PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL-MICAST-EVAC CMD: 0/05:00 MSL-MICAST-HEAT1 CMD: 0/02:00 MSL-MICAST-HEAT2 CMD: 0/04:00 MSL-MCS212-EQUIL.

Slides:



Advertisements
Similar presentations
Automating Software Module Testing for FAA Certification Usha Santhanam The Boeing Company.
Advertisements

Module 2: Maintaining Restrooms SPARKLING RESTROOM TRAINING PROGRAM.
TTSS Interactive Products, Inc. Office Building System Sample Flow 1100 Louisiana Houston, TX.
RDP-TEKKEM Precision Hydrated Lime Systems. Lime Silo Precision Dosing Assembly RDP-Tekkem System Controls Lime Slurry Piping Lime Slurry Pump Slurry.
Pulping and Bleaching PSE 476 Lecture #5 Continuous Reactors Lecture #5 Continuous Reactors.
MC and Commissioning Preparation
PROJECT AND STUDY DRAWINGS & DIAGRAMS
NASA Bioculture System Capabilities Provides 10 individual cassettes containing hollow fiber bioreactors with media perfusion for a no shear cell culture.
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15S Maintenance.
14s-1Maintenance William J. Stevenson Operations Management 8 th edition.
1 Mission First – People Always – America Forever Base Wide Natural Gas Outage GAS OUTAGE: DATE: TUESDAY 19 SEPTEMBER 2006 TIME: HOURS LOCATION:
DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section Packaging Title Packaging Program Responsibilities Control No. PKG-001.
Demonstrate with your Smarties: 2, 5, 8, 11, 14, 17 1.How many groups of Smarties do you have? 2.What did you add from one number to get the next number?
Transition to 6-person crew ASE conference, Praha Oct 8, 2009 Andreas Schön, ESA All dates used in this presentation are examples only, they do not necessarily.
Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.
IT 456 Seminar 5 Dr Jeffrey A Robinson. Overview of Course Week 1 – Introduction Week 2 – Installation of SQL and management Tools Week 3 - Creating and.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 3 Slide 1 Chapter 16 Maintaining Information Systems.
West Virginia University Slide 1 Copyright © K.Goseva 2010 CS 736 Software Performance Engineering Comments on Homework #1  Please revise the solution.
Brentwood of Palatine Condominium Board Meeting Treasurer’s Report – Cash Position – Delinquencies Rules & Regulations Laundry Natural Gas Elliot.
Energy Cost Budget Highlights Jason Glazer, PE GARD Analytics Arlington Heights, Illinois Energy Cost.
New Product Developments World Leaders in Combustion Management Solutions C.E.M.S., MCERTs & E.P.A. Exhaust Gas Analysers C.E.M.S., MCERTs.
Chapter 12 The Network Development Life Cycle
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
CIR FOMA Calibration Crew 9/24/08 1:30 PRO-CIR ACT-CMD FOMA-BTL-CAL 1 CMD PRO-CIR DEACT-CMD 274 watts 402 watts274 watts This sequence powers CIR and correlates.
EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05.
Microgravity User Support Center (MUSC)
EMCS Inc 13 Operations Gary Moore EMCS Ops Lead (256)
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY 0:10 Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-CAMERA-FOCUS.
Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External.
Revision G 8/22/13 PARC/T. Cassady Pro K  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days)
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Revision A 12/19/12 PARC/T. Cassady Spinal Ultrasound SPINAL-S/W-REV_OPR SPINAL-CREW-CONF_OPR Operator Software Review and Crew Conference Ops before Spinal.
EO10-PPO-020 OCR emcs /15/14 PARC/C. Traylor Crew Additional Activities Unattended EMCS Facility Cleanup Post Gravi-2 Ops EMCS-GASRMV MOD-RPL :20.
Microgravity User Support Center (MUSC) Payload Overview POIWG, July Chart 1> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013.
EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS :20 BP Microphone Replacement TEXTFlexible Crew  Sessions required once every 18 months (within.
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
SFU Samples Run (Sample Number) A (1) G1 Video C (1) B (2) C (2) B (3) C (3) B (4) C (4) B (5) C (5) B (6) C (6) B (7) C (7) BCAT-C1 Simon Fraser University.
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate.
PARC/D. Westbrook Revision B 10/23/13 SODI Procedure Review SODI-PROC-REVIEW :30 A Crew Additional Activities TEXT Flexible.
POD Team PARC/M. Barnett EO10-PPO-079 Revision F 8/10/15 Payload Crew Conference :30 PAYLOAD-CREW-CONF (at least twice per increment, monthly preferred)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory ISS Ham Planning Operations.
Higher Active Logic Build Three (HAL 3) PLMDM Bundle Update Express Rack 4 Update David K Deitsch Marshall Space Flight Center Payload Operations & Integration.
Revision E 12/19/12 PARC/E. Litkenhous JAXA-SDRM WGVOPN-PLC PRO-SDRM ACT-CMD 1:00 SpaceDRUMS Experiment Operations SDRM-EXP-POWER UP Nominal Operations.
Product and Application Overview
EN-CV activities for LHC during LS2
Systems Development Life Cycle
Dynamics 365 for Financials
I&T&C Organization Chart
Adding and Subtracting Rational Expressions
Batch Setup.
Destiny Discover Reading Paths
Mathew C. Wright January 26, 2009
Destiny Discover Reading Paths
Children’s Hospital Update
Batch Parties Changes.
Insert Presentation Title Here Insert Presentation Summary Here
Please insert Title Please insert sub-title 1
ชื่อเรื่องนำเสนอ โดย ชื่อผู้นำเสนอ….
Transmitted by the IWVTA Informal Group
ชื่อเรื่องนำเสนอ โดย ชื่อผู้นำเสนอ….
Transmitted by the IWVTA Informal Group
ELECTRONIC document management software
Why We Need Car Parking Systems - Wohr Parking Systems
Types of Stack Parking Systems Offered by Wohr Parking Systems
Add Title.
Presentation transcript:

PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL-MICAST-EVAC CMD: 0/05:00 MSL-MICAST-HEAT1 CMD: 0/02:00 MSL-MICAST-HEAT2 CMD: 0/04:00 MSL-MCS212-EQUIL CMD: 0/06:00 MSL-MCS212-SOLID CMD: 0/01:30 MSL-MICAST-COOL CMD: 0/05:00 MSRR-VES-USAGE and MSRR-VRS-USAGE MSL Batch 2A Set 2 MICAST 212 Process 23:301:00 :5 VS-LK LIM-CHNG ACT :10 PRO-MSRR RIV CLS-CMD MSL-H/W-PWR MSRR-FACILITY-OPS MSRR-FAC-PWR UP CMD MSRR-FAC-PWR DN CMD Avoid docking phase, thruster firings, and CEVIS usage** Once MICAST-HEAT1 CMD begins, all following activities must occur sequentially with no delays :5 VS-LK LIM-CHNG DEACT* Beginning of MSL-MCS212-EQUIL CMD is scheduled at the beginning of crew sleep. *Required at end of MSL MICAST EVAC CMD **Microgravity conditions required to be as good as possible (<10E-4 g) :10 PRO-MSRR RIV OPN-CMD 1:00 PRO-MSRR ACT-CMD PRO-MSRR DEACT-CMD Commanding Additional Activities Unattended A MSL-NO CEVIS

PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSRR-VES-USAGE and MSRR-VRS-USAGE MSL Batch 2A Set 2 SCA Exchange #16 MSL-SCA-EXCH2 #16 1:301:00 MSL-SSP-XFER CMD 1:00 MSL-CHMBR-LEAK CHECK 1:30 :10 PRO-MSRR RIV CLS-CMD MSL-H/W-PWR MSRR-FACILITY-OPS MSRR-FAC-PWR UP CMD MSRR-FAC-PWR DN CMD PRO-PLMDM FILE-CMD :10 PRO-MSRR RIV OPN-CMD B 1:00 PRO-MSRR ACT-CMDPRO-MSRR DEACT-CMD 1:00 Crew Commanding Additional Activities Unattended MSL-LAB-VIDEO A

PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSRR-VES-USAGE or MSRR-VRS-USAGE MSL Batch 2A Set 1 SETA 24 Process** 3/23:001:00 :5 VS-LK LIM-CHNG ACT :10 PRO-MSRR RIV CLS-CMD MSL-H/W-PWR MSRR_FACILITY-OPS MSRR-FAC-PWR UP CMD MSRR-FAC-PWR DN CMD :5 VS-LK LIM-CHNG DEACT* :10 PRO-MSRR RIV OPN-CMD B C 1:00 PRO-MSRR ACT-CMD PRO-MSRR DEACT-CMD At least 1 st 6 hours requested during crew sleep *Required at end of MSL SETA EVAC CMD **Should be scheduled in a 3-crew period ***Microgravity conditions required to be as good as possible (10E-4 g). MSL-SETA-EVAC CMD: 0/06:00 MSL-SETA-HEAT1 CMD: 0/03:00 MSL-SETA-HEAT2 CMD: 0/05:00 MSL-SETA24-EQUIL CMD: 0/05:00 MSL-SETA24-SOLID CMD: 2/22:00 MSL-SETA-COOL CMD: 0/06:00 Avoid docking phase, thruster firings, and CEVIS usage*** Once SETA-HEAT1 CMD begins, all following activities must occur sequentially with no delays 1:00 PRO-PLMDM FILE-CMD Crew Commanding Additional Activities Unattended MSL-NO CEVIS

PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSRR-VES-USAGE and MSRR-VRS-USAGE MSL Batch 2A Set 2 SCA Exchange #17 MSL-SCA-EXCH2 #17 1:301:00 MSL-SSP-XFER CMD 1:00 MSL-CHMBR-LEAK CHECK 1:30 :10 PRO-MSRR RIV CLS-CMD MSL-H/W-PWR MSRR-FACILITY-OPS MSRR-FAC-PWR UP CMD MSRR-FAC-PWR DN CMD PRO-PLMDM FILE-CMD :10 PRO-MSRR RIV OPN-CMD D 1:00 PRO-MSRR ACT-CMDPRO-MSRR DEACT-CMD 1:00 Crew Commanding Additional Activities Unattended MSL-LAB-VIDEO C

PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL-CETSOL-EVAC CMD: 0/05:00 MSL-CETSOL-HEAT1 CMD: 0/02:00 MSL-CETSOL-HEAT2 CMD: 0/04:00 MSL-CTSL26-EQUIL CMD: 0/06:00 MSL-CTSL26-SOLID CMD: 0/01:30 MSL-CETSOL-COOL CMD: 0/05:00 MSRR-VES-USAGE and MSRR-VRS-USAGE MSL Batch 2A Set 2 CETSOL 26 Process MSL-SCA-2A REMOVE #2 1:3023:301:00 MSL-CHMBR-LEAK CHECK 1:30 :5 VS-LK LIM-CHNG ACT :10 PRO-MSRR RIV CLS-CMD MSL-H/W-PWR MSRR-FACILITY-OPS MSRR-FAC-PWR UP CMD MSRR-FAC-PWR DN CMD Avoid docking phase, thruster firings, and CEVIS usage** Once CETSOL-HEAT1 CMD begins, all following activities must occur sequentially with no delays :5 VS-LK LIM-CHNG DEACT* Beginning of MSL-CTSL26-EQUIL CMD is scheduled at the beginning of crew sleep. *Required at end of MSL CETSOL EVAC CMD **Microgravity conditions required to be as good as possible (<10E-4 g) :10 PRO-MSRR RIV OPN-CMD 1:00 PRO-MSRR ACT-CMD PRO-MSRR DEACT-CMD Crew Commanding Additional Activities Unattended MSL-LAB-VIDEO D MSL-NO CEVIS

PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL Water Loop Maintenance MSL-WATERLOOP-LK CHK :20:45 MSL-WATERLOOP-REFILL MSL-H/W-PWR MSRR-FACILITY-OPS MSRR-FAC-PWR UP CMD 1:00 PRO-MSRR ACT-CMD 1:00 MSRR-FAC-PWR DN CMD 1:00 PRO-MSRR DEACT-CMD Crew Commanding Unattended

PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL Pump Spinup MSL-PUMP-SPINUP CMD 4:00 MSL-H/W-PWR MSRR-FACILITY-OPS :5:10 :5 VS-PPL90_V8-MSRR PRO-MSRR RIV OPN-CMD PRO-MSRR RIV CLS-CMD VS-PPL90_V5-MSRR MSRR-VES-USAGE or MSRR-VRS-USAGE MSRR-FAC-PWR UP CMD 1:00 PRO-MSRR ACT-CMD 1:00 MSRR-FAC-PWR DN CMD 1:00 PRO-MSRR DEACT-CMD Commanding Unattended

PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL TMP Lubricate :20 MSL-TMP-LUBRICATE Crew TEXT Flexible

PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL Gas Supply Drawer Exchange :40 MSL-GAS SUP-EXCH Crew TEXT Flexible

PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Baseline27/2812/9/10 EO10-PPO Baseline27/28 & Subs 4/1/11Nominal: 6.08 Reserve: 0 Inc 27/28 Working PTP 11/1/10 Nominal: na Reserve: na Includes MSL Water Loop Maintenance, Gas Supply Exchange, Pump Spinup, and Turbomolecular Pump Lubrication. These maintenance operations are not included in the PTP. EO10-PPO Revision A29/30 & Subs 6/23/11Nominal: 3.75 Reserve: 0 Inc 29/30 Working PTP 4/22/11 Nominal: 3 Reserve: 0 Includes MSL Batch 2A Processing. EO10-PPO Revision B31/32 & Subs 12/8/11Nominal: Reserve: 0 Inc 31/32 Working PTP 10/31/11 Nominal: 2.75 Reserve: 0 Concludes MSL Batch 2A Processing (3 samples) and adds MSL Batch 2A Set 2 Processing (11 samples). MSL Water Loop Maintenance, Gas Supply Exchange, Pump Spinup and Turbomolecular Pump Lubrication are not included in crew roll-up because these sequences will be scheduled if required during realtime operations. EO10-PPO Revision C33/34 & Subs 6/28/12Nominal: Reserve: 0 Inc 33/34 Working PTP 5/11/12 Nominal: 7.5 Reserve: 0 Includes processing for 3 MSL Batch 2A Set 1 experiments and 11 MSL Batch 2A Set 2 experiments. Gas Supply Exchange activity is only maintenance activity included in crew rollup EO10-PPO Revision D33/34 & Subs 7/30/12N/A Added MSL-LAB-VIDEO untended activity as required. MSL PPO Change Log *Crew Roll-up is not maintained real-time.

PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Revision E33/3410/11/12Nominal: Reserve: 0 Inc 33/34 Working PTP 8/22/12 Nominal: 9.0 Reserve: 0 Revision includes activities to complete MSRR/MSL Facility Recovery for SQF Cleaning, MSRR Facility Software Update, and SQF Delta Commissioning as well as processing for 3 MSL Batch 2A Set 1 experiments and 11 MSL Batch 2A Set 2 experiments. Gas Supply Exchange activity is only maintenance activity included in crew rollup. EO10-PPO Revision F35/36 and Subs 12/19/12Nominal: Reserve: 0 Inc 35/36 Working PTP 10/24/12 Nominal: 0 Reserve: 2.75 Includes activities to process 11 MSL Batch 2A Set 2 experiments. Gas Supply Exchange activity is the only maintenance activity included in crew rollup. EO10-PPO Revision G37/38 & Subs 6/13/13Nominal: 15.0 Reserve: 0 I37/38 Working PTP 4/29/13 Nominal: 6.0 Reserve: 0 Includes activities to process 10 MSL Batch 2A Set 2 experiments. Maintenance activities TBD. MSL PPO Change Log *Crew Roll-up is not maintained real-time.

PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Revision H39/4012/12/13Nominal: 7.5 Reserve: 0 CEF 4388 in review 11/19/13 Nominal: 7.5 Reserve: 1.5 Includes activities to process 5 MSL Batch 2A Set 2 experiments – including MICAST 211, SCA Exchange #13, CETSOL 27, SCA Exchange #14, MICAST 212 Process, SCA Exchange #15, MICAST 213 Processing, SCA Exchange #16, and CETSOL 26 Process. Assumes other samples processed during I37/38. OCR pro1all…844 39/403/25/14Updated VS-PPL90_V8-MSRR activity title to generic title VS-LK LIM-CHNG ACT and VS- PPL90_V5-MSRR activity title to generic title VS-LK LIM-CHNG DEACT OCR ppm1all…178 39/405/9/14Added SETA 24 PROCESS PPO to SCA processing flow for I39/40 ops. EO10-PPO Revision I41/42 & Subs 10/24/14Added Document Number MSL PPO Change Log *Crew Roll-up is not maintained real-time.