 Risk Analysis & Management in Student- Centered Spacecraft Development Projects Jeremy Straub 1, Ronald Fevig 2, James Casler 2, Om Yadav 3 1 Department.

Slides:



Advertisements
Similar presentations
Program Management Office (PMO) Design
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
Succession and talent management
PROJECT RISK MANAGEMENT
Note: Lists provided by the Conference Board of Canada
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
A Systemic Approach February, Two important changes in the Perkins Act of 2006 A requirement for the establishment of Programs of Study A new approach.
Systems Analysis and Design 9th Edition
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
Supporting people with a learning disability Introduction to Project Management Presenter: Steve Raw FInstLM, FCMI.
CEVP ® Cost Estimate Validation Process TEA Conference 2004 Jay Drye, P.E. Assistant State Design Engineer Monica Bielenberg, P.E. CREM Program Manager.
CS 325: Software Engineering April 7, 2015 Software Configuration Management Task Scheduling & Prioritization Reporting Project Progress Configuration.
1 Positive Learning Outcomes Through Problem-Based Learning Willie Yip Department of Computing.
Projmgmt-1/33 DePaul University Project Management I - Risk Management Instructor: David A. Lash.
Overview Lesson 10,11 - Software Quality Assurance
INSTRUCTIONAL LEADERSHIP FOR DIVERSE LEARNERS Susan Brody Hasazi Katharine S. Furney National Institute of Leadership, Disability, and Students Placed.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Bureau of Workers’ Comp PA Training for Health & Safety (PATHS)
8 Managing Risk Teaching Strategies
Assessing Students Ability to Communicate Effectively— Findings from the College of Technology & Computer Science College of Technology and Computer Science.
1 M&S Teachers Seminar: Project Management Presented by: Paul E. Paquette September 26, 2013.
PRESENTED BY TRUST THOMAS EROMOSELE STUDENT NO:
Y. Rong June 2008 Modified in Feb  Industrial leaders  Initiation of a project (any project)  Innovative way to do: NABC ◦ Need analysis ◦ Approach.
Charting a course PROCESS.
Abdulmotaleb El Saddik Prof. Dr.-Ing., FIEEE, FCAE University Research Chair ELG 4913F ELG 4913F Electrical Engineering Design Project II
What should teachers do in order to maximize learning outcomes for their students?
Striving for Quality Using continuous improvement strategies to increase program quality, implementation fidelity and durability Steve Goodman Director.
Software Testing Lifecycle Practice
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
HIT241 - RISK MANAGEMENT Introduction
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
Why do we … Life cycle processes … simplified !!!.
1 TenStep Project Management Process ™ PM00.7 PM00.7 Project Management Preparation for Success * Manage Risk *
The Challenge We must realize that the system is the cause of weak execution due to lack of clarity, commitment, collaboration and accountability resulting.
Chapter 12 Project Risk Management
Chapter 7 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 7-1 Risk Management.
EE & CSE Program Educational Objectives Review EECS Industrial Advisory Board Meeting May 1 st, 2009 by G. Serpen, PhD Sources ABET website: abet.org Gloria.
Copyright 2012 Delmar, a part of Cengage Learning. All Rights Reserved. Chapter 9 Improving Quality in Health Care Organizations.
JOB EVALUATION MAGNETIC CONTACTORS.
<Contract # or Subproject Name> IBR In-brief
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Lecture 4. IS Planning & Acquisition To be covered: To be covered: – IS planning and its importance Cost-benefit analysis Cost-benefit analysis Funding.
Performance Consulting EDER Instructor: Tony Roithmayr Introducing Blended Learning into Higher Education Rosalie Pedersen, Kenneth Kim, Elaine.
Introducing Project Management Update December 2011.
SOFTWARE PROJECT MANAGEMENT
 The Multi-Tier Mission Architecture and a Different Approach to Entry, Descent and Landing Jeremy Straub Department of Computer Science University of.
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
Project Risk Management Planning Stage
Succession Planning Based loosely on “Effective Succession Planning in the Public Sector,” 2007, Watson Wyatt Worldwide Based loosely on “Effective Succession.
Technology Commercialization Technology Commercialization, 2011 Sanjay Dhole, Technology Programs Coordinator Maricopa SBDC.
University of Sunderland CIFM02 Unit 5 COMM02 Project Hazard Management and Contingency Planning Unit 5.
Project Management Why do projects fail? Technical Reasons
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
Ch7: Project Monitoring and Control  To reduce differences between plan and actual in the 3D space of T/C/P.  Best utilization of organization’s primary.
Continual Service Improvement Methods & Techniques.
CAREER PATHWAYS THE NEW WAY OF DOING BUSINESS. Agenda for our Discussion Today we’ll discuss: Career Pathways Systems and Programs Where we’ve been and.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Project Lead The Way Forging New Generations of Engineers.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Selection Criteria and Invitational Priorities School Leadership Program U.S. Department of Education 2005.
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
Analyze Wrap Up and Action Items
Successfully Implementing Your Student Success Plans

Solanco High School STEP Academy
Engineering Project Project Management Project Management.
Introduction to Projects
A New Concept for Laboratory Quality Management Systems
Presentation transcript:

 Risk Analysis & Management in Student- Centered Spacecraft Development Projects Jeremy Straub 1, Ronald Fevig 2, James Casler 2, Om Yadav 3 1 Department of Computer Science, University of North Dakota 2 Department of Space Studies, University of North Dakota 3 Industrial and Manufacturing Engineering Department, North Dakota State University 1

Introduction  Student involvement in small spacecraft development projects:  Provides benefit to the student team members and the project  Introduces significant project risks  Students:  Gain valuable hands-on experience  Demonstrable evidence of their capabilities  The project:  Benefits from having access to intelligent, motivated resources  Benefits from low cost of resources 2

Introduction (cont.)  Risks include:  Low-notice-time turnover  Inexperience  Scheduling  Availability difficulties  Difficulty retaining project knowledge  Risks are:  Not the same as in commercial settings  Not well covered by the literature 3

Background  Every project has risk factors  The majority of the literature regarding student project participation focuses on benefits students and faculty  Intervening factors that may impair attaining these benefits are not well-examined  Student participation in research is generally believed to be beneficial 4

Background (cont.)  Students benefit from confidence, skills and preparation for future studies / workforce entry  Participation benefit increases with prolonged participation  Risk factor actualization can impair long-term student participation  Increases student retention  Helps achieve faculty-member research goals 5

Technical, Schedule & Standard Risks Technical:  Construction  Standards-based quality cost-prohibitive to implement  Students may be poorly equipped to detect / evaluate errors  Component  Due to production failures or shipping damage  Inexperience can cause acceptance test / latent issues detection problems  Integration  Assembly design problems  Implementation (physical assembly) issues 6

Technical, Schedule & Standard Risks (cont.) Schedule:  Estimation  Inexperience may result in overly positive or overly negative estimates  Both are problematic: overruns or next stage not ready to start  Critical Path  Path of tasks that takes the longest in sequence  Any of these tasks (or others that expand to become a critical path member) that overruns causes schedule issue  Failure (inexperience) to identify precursor / successor tasks can cause  Schedule Creep  Schedule component of scope creek  From accepting changes without updating schedule 7

Technical, Schedule & Standard Risks (cont.) Cost:  Estimation  Inexperience can cause over or under estimation  Cost Creep  Cost component of scope creek  Damage & Rework  Broken items being produced or equipment  Due to inexperience or failure to appreciate results of actions  Buying schedule Compression 8

Student Worker Involvement Risks  Scheduled Turnover  Has a dramatic impact, but can be planned for  Attributable to students only participating in a given effort for a period of time  Fix with:  Knowledge distribution  Stressing documentation throughout a project’s lifecycle  Validating the usefulness of documentation 9

Student Worker Involvement Risks (cont.)  Unscheduled Turnover  Risk factor is present in all types of organizations  In academic environment, augmented by :  Changing student interests (e.g., major)  Student interest in other opportunities  Academically-attributable issues  Diminished level of personal commitment  Mitigation similar to scheduled turnover 10

Student Worker Involvement Risks (cont.)  Miss-commitment  Particularly problematic because the individual is still present and ostensibly working on their assigned tasks  Due to conflicting demands for limited time resources the student worker may not have time to make the requisite level of project progress  Compounded by work styles & belief that everything can be ‘made up’ at the last moment.  Project leaders may not be aware of the issue until deadline is missed  Mitigate by:  Define tasks to have demonstrable milestones  Create an environment where challenges are reported  Involve multiple individuals in key tasks 11

Student Worker Involvement Risks (cont.)  Inexperience  Students lack practical experience  Misestimating  Lack of experience in problem resolution techniques  Mitigated by training students in the desired behaviors  Mitigation benefits the project and prepares the students for workplace entry 12

Analyzing Student Project Risk Four-step process:  Conventional risk elements are identified  Impact of student involvement on these risks is identified  Student-project-specific risks are identified  The impact of risk mitigation efforts is included Mitigation Efforts Likelihood of Project Success Impact of Student Involvement Student Project- Specific Risk Elements Conventional Risk Elements 13

Analyzing Student Project Risk (cont.)  Results in a complete understanding of the project’s risk  The model is quite simple  Its use is difficult as a practical matter:  Assessors may fail to identify some risks  Risks may be mis-quantified  Insufficient information may exist to quantify the risks  Student performance of risk analysis for the project introduces the potential for additional issues, due to potential inexperience. 14

SQUIRM Risk Model  Combines:  probabilistic assessment of risks inherent to project design  Student Qualitative Undertaking Involvement Risk Model (SQUIRM) based assessment of the risks associated with the utilization of student workers /  Creates a combined risk identification document  Document can be utilized to:  Plan mitigation strategies  Assess the suitability for student involvement  Assess the need for additional oversight where high levels of project risk would be compounded by student involvement Mitigation Efforts Likelihood of Project Success Impact of Student Involvement Student Project- Specific Risk Elements Conventional Risk Elements 15

SQUIRM Success Tree 16

SQUIRM Risk Model SQUIRM is presented as a qualitative risk model, because:  Insufficient data exists at present to accurately model the impact of involving student workers in a research project  For most projects, implementing basic risk-aware management techniques will maximize the cost-benefit equation  If sufficient data is collected for a given area of focus, worker classification and task set, model can be applied quantitatively. 17

Managing Student-Induced Risk  Standard risk mitigation and management approaches should be utilized:  Create systems that will avoid and detect risk occurrence  Create mitigation and response plans for all risks identified and assigned a medium or higher severity level  When designing / applying risk management techniques, student involvement should be considered:  The impact of student involvement on the success or failure of the risk management approach should be considered  The opportunity for student learning from the risk management activities should be considered 18

Managing Student-Induced Risk (cont.)  Risk mitigation and management techniques for student-centric risks should be employed:  Offer training regarding workplace conduct expectations, workplace safety and technical aspects of the project  Validate assumptions about student experience  Students may fail to realize or be unwilling to vocalize problem  Knowledge, skill or experience gap.  Manage transitory nature of student-project participants:  Assign deputies to any key position  Ensuring that project knowledge is documented in a known and accessible location. 19

Conclusions  If a project doesn’t carry this risk, than its success is likely not a significant accomplishment  Student involvement in a project increases the likelihood and impact of standard-category risks and introduces risk elements that are unique to projects that feature student involvement  While giving it the “good college try” may be sufficient for students to earn passing (even ‘A’-level) grades, this is generally not an acceptable outcome to project faculty members or sponsors who require completion to perform testing and analysis and to publish the research 20

Conclusions (cont.)  Student involvement in research activities is becoming an ever-more- integral part of the U.S. collegiate experience  This involvement may peak student interest in pursuing advanced degrees and/or serves to prepare students to analytically solve problems that they will be presented with upon entering the workforce  Student research participation must benefit the student participant, the faculty mentor, and others involved with the research  Proper management, which considers both standard and student- involvement-specific risk factors, of student research projects will not guarantee success. It does, however, its probability 21

Thanks for Your Attention & Any Questions Small spacecraft development at the University of North Dakota is supported by the North Dakota Space Grant Consortium, the UND Faculty Research Seed Money Committee, North Dakota NASA EPSCoR and the National Aeronautics and Space Administration. 22