LHC’s Modular Machine ITER – Machine ProtectionB. ToddJuly 2010 Thanks to : TE/MPE/MI, CERN Machine Protection Panel, et al 1v0 Protection System.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Safe Machine Parameters General Machine Timing Cross-Check Safe Machine Parameters General Machine Timing Cross-Check 9 th May v3.
Click to edit Master title style Machine Protection and Interlocks CERN Accelerator School – May 2014 Machine
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Workshop on Machine Protection, focusing on Linear Accelerator complexes Summary of Fifth Session – Operational Aspects 1)RF Breakdown recovery 2)CLIC.
Concept & architecture of the machine protection systems for FCC
Machine Protection – ISSC 2010B. ToddAugust 2010 Thanks to : TE/MPE/MI, CERN Machine Protection Panel, et al 0v3 A Future Safety System?
CERN Machine Protection – A Future Safety System? Introduction 1 SMP = Safe Machine Parameters System which receives accelerator.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Eva Barbara Holzer IEEE NSS, Puerto Rico October 26, Beam Loss Monitoring System of the LHC Eva Barbara Holzer, CERN for the LHC BLM team IEEE Nuclear.
Overview of Machine Protection for the LHC
1v1 Availability Tracking as a Means to Increase LHC Physics Production B. Todd 1, A. Apollonio 1 and L. Ponce 1 1 CERN – European Organisation for Nuclear.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
B. Todd et al. 25 th August 2009 Observations Since v1.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 Beam Plans for Accelerator Systems: The Machine Protection System Jan Uythoven On behalf of the MPWG and the MPS Commissioning WG Special thanks to R.Schmidt,
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 9 Slide 1 Critical Systems Specification 1.
PLC Workshop at ITER, 4-5 th of December 2014 A. Nordt, ESS, Lund/Sweden.
Machine Protection at the 1MW CEBAF Electron Accelerator and Free Electron Laser Facility Kelly Mahoney Presented at the Workshop for.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
Status of ITER collaboration for Machine Protection I. Romera On behalf of the colleagues who contribute to the project Thanks to: Sigrid, Markus, Rüdiger,
Beam Interlock System Design H. Pavetits 1 PR a-HPA, June 27th, 2011.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
1 Machine considerations and constraints for the Safe Injection Flag and Safe Beam Flag Jörg Wenninger AB-OP-SPS Introduction to ‘injection flags’ Machine.
B. Todd et al. 19 th August 2009 The Beam Interlock System Thanks to: Machine Protection Panel, R. Schmidt, B. Puccio, M. Zerlauth and many more… 0v2.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
CERN Dependable Design Example ITER – Machine ProtectionB. ToddMay 2010 Thanks to : TE/MPE/MI, CERN Machine Protection Panel, et al 1v0 Beam Related Machine.
An invitation to an open discussion We are team reviewing its performance globally We want to help each other to reach the objectives We know the other.
BEAM INSTRUMENTATION GROUP DEPENDABILITY APPROACH CERN, Chamonix 26th January 2016 William Viganò
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
B. Todd, A. Apollonio, M. Kwiatkowski, R. Schmidt, S. Wagner, J. Walter a Risk-Based Approach 1v2 to Machine Protection Systems.
Summary of Session 1 - CLIC MP workshop 6-8/6/2012, R.Schmidt 1.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
Design process of the Interlock Systems Patrice Nouvel - CERN / Institut National Polytechnique de Toulouse CLIC Workshop Accelerator / Parameters.
The TV Beam Observation system - BTV
2007 IEEE Nuclear Science Symposium (NSS)
Dependability Requirements of the LBDS and their Design Implications
Setup beam intensities for FCC-hh
FAULT TOLERANCE TECHNIQUE USED IN SEAWOLF SUBMARINE
Estrella Vergara EN-ACE group 24th May 2017
1v0.
STPA FOR LINAC4 AVAILABILITY REQUIREMENTS
FCC hh dump kicker - switch topologies and impact on beam
Commissioning and Testing the LHC Beam Interlock System
0v1.
Initial Experience with the Machine Protection System for LHC
MPSC Procedures An update
The Fermi National Accelerator Laboratory is a U. S
Machine Protection Xu Hongliang.
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Interlocking of CNGS (and other high intensity beams) at the SPS
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
Machine Protection System Commissioning plans
1v1.
The LHC Beam Interlock System
Interlocking strategy
Operation of Target Safety System (TSS)
Mikael Olsson Control Engineer
Review of Quench Limits
Review of hardware commissioning
What systems request a beam dump? And when do we need them?
Close-out.
Presentation transcript:

LHC’s Modular Machine ITER – Machine ProtectionB. ToddJuly 2010 Thanks to : TE/MPE/MI, CERN Machine Protection Panel, et al 1v0 Protection System

CERN ITER – Machine Protection Background 2 Following CERN’s last visit to ITER… more reflection on CERN’s Machine Protection System Try to describe the implementation of CERN’s MPS using ITER terminology [11] TEVATRON = p+p- accelerator / collider in Fermilab, USA. LHC’s most comparable predecessor / competitor LHC is a game-changer Massive increase in energy, >> damage limits, no such equivalent leap in the formal way we should do machine protection. We’re making this leap as we go along. New technologies, new scales = new unknowns very difficult to appreciate. N.B. This is a work in progress.

CERN ITER – Machine Protection Protection Function x energy per magnet of TEVATRON magnet quenched = hours downtime many magnets quenched = days downtime (few spares) 100x energy of TEVATRON Emergency DischargeMagnet Energy Powering Protection: Beam DumpBeam Energy Beam Protection: magnet damaged = $1 million, months downtime many magnets damaged = many millions, many months downtime % of beam lost into a magnet = quench 0.005% beam lost into magnet = damage Failure in protection – complete loss of LHC is possible

CERN ITER – Machine Protection The basic guidelines… (1 of 2) 4 1. How similar is LHC to previous machines? How were other machines protected? What were the lessons learned? 2. How different is LHC from previous machines? Where could assumptions fail? 3.In what ways can we sense LHC beam energy going where it shouldn’t? We must protect against excessive energy impact… Simulations / analysis / dedicated tests etc. 4.In what ways can we predict that LHC beam energy will go where it shouldn’t? We must protect against un-necessary energy impact… Simulations / analysis / dedicated tests etc. …if significant energy loss is about to occur… …remove the energy safely before it does… [11] Beam == Magnet powering

CERN ITER – Machine Protection The basic guidelines… (2 of 2) 5 6. No bypassing of the system Formalise this Masking, disabling, transparency 7.Simple interlocks = fast, dependable, hardware < complexity < software at all levels 8. Complex interlocks = slower, less dependable, software 9. Machine protection weak links. Identify, mitigate or accept. 10. Machine Protection acknowledged by the organisation. drives hardware and beam commissioning to nominal. Pressure from above and below channeled through the Machine Protection Working Group (Panel) Even more significant since … Organisation accepts that 10% of LHC missions lost = FALSE TRIGGERING [11]

CERN ITER – Machine Protection Control System Principles 6 very clear boundaries: 1. Personnel and environmental protection = safety system this context: machine protection /= safety 2. Protect against damage = machine protection system Split into two sub-systems guarding against: * energy in the magnet powering 3. Operate = plant systems All built as a modular system – small, well defined, self contained sub-systems [11] Giving the following general modular approach * energy in the beam

CERN ITER – Machine Protection LHC Equipment and Control System 7 [11] Vacuum Pressure Vacuum Pump Speed Control Fulfill operational requirements Plant Systems: Vacuum Example: maintain correct pressure

CERN ITER – Machine Protection LHC Equipment and Control System 8 [11] Vacuum Pressure Vacuum Pump Speed Control Vacuum Pressure Vacuum Valve Actuator Ensure plant stays within limits Plant Protection: Fulfill operational requirements Plant Systems: Vacuum Example: maintain correct pressure bad pressure = close valves

CERN ITER – Machine Protection LHC Equipment and Control System 9 [11] Vacuum Pump Speed Control Vacuum Pressure Vacuum Valve Actuator Sensors, Actuators and Process may be combined No rules regarding combination Must meet functional requirement Ensure plant stays within limits Fulfill operational requirements Plant Systems:

CERN ITER – Machine Protection LHC Equipment and Control System 10 [11] Access doors Beam absorbers personnel safe but machine at risk People in perimeter – stop machine Personnel Safety System: cannot be merged with plants Must meet legal requirement

CERN ITER – Machine Protection LHC Equipment and Control System 11 [11] Prevent damage to machine Prevent undue stress to components Machine Protection System: No rules regarding implementation Must meet functional requirement

CERN ITER – Machine Protection LHC Equipment and Control System 12 [11] powering protection closely coupled to powering plant Prevent damage to machine Prevent undue stress to components Machine Protection System: No rules regarding implementation Must meet functional requirement

CERN ITER – Machine Protection LHC Equipment and Control System 13 [11] Personnel Safety System: Plant Systems: Machine Protection System: danger exists – extract energy danger will exist – extract energy

CERN ITER – Machine Protection LHC Equipment and Control System 14 [11] Personnel Safety System: Plant Systems: Machine Protection System: danger exists – extract energy danger will exist – extract energy Beam protection inputs from Safety system Plant systems Dedicated sensors

CERN ITER – Machine Protection LHC Equipment and Control System 15 [11] Personnel Safety System: Plant Systems: Machine Protection System: danger exists – extract energy danger will exist – extract energy Beam protection inputs from Safety system Plant systems Dedicated sensors milliseconds before risk exists seconds before risk exists < 1ms to shut machine down

CERN ITER – Machine Protection This means… 16 [11] No feedbacks between MPS and Plant Problem to Plant/Sensor to Interlock to Extraction BOOLEAN information expand beam protection…

CERN ITER – Machine Protection LHC Equipment and Control System 17 [11] Beam Related Machine Protection: Ignore Powering Protection complexity Quench Protection -> Cryogenics -> Converters -> Power Interlocks -> Discharge Circuits = powering protection

CERN ITER – Machine Protection LHC Equipment and Control System 18 [11]

CERN ITER – Machine Protection LHC Equipment and Control System 19 [11]

CERN ITER – Machine Protection LHC Equipment and Control System 20 [11] The safety system is independent! = The Access System

CERN ITER – Machine Protection LHC Equipment and Control System 21 [11] doors / patrol keys… also triggers the beam protection

CERN ITER – Machine Protection LHC Equipment and Control System 22 [11]

CERN ITER – Machine Protection LHC Equipment and Control System 23 [11]

CERN ITER – Machine Protection LHC Equipment and Control System 24 [11] powering protection trigger = remove beam energy before fields decay

CERN ITER – Machine Protection LHC Equipment and Control System 25 [11]

CERN ITER – Machine Protection LHC Equipment and Control System 26 [11] …by triggering the beam dump system through the beam interlock system…

CERN ITER – Machine Protection LHC Equipment and Control System 27 [11] beam dump can self trigger

CERN ITER – Machine Protection LHC Equipment and Control System 28 [11]

CERN ITER – Machine Protection LHC Equipment and Control System 29 [11] plant action which can put beam at risk = interlock

CERN ITER – Machine Protection LHC Equipment and Control System 30 [11]

CERN ITER – Machine Protection LHC Equipment and Control System 31 [11]

CERN ITER – Machine Protection LHC Equipment and Control System 32 [11] Can cause significant orbit shift Can get into beam path

CERN ITER – Machine Protection LHC Equipment and Control System 33 [11] Dedicated machine protection sensors look for danger & trigger beam abort

CERN ITER – Machine Protection LHC Equipment and Control System 34 [11]

CERN ITER – Machine Protection LHC Equipment and Control System 35 [11] All designed to see dangerous situations

CERN ITER – Machine Protection LHC Equipment and Control System 36 [11] Failure in a plant system leads to or can lead to danger = interlock Dedicated sensors for upcoming danger

CERN ITER – Machine Protection LHC Equipment and Control System 37 [11] But… Protection /= Safety so we have operational inputs to Machine Protection System

CERN ITER – Machine Protection LHC Equipment and Control System 38 [11] But… Protection /= Safety so we have operational inputs to Machine Protection System

CERN ITER – Machine Protection LHC Equipment and Control System 39 [11] BIS + Beam Dump = Boolean = Go / No Go Connected systems = Go / No Go No complex decision making by the BIS…

CERN ITER – Machine Protection LHC Equipment and Control System 40 [11] Set-up beam flag allows for sub-set of inputs to be masked…

CERN ITER – Machine Protection LHC Equipment and Control System 41 [11] Set-up beam flag allows for sub-set of inputs to be masked… Powering Interlocks & Beam Loss Monitors have UNMASKABLE and MASKABLE inputs = run with a predefined subset in operation.

CERN ITER – Machine Protection Post-Mortem 42 [11] beam dump not planned = analyse. PM request Through timing system

CERN ITER – Machine Protection Post-Mortem 43 [11] PM system = reasons for dump = 5-10 minutes Engineer in charge = accept or not Automated systems inhibit further operation if serious problems…. See Markus next

CERN ITER – Machine Protection How does this compare to ITER? 44 [11] Safety– prevent Tritium release Protection– protect the reactor Plant– protect the sub-systems The ITER Case:

CERN ITER – Machine Protection The Future – ITER 45 [11] Safety– prevent Tritium release Protection– protect the reactor Plant– protect the sub-systems The ITER Case:

CERN ITER – Machine Protection The Future – ITER 46 [11] Safety– prevent Tritium release Protection– protect the reactor Plant– protect the sub-systems The ITER Case:

CERN ITER – Machine Protection The Future – ITER 47 [11] Safety– prevent Tritium release Protection– protect the reactor Plant– protect the sub-systems The ITER Case: Machine protection can veto plant protection Shutdown in sequence Sacrifice one to save another Initial study:

CERN ITER – Machine Protection The Future – ITER 48 [11] Safety– prevent Tritium release Protection– protect the reactor Plant– protect the sub-systems The ITER Case: Machine protection can veto plant protection Shutdown in sequence Sacrifice one to save another Initial study: Or delay plant protection?

CERN ITER – Machine Protection Summary 49 [11] Machine protection system is a simple Go / No Go Plants and sensors all derive Go / No Go simple requirements for each sub-system requirements defined by studies, simulations, understanding interactions of systems Machine protection appreciated by the organisation 10% loss of availability driving commissioning All people working in machine protection = solid overview of accelerator basic principles Thinking process – “what effect does my system have on the LHC?” Have to be sure MPS worked, is working, and will work = PM system An open forum for coordination – Machine Protection Panel ITER looks similar! But not the same…

CERN ITER – Machine Protection A note: 50 [11] There are also two significant aspects which I have not talked about here. 1. Injection Protection Have assumed the disturbance of a circulating high-energy beam Must inject high-energy beam = different protection approach. 2.Protection Mode & Configuration Another system controls protection mode (set-up beam) Addresses conflicting configurations in transfer lines i.e. LHC beam protection /= CNGS beam protection Next time?