DN CMD PRO-PLMDM FILE-CMD :10 PRO-MSRR RIV OPN-CMD B 1:00 PRO-MSRR ACT-CMDPRO-MSRR DEACT-CMD 1:00 Crew Commanding Additional Activities Unattended MSL-LAB-VIDEO A
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSRR-VES-USAGE or MSRR-VRS-USAGE MSL Batch 2A Set 1 SETA 24 Process** 3/23:001:00 :5 VS-LK LIM-CHNG ACT :10 PRO-MSRR RIV CLS-CMD MSL-H/W-PWR MSRR_FACILITY-OPS MSRR-FAC-PWR UP CMD MSRR-FAC-PWR DN CMD :5 VS-LK LIM-CHNG DEACT* :10 PRO-MSRR RIV OPN-CMD B C 1:00 PRO-MSRR ACT-CMD PRO-MSRR DEACT-CMD At least 1 st 6 hours requested during crew sleep *Required at end of MSL SETA EVAC CMD **Should be scheduled in a 3-crew period ***Microgravity conditions required to be as good as possible (10E-4 g). MSL-SETA-EVAC CMD: 0/06:00 MSL-SETA-HEAT1 CMD: 0/03:00 MSL-SETA-HEAT2 CMD: 0/05:00 MSL-SETA24-EQUIL CMD: 0/05:00 MSL-SETA24-SOLID CMD: 2/22:00 MSL-SETA-COOL CMD: 0/06:00 Avoid docking phase, thruster firings, and CEVIS usage*** Once SETA-HEAT1 CMD begins, all following activities must occur sequentially with no delays 1:00 PRO-PLMDM FILE-CMD Crew Commanding Additional Activities Unattended MSL-NO CEVIS
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSRR-VES-USAGE and MSRR-VRS-USAGE MSL Batch 2A Set 2 SCA Exchange #17 MSL-SCA-EXCH2 #17 1:301:00 MSL-SSP-XFER CMD 1:00 MSL-CHMBR-LEAK CHECK 1:30 :10 PRO-MSRR RIV CLS-CMD MSL-H/W-PWR MSRR-FACILITY-OPS MSRR-FAC-PWR UP CMD MSRR-FAC-PWR DN CMD PRO-PLMDM FILE-CMD :10 PRO-MSRR RIV OPN-CMD D 1:00 PRO-MSRR ACT-CMDPRO-MSRR DEACT-CMD 1:00 Crew Commanding Additional Activities Unattended MSL-LAB-VIDEO C
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL-CETSOL-EVAC CMD: 0/05:00 MSL-CETSOL-HEAT1 CMD: 0/02:00 MSL-CETSOL-HEAT2 CMD: 0/04:00 MSL-CTSL26-EQUIL CMD: 0/06:00 MSL-CTSL26-SOLID CMD: 0/01:30 MSL-CETSOL-COOL CMD: 0/05:00 MSRR-VES-USAGE and MSRR-VRS-USAGE MSL Batch 2A Set 2 CETSOL 26 Process MSL-SCA-2A REMOVE #2 1:3023:301:00 MSL-CHMBR-LEAK CHECK 1:30 :5 VS-LK LIM-CHNG ACT :10 PRO-MSRR RIV CLS-CMD MSL-H/W-PWR MSRR-FACILITY-OPS MSRR-FAC-PWR UP CMD MSRR-FAC-PWR DN CMD Avoid docking phase, thruster firings, and CEVIS usage** Once CETSOL-HEAT1 CMD begins, all following activities must occur sequentially with no delays :5 VS-LK LIM-CHNG DEACT* Beginning of MSL-CTSL26-EQUIL CMD is scheduled at the beginning of crew sleep. *Required at end of MSL CETSOL EVAC CMD **Microgravity conditions required to be as good as possible (<10E-4 g) :10 PRO-MSRR RIV OPN-CMD 1:00 PRO-MSRR ACT-CMD PRO-MSRR DEACT-CMD Crew Commanding Additional Activities Unattended MSL-LAB-VIDEO D MSL-NO CEVIS
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL Water Loop Maintenance MSL-WATERLOOP-LK CHK :20:45 MSL-WATERLOOP-REFILL MSL-H/W-PWR MSRR-FACILITY-OPS MSRR-FAC-PWR UP CMD 1:00 PRO-MSRR ACT-CMD 1:00 MSRR-FAC-PWR DN CMD 1:00 PRO-MSRR DEACT-CMD Crew Commanding Unattended
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL Pump Spinup MSL-PUMP-SPINUP CMD 4:00 MSL-H/W-PWR MSRR-FACILITY-OPS :5:10 :5 VS-PPL90_V8-MSRR PRO-MSRR RIV OPN-CMD PRO-MSRR RIV CLS-CMD VS-PPL90_V5-MSRR MSRR-VES-USAGE or MSRR-VRS-USAGE MSRR-FAC-PWR UP CMD 1:00 PRO-MSRR ACT-CMD 1:00 MSRR-FAC-PWR DN CMD 1:00 PRO-MSRR DEACT-CMD Commanding Unattended
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL TMP Lubricate :20 MSL-TMP-LUBRICATE Crew TEXT Flexible
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL Gas Supply Drawer Exchange :40 MSL-GAS SUP-EXCH Crew TEXT Flexible
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Baseline27/2812/9/10 EO10-PPO Baseline27/28 & Subs 4/1/11Nominal: 6.08 Reserve: 0 Inc 27/28 Working PTP 11/1/10 Nominal: na Reserve: na Includes MSL Water Loop Maintenance, Gas Supply Exchange, Pump Spinup, and Turbomolecular Pump Lubrication. These maintenance operations are not included in the PTP. EO10-PPO Revision A29/30 & Subs 6/23/11Nominal: 3.75 Reserve: 0 Inc 29/30 Working PTP 4/22/11 Nominal: 3 Reserve: 0 Includes MSL Batch 2A Processing. EO10-PPO Revision B31/32 & Subs 12/8/11Nominal: Reserve: 0 Inc 31/32 Working PTP 10/31/11 Nominal: 2.75 Reserve: 0 Concludes MSL Batch 2A Processing (3 samples) and adds MSL Batch 2A Set 2 Processing (11 samples). MSL Water Loop Maintenance, Gas Supply Exchange, Pump Spinup and Turbomolecular Pump Lubrication are not included in crew roll-up because these sequences will be scheduled if required during realtime operations. EO10-PPO Revision C33/34 & Subs 6/28/12Nominal: Reserve: 0 Inc 33/34 Working PTP 5/11/12 Nominal: 7.5 Reserve: 0 Includes processing for 3 MSL Batch 2A Set 1 experiments and 11 MSL Batch 2A Set 2 experiments. Gas Supply Exchange activity is only maintenance activity included in crew rollup EO10-PPO Revision D33/34 & Subs 7/30/12N/A Added MSL-LAB-VIDEO untended activity as required. MSL PPO Change Log *Crew Roll-up is not maintained real-time.
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Revision E33/3410/11/12Nominal: Reserve: 0 Inc 33/34 Working PTP 8/22/12 Nominal: 9.0 Reserve: 0 Revision includes activities to complete MSRR/MSL Facility Recovery for SQF Cleaning, MSRR Facility Software Update, and SQF Delta Commissioning as well as processing for 3 MSL Batch 2A Set 1 experiments and 11 MSL Batch 2A Set 2 experiments. Gas Supply Exchange activity is only maintenance activity included in crew rollup. EO10-PPO Revision F35/36 and Subs 12/19/12Nominal: Reserve: 0 Inc 35/36 Working PTP 10/24/12 Nominal: 0 Reserve: 2.75 Includes activities to process 11 MSL Batch 2A Set 2 experiments. Gas Supply Exchange activity is the only maintenance activity included in crew rollup. EO10-PPO Revision G37/38 & Subs 6/13/13Nominal: 15.0 Reserve: 0 I37/38 Working PTP 4/29/13 Nominal: 6.0 Reserve: 0 Includes activities to process 10 MSL Batch 2A Set 2 experiments. Maintenance activities TBD. MSL PPO Change Log *Crew Roll-up is not maintained real-time.
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Revision H39/4012/12/13Nominal: 7.5 Reserve: 0 CEF 4388 in review 11/19/13 Nominal: 7.5 Reserve: 1.5 Includes activities to process 5 MSL Batch 2A Set 2 experiments – including MICAST 211, SCA Exchange #13, CETSOL 27, SCA Exchange #14, MICAST 212 Process, SCA Exchange #15, MICAST 213 Processing, SCA Exchange #16, and CETSOL 26 Process. Assumes other samples processed during I37/38. OCR pro1all…844 39/403/25/14Updated VS-PPL90_V8-MSRR activity title to generic title VS-LK LIM-CHNG ACT and VS- PPL90_V5-MSRR activity title to generic title VS-LK LIM-CHNG DEACT OCR ppm1all…178 39/405/9/14Added SETA 24 PROCESS PPO to SCA processing flow for I39/40 ops. EO10-PPO Revision I41/42 & Subs 10/24/14Added Document Number MSL PPO Change Log *Crew Roll-up is not maintained real-time.