Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.

Slides:



Advertisements
Similar presentations
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Advertisements

AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
1 Beam pipe and VXD mockup status at KEK S.Tanaka (KEK) SVD/PXD meeting.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Comments on ladder structure 5 Feb Toru Tsuboyama.
SVD assembly S.Tanaka. Outline SVD assembly work is individual with Beam pipe, heavy metal shield and PXD system. –Assembly work will be done on two assembly.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
SVD Environmental & Radiation Monitoring L.Vitale on behalf of monitoring group INFN and Univ. Trieste & others L.Vitale - VXD Workshop1Trieste - Sep.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
,C. Kiesling, 10th BPAC Meeting, KEK, Japan, Feb. 7-9, VXD Commissioning Organizational Matters (in response to the BPAC October report) Overall.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
Location of SVD Temperature and Humidity Monitors L.Vitale & L.Lanceri INFN & Univ. Trieste 6 th VXD Workshop, 02/10/2014 SVD parallel for discussion Sep.
C. Kiesling, 7th Belle II VXD Workshop, Prague, Jan , VXD Cooling Requirements IBBelle Overview Commissioning at CERN (ATLAS version) Software.
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors and Applications.
SVD IR mechanics status S.Tanaka SVD mechanics session.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Readiness of the FOS monitor for the thermal mock-up and recent activities. PRAGUE, January 7 th VXD Workshop E. Currás, D. Moya, I. Vila, A. L. Virto.,
KEK status report S.Tanaka(KEK) 13 th DEPFET workshop 2013/06.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Mechanical robustness & associated tension at the DSSD slant part connection Mar-5 th 2013 B2GM KEK S. Uozumi (KNU), T. Tsuboyama, N. Sato (KEK)
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
News From KEK S.Tanaka. FY2010 prelim. run schedule 2 Long-term Scheduling Committee (Uno) Max. : 12-May ~ 30-June actual run time is not decided yet.
8 September 2011 Belle II SVD/PXD Installation Procedure Mockup Meeting Munich Immanuel Gfall (HEPHY Vienna)
Florian Buchsteiner (HEPHY Vienna)
L.Vitale INFN and Univ. Trieste
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
SVD Overview Christoph Schwanda Institute of High Energy Physics Austrian Academy of Sciences 8th Belle II VXD Workshop September 9-11, 2015 Trieste, ITALY.
The interaction region and BEAST II
Schedule So far: academic exercise to check if all makes sense
Service channels between Tracker and PP1
KEK IR status S.Tanaka KEK.
Service channels between Tracker and PP1
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
S. Tanaka (PXD mechanics session)
SVD Ladder assembly at IPMU
Discussion items SVD mechanics session.
KEK IR status Shuji Tanaka KEK DEPFET workshop 2011/2/7-9 1.
Very preliminary draft
Katsuro Nakamura Sep. 10, 2015 VXD meeting
Prologue: Strasbourg Interest in BEAST
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Flavour Physics Belle II experiment at SuperKEKB Tsukuba, Japan
SVD Mechanics Group Organization & Work packages
Comments to the SVD4 structure
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
Class B Ladder assembly
SVD group organization, schedule, milestones
Service test.
Presentation transcript:

Next chance for Service test

In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4 or 1/8 service test (measuring height Of cables and pipes and also space Between QCS head and VXD service frame RVC: Wooden mock or 3D printed one?

Schedule In the 22th B2GM, Finalizing Heavy metal and End-flange design Confliction test of SVD each layer by Class C Origami pipe mount procedure Finalizing BEAST setup (Mount block design + SVD mount method) After B2GM Starting Endring + pipe brazing (KEK SVD) Should delivered in Jan, 2016 Service adoption test on SVD ladders (KEK SVD) Second gluing test of Endring with support cone(KEK SVD) (Second Outer cover gluing test) VXD Clean booth space expansion (S.Tanaka) Service management test(ladder mount table + VXD table) SVD BEAST setup preparation 23th B2GM (Feb. 2016) VXD assembly and transportation test with services After 23th B2GM Starting SVD assembly from Feb (Outer cover gluing) Support cone + End-flange Support cone + endrings First ladder mount test +service test in March 2015 Optimizing each procedure (2016 summer ladder mount start)

2016 Apr.- BEAST phase 2 structure assembly on VXD table 24 th B2GM (June?) PXD mount test by BEAST BP+HM BEAST sensor + services mount test Mount block(real or mock) should be prepared Each assembly step should be verified by mock or partial test before Real assembly When VXD dock ring + VXD dock can be delivered ? (for final service installation test)