IF/RF 팀 추진현황 5 월 23 일, 2013 년, 충북제천 김종원. Conceptual Layout of the Accelerator Complex RF system: Solid state amplifier for sc-cavities LLRF (low level.

Slides:



Advertisements
Similar presentations
Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Advertisements

Superconducting Ion Source Development in Berkeley
The Rare RI Ring Facility at RIKEN RI Beam Factory M. Wakasugi, and Rare RI Ring Collaborators RIKEN, Nishina Center, Japan ARIS2014.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
Superconducting Spoke Resonator Cavities and Cryomodules
Interaction region design and construction for BEPCII C. H. Yu IHEP Feb.4, 2007.
Pion capture and transport system for PRISM M. Yoshida Osaka Univ. 2005/8/28 NuFACT06 at UCI.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
Simulations in support of RIA Target Area R&D Reg Ronningen NSCL/MSU Igor Remec ORNL 2 nd High-Power Targetry Workshop October 10–14, 2005 Oak Ridge, TN.
Review of CIEMAT contributions to linear accelerators L. García-Tabarés, F. ToralCIEMAT, 7/9/2006.
Magnet designs for Super-FRS and CR
December 2007ESF-Workshop, Athens, Greece University of Jyväskylä, Department of Physics ECR ion source for the highly charged, intensive ion beams H.
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
SHMS Optics Studies Tanja Horn JLab JLab Hall C meeting 18 January 2008.
Permanent Magnet Quadrupoles for the CLIC Drive Beam Jim Clarke, Norbert Collomb, Neil Marks, James Richmond, and Ben Shepherd STFC Daresbury Laboratory,
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
ICIS2015 in NY Y.HIGURASHI Y. Higurashi (RIKEN Nishina center) 1.Introduction RIKEN RIBF and RIKEN 28GHz SC-ECRIS 2.Emittance measurements 1.4D.
1 Tim Michalski October 6, 2015 Engineering Issues in MEIC.
Thursday Summary of Working Group I Initial questions I: LHC LUMI 2005; ; ArcidossoOliver Brüning 1.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Beam line Experiment area SC magnet Pion production target
PHYSICAL PROJECT OF BOOSTER FOR NICA ACCELERATOR COMPLEX Alexey Tuzikov, Nikolay Agapov, Andrey Butenko, Alexey Eliseev, Viktor Karpinsky, Hamlet Khodzhibagiyan,
Radioactive Ion Beams CW 0.5 MW (for protons) 1 GeV (for protons) p to U Chiara, Manuel, Adam, HuiMay 2011, CAS, Bilbao.
Optimized CESR-c Wiggler Design Mark Palmer, Jeremy Urban, Gerry Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
XFEL X-Ray Free-Electron Laser Bernward Krause MEA WP-12: Warm Magnets WPL: B. Krause.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
Detector / Interaction Region Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski Joint CASA/Accelerator and Nuclear Physics MEIC/ELIC Meeting.
Cyclone 70 IBA Radiopharma’s high energy, high current cyclotron.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
Superferric quadrupoles and multipoles at the NSCL Al Zeller NSCL/MSU.
RF System and EBIS of RAON
RAON LEBT Design Yonghwan Kim Institute for Basic Science Yonghwan Kim Institute for Basic Science.
ISOL cyclotron for the RISP
Superconducting Magnet, SCRF and Cryogenics Activities at VECC *, Kolkata Shekhar Mishra Rakesh Bhandari *Department of Atomic Energy, Government of India.
beam delivery with SC magnets
Ion Accelerator Activities at VECC
SAMURAI magnet Hiromi SATO SAMURAI Team, RIKEN Requirements Geometry Magnetic field Superconducting coil and cooling system Present status of construction.
HTS and LTS Magnet Design and Prototyping for RAON
Prototyping of Superconducting Magnets for RAON ECR IS S. J. Choi Institute for Basic Science S. J. Choi Institute for Basic Science.
The Super-FRS Multiplet, Magnetic and Cryogenic requirements
CERN, 11th November 2011 Hi-lumi meeting
Overview of the RISP SCL
Interaction Region and Detector
Warm magnets for LHeC / Test Facility arcs
IF Separator Design of RAON
Large Booster and Collider Ring
Yingshun Zhu Accelerator Center, Magnet Group
EffiCAS Efficient Facility for Ions at CAS
HIE-LINAC status report
The design of interaction region
LHC (SSC) Byung Yunn CASA.
Pulsed Ion Linac for EIC
Collider Ring Optics & Related Issues
Advanced Research Electron Accelerator Laboratory
Cooler e-source Magnetized Beam LDRD Progress Report
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
CEPC Final Focus Superconducting Quadrupole and Anti-solenoid Magnets
Ion Collider Ring Using Superferric Magnets
JLEIC Magnet R&D Tim Michalski NP Community Panel Review of the EIC
Cooler e-source Magnetized Beam LDRD Progress Report
Presentation transcript:

IF/RF 팀 추진현황 5 월 23 일, 2013 년, 충북제천 김종원

Conceptual Layout of the Accelerator Complex RF system: Solid state amplifier for sc-cavities LLRF (low level rf ) control system 150 kW rf amp system for RFQ

1.Beam optics: 윤종철, 김장열, W. Wan (LBL), 선용근 ( 경북대 ) Radiation transport, heating, shielding: 김미정, 김은희, 위탁과제 2. Magnet: 김도균, Aziz Zaghloul Target: 홍성광, 김재홍, 송정석 Beam dump: 김장열 3.Detector: 김명진, 김미정, 김은희 4.Cyclotron: 김재홍, 홍성광, 최연경 ( 동국대 ) 5.RF: 한재은, 최오룡, 도희진, 신일경 (7 월 예정 ) 6. EBIS: 한재은, 김성준, 윤종철 인력구성

Layout of the In-flight Fragment Separator Local shielding & remote handling in pre- separator area

A current configuration of the fragment separator and the beam delivery line Separator Configuration 1. Pre-separator S-shape, 4 dipoles 2. Main-separator C-shape, 4 dipoles

IF 분리장치 주요 부분품 개발계획 1. High-power target - high-power e-beam tests underway - design of multi-layer target (ANSYS) - considering multi-layer target at BIPP in Rissia 2. In-flight fragment separator magnets - conventional (or superferric) dipole magnet - superconducting superferric quadrupole magnet - HTC coil dipole and quadrupole magnet (warm iron) 3. Beam dump - thermo-mechanical analysis and mechanical design - considering water cooling loop design 4. Beam measurement devices - attending beam tuning of BigRIPS at RIKEN - development of some detectors underway

Magnet types in the separator Pre-separator HTC coil quadrupoles HTC coil dipole 3 conventional or supeferric dipoles (radiation resistive) 3 superferric quadrupole triplet 4 conventional or superferric dipoles Main separator 8 superferric quadrupole triplet

Beam dump Momentum acceptance: ± 4.3 % Angular acceptance: ± 30 mrad GICOSY calculation for pre- separator 분리장치 빔 광학 계산 Separation of isotope using wedge degrader Energy degrader 포함 몬테카를로 계산

PartHeat load, 4K Shield radiation1.55W Support link0.14 W He port (vent)0.9 W HTc current lead0.36 W Total2.95 W Heat load estimation Schematic diagram of the Q-pole magnet triplet 초전도 전자석 개발

초전도 4 극 전자석 최적화 설계

HTS 코일사용 초전도전자석 Cooling by He gas of 30~40K. ParametersValue Pole tip radius120 mm Yoke outer radius350 mm Yoke length500 mm HTS wire size12*0.1 mm 2 Max field gradient~15 T/m ParametersValue Bend angle30 deg Bend radius6 m6 m Pole gap150 mm HTS wire size12*0.1 mm 2 Maximum field~1.7 T

타겟 시스템 개발 Comparison of measured temperature using IR camera to the simulation results using ANSYS. E-beam test up to E= 50 keV, I max = 10 mA

Design study of multi-slice graphite target Multi-layer slice target Radiation Cooling Effects reduced much!!! With Radiation cooling effects Without Radiation cooling effects T max = 1787 o T max = 1394 o

U Sn Design of a beam dump and separation of 132,100 Sn beam from the primary beam at the beam dump Primary beam: 112 Sn, 200 MeV, 400 kW 100 Sn Primary beam: 238 U, 200 MeV, 400 kW Horizontal plane Isotope Beam Rotating water drum

빔 덤프 설계연구 빔 광학계산 ( 여러 종류 primary beam 포함 ) Radiation transport Thermo-mechanical analysis for beam dump 400 kW 냉각수 시스템

Radiation transport, heating, activation calculation Activity of the beam dump as function of waiting times. Radiation heating calculation

Arrangement of beam measurement devices Position: PPAC  E: Si, Ion chamber TOF: Plastic E: NaI

진공챙버제작 Pre-amp is ready. PPAC test will begin soon. PPAC 테스트진행 IC (Ionization chamber) 개발계획 Wire winding machine will be assembled. Plan to assemble a unit this year 검출기 개발

Sumitomo Heavy Industry, Japan IBA, C70 ARRONAX cyclotron Commercial proton cyclotron for ISOL driver Domestic capability  A 30-MeV, H - cyclotron has been constructed.  Manpower for R&D on the 70 MeV cyclotron is not sufficient.  Submitted a plan for 70 MeV, 1 mA, H -

Specifications of Commercial Cyclotrons

Specifications of Commercial Cyclotrons - continue

사이클로트론 빔 입사 및 빔 전달 라인 설계

Solid state amplifier system for QWR Frequency Power level2 kW stabilityAmplitude Phase 2 kW on spectrum analyzer 00 W ) 10 1 MB 36 SSB036 (Drive & 4-way Combine) 5 kW on spectrum analyzer

A scheme of RF amp system for RFQ A schematic layout of the RF system for the RFQ. 15 kW  150 kW 초전도 공명체 LLRF 시스템 Block diagram of the LLRF system 국내업체 개발  미국 JLAB 테스트 예정

EBIS 설계 Superconducting Solenoid Drift Tube Electron Collector Bucking coil Electron-Gun 전자 빔 광학  전자총 구매 / 테스트 4 월 : EBIS review 5 월 : 전자 빔 광학계산 월 : Expert review(?)

YearMagnetsDetector Remote handling & control 2013 Prototype magnet HTS Prototype coil Design and prototype study Remote control & handling system design 2014 Sc-quadrupole magnet cryostat test Hi-Tc coil package Detector performance test 2015Full coil test Specs. ready for b eam devices 2016 Fabrication of Sc-magnets Fabrication of H TS magnets 2017 Beam devices ready for installation System ready for installation Time plan for IF separator 사이클로트론 2013: 구매준비 : 제작 : 설치, 시운전 RF 시스템 2013: SSPA: sc-cavity LLRF: with JLAB RFQ: 15kW 2014: RFQ: 150 kW EBIS 2013: 빔 광학설계 E-gun, 부품 구매 2014: 부분품 제작