Measure Phase Automated Palm Pruner Presented by: Obie Abakporo Bill Carpenter William Craig Juan Antonio Rojas Christopher Xavier Smith Sarah Trayner.

Slides:



Advertisements
Similar presentations
Jack in a Box Senior Design Group # 10 John Juckiewicz Mike Zulauf Advisor: Professor Chung.
Advertisements

Section Red A Mock-up Review 10/20/05 Banana Grabber.
Fifth Wheel Test Machine Project Concept Evaluation Group members: Jonathan Eckart Wayne Farley Rob Grace Chris Bozarth Academic advisor: Dr. Faryar Etesami.
Ken YoussefiMechanical Engr. Dept., UC Berkeley 1 Product Specifications.
Machine Elements in Mechanical Design. Introduction Mechanical Systems or Devices are designed to transmit power and accomplish specific patterns of motion.
DTE Seminar Constant Contact Side Bearings Paul Aspengren.
Beam Loading Example To determine the reaction forces acting at each support, we must determine the moments (represented as torques). Static Equilibrium:
Designing an Air-Propulsion System Presentation by – Jacob Griffin Advisor -Dr. Junkun Ma Senior Design Teacher -Dr. Cris Koutsougeras.
SEMI AUTONOMOUS PALM PRUNER Analyze Phase Presented by Group 26: Obie Abakporo Bill Carpenter William Craig Juan Antonio Rojas Christopher Xavier Smith.
Moving Armor Target (MAT) Track Jacob Feist Cleon Stanley Thomas Hutton Sladana Lazic 03/30/2006.
Verify Phase Semi Autonomous Palm Pruner Presented by Group 26: Obie Abakporo Bill Carpenter William Craig Juan Antonio Rojas Christopher Xavier Smith.
Team Members Industry Contact Academic Advisor Dr. Faryar Etesami.
A Sled System for Motor Vehicle Crash Simulation and Forensic Biomechanics Group Members: Joshua Booren Travis Deason Steve Savas Max Brunhart Customer:
University of the Pacific1 PFADS Project Team P.O.C. Gavin Saito Miguel Perez Michael Bruch December 5, 2002 University of the Pacific Introduction to.
PIT Crew Design Concepts By Dan Chapman, Tim Wilson, and Jon Miller December 11, 2002.
1 Design Group 2 Kat Donovan - Team Leader Andrew DeBerry Mike Kinder John Mack Jeff Newcamp Andrew Prisbell Nick Schumacher Conceptual Design for AME.
Material Requirements Planning (MRP)
PASCOR Group Industry Advisor: Craig Smit Academic Advisor: Dr. Chien Wern Group Members: Jeremie Bilisari Steve Greene Joe Hartley Robby Hoff Matt Smith.
Robotic Football Group E1 CDR Team Top Gun April 22 nd, 2008.
Towards Autonomous Jumping Microrobots
Motor Coupling Design Review The 2004 Idaho Future Truck needs a system to couple the AC induction motor to the power train. + = Motor Future Truck Happy.
Team JADS 1 The PFADS Competition Team JADS Sean McNary John Yoshimura ENGR 5 - Lab 5.
Team JADS1 The PFADS Competition Team JADS David Rosenberry Adam Yee ENGR 5 - Lab 5.
Semi-Autonomous Palm Pruner By Department of Industrial Engineering: Bill Carpenter Juan Rojas Sarah Trayner & Department of Mechanical Engineering: Obie.
3.1.5 Structural Efficiency
Shell Eco-Marathon FAMU-FSU 2014 Solar Car Milestone #2 Presentation Team #2.
FABRICATION OF SPRING WINDING MACHINE
Power System for the Better Water Maker P ● Background ○ Problem Statement and Project Plan ○ Customer Needs and Engineering Requirements ○ Constraints.
INTEGRATING EHS INTO NEW PRODUCT DEVELOPMENT
RoboVac a UTC Corp. Power Generation Engineer Juan Gamarra
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
Project 2 BY: TIM OLSON, HUNTER SULOVSKI, SAJAD AL ALI, BRENNAN KERWIN, CHARU PANKAJ.
Introduction to SDLC: System Development Life Cycle Dr. Dania Bilal IS 582 Spring 2009.
Decision Making Matrix
Contact : Stephen Gass Advisor :Faryar Etesami Team Members : James Boag Jerry Boyum Cory Nardin Roger Smith.
Basic Utility Vehicle (BUV) ME 462 Capstone Design Presentation Department of Mechanical Engineering, IUPUI December 14, 2005 Presented by: Tom Peters.
Group 26 – Palm Harvester Members: Obie Abakporo Bill Carpenter William Craig Juan Antonio Rojas Christopher Xavier Smith Sarah Trayner.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
1 CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) EXAM Nov 26, 20119:00-12:00 Dec 3, :00-12:00 SEB1015 NOTES We’ll take registrations in November but you’ll.
Team 4: wheels on anything Team 4: wheels on anything In regards to sustainability and economic feasibility our design meets the necessary standards required.
SAND SAMPLING APPARATUS Eglin Air Force Base Gina Teofilak Richard Klimas Dan Mortensen Ruben De Sousa.
DESIGN 1 DPT224 TOPIC 2: ENGINEERING DESIGN PROCESS.
CS532 TERM PAPER MEASUREMENT IN SOFTWARE ENGINEERING NAVEEN KUMAR SOMA.
Senior Design Review Andrew Beasten Greg Feather Alex Phillips Brendan Moran Wegman’s Bread Tray Lift Assist.
Junior Design Project Jesse Boudart.  Purpose American Society of Mechanical Engineers (ASME) Design Competition  Clean most amount of dirt (Dots) 
Analyze Phase SENIOR DESIGN TEAM 25: PALM HARVESTER.
1. 2 Quiz Preparation l Have Quiz sheet ready. l Top Center: QUIZ 2 l Upper Right: »Name (L, F, MI), »Today’s date 8/28/12 »Lab day, time »section number.
Garage Door System Design and Analysis Lee Huffines Philippe Huovinen
Tata McGraw CHAPTER 4 Product and Service Design.
Decision Making Matrix A Closer Look at Preliminary Ideas.
CSCI 6461 Final Review Spring Chapters/Topics Covered Ch 7 From Modules to Objects Ch 10 Requirements Workflow Ch 11 Analysis Workflow Ch 12 Design.
January 16, 2009Senior Design I - System Level Design Review System Level Design Review Senior Design I Low Energy Printing Project P09505.
DESIGN AND FABRICATION OF SPRING LOADED FAN
ME 4182 Mid-Term Presentation The Likus Group 6/21/00 Philip Reale, Group Leader Matt Berrell Justin Disney Anthony Godfrey Gwyneth Smith Lisa Smith The.
Green Technologies & Energy Efficiency April 26, 2017
FINAL PRESENTATION UNIVERSITY OF CINCINNATI
The Four-legged Water Walker
Robot Soccer First Design Review
Final Year Project Presentation
MRP and ERP.
Tree Limbing and Harvesting ROV
Guide to Selling: Vertical Grinder
ME 481 Engineering Modeling
Team Members: Sagar Sheth Leonardo Silva Stephen Bennice
SENIOR DESIGN PROJECT P08455
Human Powered Vehicle (HPV)
Work.
MARBLE MAYHEM Engineers R Us (S17 F-03)
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Measure Phase Automated Palm Pruner Presented by: Obie Abakporo Bill Carpenter William Craig Juan Antonio Rojas Christopher Xavier Smith Sarah Trayner December 8, 2011

Introduction The Palm Pruning project is based on providing an efficient, economical, and effective means of harvesting fruit from oil palms Review of Define Phase ◦ Customer requirements ◦ Research ◦ Concept generation Comparison of concept ideas ◦ Positives ◦ Negatives Concept Selection

House of Quality

Concept 1 – King Climber Components Frame Actuators Guiding Rails Cutting Track

Engineering Analysis - King Climber

Engineering Analysis King - Climber

Concept 2 – Rolling Thunder Components Circular Frame Legs Wheels Motors Springs

Engineering Analysis - Rolling Thunder MaterialWeight (lbs) Frame7 Wheels18 Motors2 Pay Load25 Springs5 Total57 Raw Material Lengths (Al 6061) Length (inches) Circle Track89.54 Struts (x3)24 Legs (x3)48 Total needed:161.5

Engineering Analysis - Rolling Thunder

Metrics Major measurements for each design ◦ Cost ◦ Power ◦ Weight ◦ Force ◦ Speed King Climber $ Watts lbs lbs.075 ft per sec Rolling Thunder $ Watts 107 lbs 24 ft-lbs 1 ft per sec

Design Selection Methods ◦ Quantitative ◦ Qualitative ◦ Ranking Tools ◦ Venn Diagram ◦ Traditional Selection Matrix ◦ Pugh Diagram

Venn Diagram Venn Diagram

Traditional Selection Matrix This matrix provides a basic understanding of each design and identifies which is the most suitable in layman’s terms.

Pugh Selection Method Pugh Matrix Matrix Key

Final Selection KING CLIMBER WINS! ◦ More stable ◦ Best user safety ◦ More effective ◦ Less complex

Conclusion King Climber is the better choice ◦ Used engineering analysis ◦ Selection tools Ordered parts Begin fabrication and assembly

Questions Questions Enjoy your break!!