28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Louis Rinolfi CLIC e + status.

Slides:



Advertisements
Similar presentations
A Capture Section Design for the CLIC Positron Source A. VIVOLI* Thanks to: L. RINOLFI (CERN) R. CHEHAB (IPNL & LAL / IN2P3-CNRS) O. DADOUN, P. LEPERCQ,
Advertisements

Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
Overview of 300 Hz Conventional e + Source for ILC Truly Conventional Collaboration ANL, IHEP, Hiroshima U, U of Tokyo, KEK, DESY, U of Hamburg NIM A672.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
1 st October 2008 Réunion sur la contribution exceptionnelle de la FrancePositron generation L. Rinolfi (CERN) Contribution exceptionnelle de la France.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
Introduction Simulation Results Conclusion Hybrid Source Studies Olivier Dadoun A. Variola, F. Poirier, I. Chaikovska,
16 th June 2008 POSIPOL 2008L. Rinolfi / CERN CLIC e + sources status L. Rinolfi with contributions from F. Antoniou, H. Braun, A. Latina, Y. Papaphilippou,
R.Chehab/Posipol2008/Hiroshima, june POSITRON SOURCES USING CHANNELING FOR ILC & CLIC R.Chehab, X.Artru, M.Chevallier, IPNL/IN2P3/CNRS, Universite.
Simulation of Positron Production and Capturing. W. Gai, W. Liu, H. Wang and K. Kim Working with SLAC & DESY.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
2015/10/261 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima:
CLIC RF manipulation for positron at CLIC Scenarios studies on hybrid source Freddy Poirier 12/08/2010.
Issues for e+ stacking in the rings Frank Zimmermann IWLC2010, CICG, Geneva, 21 October 2010 thanks to Fanouria Antoniou, Eugene Bulyak, Peter Gladkikh,
15 th October CLIC workshop The CLIC/ILC common issues for the sources Jim Clarke and Louis Rinolfi.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
ParameterL-bandS-bandX-band Length (m) Aperture 2a (mm) Gradient (Unloaded/Loaded) (MV/m)17/1328/2250/40 Power/structure (MW) Beam.
2nd ECFA LHeC Workshop; 1-3 September 2009, Divonne L. Rinolfi Possible e - and e + sources for LHeC 1 Thanks to O. Brüning, A. Vivoli and F. Zimmermann.
A.Variola LCWS Bejing ERL Compton Scheme Status of the Orsay activity.
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
23 th July 2010 CLIC meeting L. Rinolfi POSIPOL workshop 2010 L. Rinolfi A brief overview.
Status of the CLIC main beam injectors LCWS, Arlington, Texas, October 22 th -26 th, 2012Steffen Döbert, BE-RF Overview of the CLIC main beam injectors.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
17 th November2008 ILC 08 workshopL. Rinolfi CLIC e - and e + sources and ILC/CLIC common studies L. Rinolfi On behalf of the ILC/CLIC e + working group.
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
Capture and Transport Simulations of Positrons in a Compton Scheme Positron Source A. VIVOLI*, A. VARIOLA (LAL / IN2P3-CNRS), R. CHEHAB (IPNL & LAL / IN2P3-CNRS)
27 th May 2009 CLIC ACE meetingL. Rinolfi CLIC Main Beam generation Baseline configuration only L. Rinolfi for the CLIC Injector complex team.
Positron Sources for Linear Colliders* Wei Gai JPOS 2009, Jefferson Lab, March 26, 2009 * Acknowledgement of contributions from the ILC and CLIC e+ collaborations.
T.Takahashi Hiroshima /11/5 Tohru Takahashi Hiroshima University 高橋 徹 広島大学.
CERN 14 October 08 Injectors and Damping Rings working group S. Guiducci, L. Rinolfi CLIC08 Workshop.
POSIPOL Berlin ILC/CLIC e + generation working group Wei Gai, ANL Louis Rinolfi, CERN Thanks to Omori-san for the coordination of the Webex meetings.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
Positron capture simulation for 300Hz electrondriven scheme M. Kuriki, Y. Seimiya, T. Takahashi (Hiroshima U.) T. Okugi, M. Sato, J. Urakawa, T. Omori.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Summary of the workshop on polarized positron source based on Compton back scattering L. Rinolfi CERN POSIPOL Workshop CERN April 2006 POSITONS.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Page 1 Polarized Electron Sources for Linear Colliders October, 2010 A. Brachmann, J. C. Sheppard, F. Zhou SLAC SLAC October 18-22, 2010.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
A_RD_6: Study and optimization of the power deposition density in new positron targets Masanori Satoh (Accelerator Laboratory, KEK) On behalf of collaborators:
Positron Source for Linear Collider Wanming Liu 2013 DOE Review.
GDE FRANCE Why High brillance gun is good for the ERL scheme? And SC GUN? Alessandro Variola For the L.A.L. Orsay group.
Injection System Update S. Guiducci (LNF) XVII SuperB Workshop La Biodola, Isola d'Elba, May 29 th 5/29/111.
R.Chehab/FCPPL2010/Lyon1 AN HYBRID POSITRON SOURCE FOR ILC -Collaboration IN2P3-IHEP, with BINP, KEK, Hiroshima-U, CERN- X.Artru, R.Chehab, M.Chevallier.
Spin Tracking at the ILC Positron Source with PPS-Sim POSIPOL’11 V.Kovalenko POSIPOL’11 V. Kovalenko 1, G. Moortgat-Pick 1, S. Riemann 2, A. Ushakov 1.
20 th October 2010 IWLC Sources working groupL. Rinolfi Louis Rinolfi CLIC e - and e + sources overview for the CLIC Sources collaboration.
ROBERT CHEHAB (IPNL/IN2P3/CNRS AND UNIVERSITE LYON 1) ON BEHALF OF ILC_IHEP_IPNL_POSITRON SOURCE GROUP ON BEHALF OF POSITRONS FOR LINEAR COLLIDERS: AN.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
Some Aspects on Compton Scheme Positron Source Study Wanming Liu ANL Tsunehiko OMORI KEK.
LHeC Sources Rinolfi CERN Thanks to:
Positron Source and Injector
Positron Sources of Next generation B-factories (SuperKEKB, SuperB)
Test of Hybrid Target at KEKB LINAC
Positron capture section studies for CLIC Hybrid source - baseline
Status of the CLIC main beam injectors
CLIC e+ status Louis Rinolfi.
CLIC Main Beam Sources and their transfer lines
REVIEW OF POSITRON SOURCE R&D FOR LINEAR COLLIDERS
ILC/CLIC e+ generation working group
Injection facility for Novosibirsk Super Charm Tau Factory
SuperB project. Injection scheme design status
CLIC source update CLIC main beam injectors reminder
Capture and Transmission of polarized positrons from a Compton Scheme
Electron Source Configuration
Summary for the Sources working group
Status of the CLIC Injector studies
CEPC Injector positron source
with contributions from
CEPC Injector positron source
Presentation transcript:

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Louis Rinolfi CLIC e + status

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi General CLIC layout for 3 TeV Generation of e + Generation of e -

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Thermionic e - gun Laser DC gun Polarized e - Pre-injector e - Linac 200 MeV e - /  Target Primary e - Beam Linac 5 GeV Injector Linac 2.66 GeV e + DR e + PDR Booster Linac 6.14 GeV 2 GHz e + BC1 e - BC1 e + BC2 e - BC2 e + Main Linac e - Main Linac 2 GHz e - DR e - PDR 2 GHz 12 GHz 9 GeV 48 km 2.86 GeV  e  Target AMD 2.86 GeV 3 TeV Base line configuration 2011 CLIC Main Beam Injector Complex IP polarized e - unpolarized e + SR 12 GHz, 100 MV/m, 21 km IP = Interaction Point SR= Spin Rotator BC = Bunch Compressor DR= Damping Ring PDR= Pre-Damping Ring AMD= Adiabatic Matching Device SR Bunching system Pre-injector e + Linac 200 MeV BC0

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi CLIC Main Beam Injector complex with real dimensions on the CERN site Zoom e - transfer line e + transfer line e - and e + sources e - and e + Damping Rings

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi SLC (California) CLIC (3 TeV) CLIC (0.5 TeV) ILC (RDR) LHeC (p-140) LHeC (ERL) Energy 1.19 GeV2.86 GeV 5 GeV140 GeV 60 GeV e + / bunch (at IP) 40 x x x x x x 10 9 Norm. Emittances at IP (mm.mrad) 16H = 0.66 V = H = 4.8 V = H = 10 V = e + / bunch (after capture) 50 x x x x x x 10 9 Bunches / macropulse NA Macropulse Rep. Rate (Hz) CW Number bunches / s x10 6 e + / second x Flux of e +

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi CLIC study to define hybrid targets September 2009

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi CLIC hybrid targets e - /train Primary electron beam Linac  e  Target Thermionic e - gun 5 GeV e - /  Target Bunching system Crystal thickness: 1.4 mm Distance (crystal-amorphous) d = 2 m Amorphous thickness e =10 mm crystal amorphous e-e- e-e- e+e+  e-e- e+e+ Dipole Oriented along the axis e + source parameters for the baseline after optimization of parameters Targets are tungsten (W)

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi FOT is a code developed by X. Artru (IPN Lyon) in the years 80’s Conversion in C ++ and implementation in GEANT. FOT simulates coherent and incoherent Bremsstrahlung radiations as well as Kumakhov radiation in channelling condition. GEANT 4 simulates pair creation and incoherent Bremsstrahlung (+ usual G4 processes). With G4FOT code, the e + yield, from hybrid target, can be simulated with one single program. G4FOT : a new code Comparison have been done with V. M. Strakhovenko simulation (BINP) A difference ~ 15%, has been found, depending on the incident energy. O. Dadoun (LAL) is investigating.. G4FOT allows to simulate the production of photons from the crystal target, the production of positrons from the amorphous target and the capture downstream the amorphous target.

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Energy of e - impinging the crystal target: 5 GeV Number of photons at the exit of the crystal target Crystal target thickness: 1mm CLIC crystal target Number of e - impinging the target : O. Dadoun / LAL

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi KEKB experiments with hybrid targets T. Takahashi / Hiroshima Uni. 8GeV e- Analyzing magnet 5 ~ 30MeV This experiment will be very useful as test bench to cross-check G4FOT simulations and experimental data Amorphous target

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi A granular target on a rotating wheel If in the CLIC target, the deposited energy would be too large, a possible solution has been proposed by P. Sievers with a granular target distributed on a rotating wheel See Peter’s talk for ILC at this workshop

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Crystal target To the Injector Linac Amorphous Target  Adiabatic Matching Device Pre-injector linac Solenoid TW cavities  Bunch compressor e+e+ Dipoles e+e+ e-e- e-e- Dipole E = 200 MeV CLIC Pre-Injector e + Linac layout Parameters for the 5 TW sectionsUnitValue Lengthm4.36 FrequencyGHz2 Nb of cells couplers Phase advance per cell2/3π Maximum Axial Electric FieldMV/m15 Cell lengthm0.0499

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Distribution of e + at 200 MeV Accelerating mode Decelerating mode The values in red are given for a window of ± 5 MeV and ± 2.5 mm F. Poirier / LAL

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Mode Pre-Injector length (m) Total yield EfficiencyRMS bunch length (mm) Mean Energy (MeV) FWHM energy (MeV)  x (mm)  x’ (mrad) Accelerating Decelerating CLIC Pre-Injector e + Linac results Total yield = N e+ 200 MeV ) / N e- 5 GeV) Efficiency = N e+ (assuming 1.2% PDR acceptance ) / N e- 5 GeV) The decelerating mode in the Pre-Injector Linac improves the e + performance and the efficiency See Freddy’s talk at this workshop

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi CLIC study for the e+ Pre-Injector Linac July 2011

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Klystron 50 MW 2 GHz A1A2A3 50 Hz E = GeV I = 2.5 A An RF module: Number of cavities:N = 3 Length:L = 1.5 m Aperture radius: = 17 mm Filling time:t f = 389 ns Unloaded gradient:E z = 27 MV/m Loaded gradient:E z = 15 MV/m Energy gain/module:  E = 67.5 MeV RF frequency:f = 2 GHz Repetition frequencyF = 50 Hz 2.86 GeV CLIC Injector e + Linac

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Simulation results for CLIC Injector Linac Black distribution = end of Injector Linac Red distribution = captured inside the PDR e + in PDR (March 2011): Yield e + /e - = 0.39 S cm N. e + Yield e + /e -  x  mm mrad  y  mm mrad MeV  E MeV  z mm  z  cm MeV A. Vivoli / CERN

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi CLIC study for the e + Injector Linac June 2010

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Laser DC gun Polarized e - Pre-injector e - Linac 200 MeV Injector Linac 2.66 GeV e + DR e + PDR Booster Linac 6.14 GeV 2 GHz e + BC1 e - BC1 e + BC2 e - BC2 e + Main Linac e - Main Linac 2 GHz e - DR e - PDR 2 GHz 12 GHz 9 GeV 48 km 2.86 GeV CLIC Main Beam Injector Complex IP polarized e - polarized e + SR 12 GHz, 100 MV/m, 21 km IP = Interaction Point SR= Spin Rotator BC = Bunch Compressor DR= Damping Ring PDR= Pre-Damping Ring AMD= Adiabatic Matching Device SR Bunching system BC0 Pre-injector Linac for e MeV 2 GHz  e  Target AMD Drive e - Beam Linac 1 GeV Compton ring  2 GHz Stacking cavity YAG Laser RF gun SR 3 TeV Compton based configuration

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Compton ring is very attractive for the CLIC polarized positron sources: 1) no modification in the Main Linac 2) no modification of the Main Beam Injector complex apart to install a new ring 3) could work in parallel with the existing conventional hybrid targets Compton ring as polarized e + source BUT it needs:  a Compton ring design (high beam current, double chicane, high RF voltage,…)  a strong R&D on laser (laser energy, laser pattern,…)  a careful optimization of the optical cavity and IP (beam size, stability,…)  a new design of the Pre-Damping Ring (momentum compaction, RF voltage, damping times, dynamic aperture,…)  a high stacking efficiency

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Option ERL + 2 SR as e + source 50 Hz Linac (if necessary) Cycle 1: Stacking in SR1 + Damping in SR2 Cycle 2: Damping in SR1 + Stacking in SR2 T. Omori & L. Rinolfi 4 th ILC-CLIC e + studies meeting

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Option CR + SR as e + source P. Gladkikh / NSC-KIPT

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi A proposal for SC Stacking Ring The proposed combined longitudinal-transverse injection into a superconducting stacking ring could be a solution Paper for IPAC 11

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Compton ring: KEK - LAL - NSC/KIPT/Karkhov ERL:KEK - LAL Compton Linac:BNL Undulator:ANL - DESY - CI - Lancaster Uni. CLIC polarized e + beam studies Collaborations have been done with the following institutes: CERN acknowledges them strongly

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Summary 1)The unpolarized e + source is based on hybrid targets, using channeling. A configuration with the present technology seems doable. The beam power deposition in the targets remains to be investigated. 2) It is crucial to implement test facilities. The KEKB experiment is the only one existing presently. It is an important step forward for the e + sources. 3) The polarized e + sources need more studies for several configurations. A superconducting positron stacking ring seems promising. Nevertheless for all configurations, strong R&D program is mandatory for future linear colliders.

28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Acknowledgements X. Artru, I. Bailey, E. Bulyak, I. Chaikovska, R. Chehab, J. Clarke, O. Dadoun, E. Eroglu, W. Gai, P. Gladkikh, T. Kamitani, A. Latina, W. Liu, T. Omori, J. Osborne, F. Poirier, P. Sievers, T. Takahashi, J. Urakawa, A. Variola, A. Vivoli, C. Xu, V. Yakimenko, L. Zang, F. Zimmermann, F. Zomer. Thank you for contributions and discussions: 15 Institutes have been involved and have contributed in the CLIC e + studies: ANL, BNL, BINP, CERN, Cockcroft Institute, DESY, Hiroshima University, IHEP, IPNL, KEK, LAL, Lancaster University, NSC-KIPT, SLAC, Uludag University.