Doc.: IEEE 802.11-04/1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 1 Mesh Networking Task Group Process Donald E. Eastlake 3 rd.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, November Date: Author:
Advertisements

Doc.: IEEE /2142r1 Submission July 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, July Date: Authors:
Doc.: IEEE /130r0 Submission January 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0765r0 Submission July 2005 Jesse Walker (Intel Corporation) Slide 1 Motion Move To form an IEEE Study Group to receive WLAN.
Doc.: IEEE /0235r0 Submission February 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, February Notice: This document has been prepared.
Doc.: IEEE /840r2 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
Doc.: IEEE /207r0 Submission March 2005 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /800r2 Submission July 2004 Donald Eastlake 3rd, MotorolaSlide 1 Mesh Networking Task Group Process Donald E. Eastlake 3 rd
Doc.: IEEE /1386r0 Submission September 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, September Notice: This document has been prepared.
Doc.: IEEE P /2331r2 Submission September 2007 Donald Eastlake 3rd, MotorolaSlide 1 September 2007 TGs ad hoc Agenda Date: Authors:
Doc.: IEEE /840r1 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
Doc.: IEEE /1149r4 Submission November 2004 Donald Eastlake 3 rd, MotorolaSlide 1 IEEE s: ESS Mesh Networking Task Group San Antonio, Texas.
Doc.: IEEE /0380r1 Submission March 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, March Notice: This document has been prepared to assist.
Doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, March Notice: This document has been prepared to assist.
Doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 1 Mesh Networking Task Group Process Donald E. Eastlake.
Doc.: IEEE /800r1 Submission July 2004 Donald Eastlake 3rd, MotorolaSlide 1 Mesh Networking Task Group Process Donald E. Eastlake 3 rd
Doc.: IEEE /366r0 Submission May 2005 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
IEEE s: ESS Mesh Networking Task Group
TGu Process Date: Authors: January 2005 January 2005
TGs Process, November Date: Authors: November 2007
TGs Process, March Date: Authors: May 2006 May 2006
IEEE s: ESS Mesh Networking Task Group
TGs Process, July Date: Author: July 2009 July 2009
Mesh Networking Task Group Process
IEEE s: ESS Mesh Networking Task Group
TGs Process Date: Authors: January 2005 January 2005
TGs Process Date: Authors: November 2005 November 2005
TGs Process Date: Authors: July 2005 July 2005
TGs Process Date: Authors: September 2005 September 2005
IEEE s: ESS Mesh Networking Task Group
TGs Process, July Date: Author: July 2009 July 2009
TGs Process Date: Authors: March 2005 March 2005
TGs Process, March Date: Authors: May 2006 May 2006
TGs Process Date: Authors: July 2005 July 2005
TGs Process Date: Authors: March 2005 March 2005
TGs Waikoloa Closing Report
TGs Process, March Date: Authors: March 2006 January 2006
TGs Process, September Date: Author: September 2008
TGs Process, March Date: Authors: May 2006 May 2006
ESS Mesh Study Group Report
TGs Process, November Date: Authors: November 2007
TGs Process, November Date: Author: November 2009
January 2005 Mesh Agenda Authors: January 2005 Date:
January 2005 Mesh Agenda Authors: January 2005 Date:
TGs Process, July Date: Authors: July 2006 July 2006
TGs Dallas Closing Report
TGs Process, November Date: Authors: November 2007
TGs Process, March Date: Authors: March 2007 March 2007
TGs Process, July Date: Author: July 2009 July 2009
TGs Process, February Date: Authors: February 2007
TGs Process, March Date: Authors: May 2006 May 2006
TGu Process Date: Authors: January 2005 January 2005
March 2005 Mesh Agenda Authors: March 2005 Date: March 2005
TGs Process, September Date: Author: September 2009
TGs Process, September Date: Authors: September 2007
TGs Process, January Date: Authors: January 2007
TGs Process, November Date: Authors: November 2006
TGs Process, November Date: Authors: November 2006
TGs Process, March Date: Author: March 2009 March 2009
TGs Process, January Date: Authors: January 2007
TGs Process, May Date: Authors: May 2007 March 2007
Mesh Networking Task Group Process
TGs Closing Plenary Report
Task Group N Schedule March 15, 2004
TGs Process Date: Authors: March 2005 March 2005
TGs Process, May Date: Authors: May 2007 May 2007
TGs Process Date: Authors: May 2005 May 2005
Mesh Networking Task Group Process
March 2005 Mesh Agenda Authors: February 2005 Date:
TGs Process, March Date: Authors: March 2008 March 2008
Presentation transcript:

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 1 Mesh Networking Task Group Process Donald E. Eastlake 3 rd

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 2 Generic Process of Getting to Letter Ballot Adoption of PAR and 5 Criteria Technical Presentations and Discussions Specify Any Additional Requirements, Comparison Criteria, or Other Documents Call For Proposals Select/Combine from Submitted Complete/Partial Proposals to Produce a Draft Refine Draft Letter Ballot

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 3 Historical Project Timelines Time from PAR approval to first Letter Ballot – average of 6.6 meetings / 13 months –TGe-7, TGf-7, TGg-9, TGh-4, TGi-6 Time from first Letter Ballot to first Sponsor Ballot – average of 9 meetings / 18 months –TGe-12, TGf-9, TGg-6, TGh-8, TGi-10 (above data compiled by Bruce Kraemer)

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 4 Call for and Submission of Proposals As voted in Berlin, we have publicly announced that we plan to –issue a Call for Proposals shortly after the January 2005 meeting –with documents to be posted before and presentations made at the July 2005 meeting.

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide s Project Timelines Our PAR approval was 24 June 2004 –At the average pace for these Task Groups, our first Letter Ballot would open in July 2005 and our first Sponsor Ballot in January We are now behind the average pace for our first Letter Ballot. –We have announced January 2005 for a call for proposals to be submitted in July It will be some number of meeting beyond that before we can try for our first WG Letter Ballot. Things will generally happen slower than what we aim for.

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 6 Ad Hoc Subgroups and TGs Working Documents Ad Hoc Subgroups –Have no special status unless TGs votes on them or their output. –Any group of members can get together and make submissions. Within the Policies and Procedures (11-04/510r0), we can do what we want internally: –“Adopted” internal TGs motions/documents can be amended, replaced, or un-adopted. –We can have a “Functional Requirements” document that is as general or specific as we like.

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 7 Informal Ad Hoc Subgroups Functional Requirements and Scope – coordinator Steve Conner –“Functional Requirements & Scope”, 11-04/1174r7/8 Comparison Criteria – coordinator Steve Conner –“Comparison Criteria”, 11-04/1175r5 Definitions – coordinator Tricci So –“Terms and Definitions for s”, 11-04/1477r0 Usage Models – coordinator Steve Conner –“Usage Models”, 11-04/662r11

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 8 Informal Ad Hoc Subgroups (cont.) MAC / Quality of Service / e – coordinator Lily Yang –“Issues for Mesh Media Access Coordination Component in 11s (v03)”, 11-04/968r4 Security / i, 802.1ae, 802.1af – coordinators Jasmeet Chhabra, Bob Moskowitz –“802.11s Security Concepts”, 11-04/1115r1 Other –802.11k, h /Radio Resources/Metrics – coordinator –WNM, CAPWAP /Management – coordinator

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 9 July 2004 Straw Poll: Informal Group Submissions Status What should be the status of relevant submissions from informal groups if a majority of TGs agrees with the submission? –Strongly included as part of call for proposals – 12 –Adopted as internal working documents – 29 –Included on a TGs recommended reading list – 3 –No special status – 2

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 10 Current Adopted Documents We have adopted three documents as internal working group documents: /969r2: Draft Terms and Definitions for s /662r10: Usage Models /970r3: Proposed TGs Scope

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 11 Working Document Motions Moved to replace TGs Working Document 11-04/969r2 (Draft Terms and Definitions for s) with 11-04/1477r0 (Terms and Definitions for s). –Moved: W. Steven Conner –Seconded: Guido Hiertz –Passed by unanimous consent

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 12 Working Document Motions Moved to replace TGs Working Document 11-04/662r10 (Usage Models) with revision number 11 of that document. –Moved: W. Steven Conner –Seconded: Guido Hiertz –Passed by unanimous consent

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 13 Working Document Motions Moved to replace TGs Working Document 11-04/970r3 (Proposed TGs Scope) with 11-04/1174r8 (Functional Specification and Scope). –Passed by unanimous consent.

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 14 Working Document Motions Moved to adopt 11-04/1175r5 (Comparison Categories and Criteria) as a TGs Working Document. –Passed by unanimous consent

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 15 Schedule Projected at Berlin (September) Meeting November 2004 (San Antonio, Texas) –Work on Functional Requirements and other documents that may be referenced in the Call for Proposals. January 2005 (Monterey, California) –Work on Functional Requirements and other documents that may be referenced in the Call for Proposals. –Call for Proposals issued immediately after meeting with deadline for submission of two weeks before the July meeting. March 2005 (Atlanta, Georgia) –Presentations, refinement of selection criteria May 2005 (Beijing, China) –Presentations, refinement of selection criteria July 2005 (San Francisco, Califonria) Presentation of Proposals September 2005 (TBD) Derivation of Draft November 2005 (Vancouver, British Columbia) Further Refinement of Draft, Letter Ballot Authorized by WG?

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 16 Early Draft Call for Proposals I have put together a generic suggested draft Call for Proposals: 11-04/1430r3 It includes –Different Levels of Referenced Documents –Deadlines based on our publicly announced planned schedule

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 17 Possibilities Between the November 2004 and January 2005 Meetings Possibilities for TGs Activity Between November 2004 and January 2005 Meetings to accelerate action : –Multiple Teleconferences (require 10 days notice, cannot be held more often than weekly (P&P clause 3.6.3)) –One Teleconference –Additional official face to face meeting is probably not practical due to holidays and requirement for 30 days notice (P&P clause 3.6.2)

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 18 Teleconferences Motion Teleconferences Motion: Moved, that TGs have teleconferences at 16:00 Eastern Standard Time Wednesdays on 1 December, 15 December, 5 January, and 12 January. Notice will be given, including UTC time, at least 10 days in advance. –Passed by unanimous consent

doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 19 Schedule Projected at San Antonio (November) Meeting January 2005 (Monterey, California) –Work on Call for Proposals and on the Functional Requirements, Comparison Critera, and other documents that may be referenced in the Call for Proposals. –Call for Proposals issued immediately after meeting with deadline for submission of two weeks before the July meeting. March 2005 (Atlanta, Georgia) –Presentations, refinement of selection criteria and process May 2005 (Beijing, China) –Presentations, refinement of selection criteria and process July 2005 (San Francisco, Califonria) –Presentation of Proposals and initial selection actions September 2005 (TBD) Derivation of Draft November 2005 (Vancouver, British Columbia) Further Refinement of Draft January 2006 () Letter Ballot Authorized by WG?