Data Collection for HDM Christopher R. Bennett EASTE.

Slides:



Advertisements
Similar presentations
Presented by: Richard Wood. Goals and strategies Methods Performance evaluation Performance improvements Remaining Challenges.
Advertisements

A Connected Vehicle-Based Application to Estimate Road Roughness Transportation agencies devote significant resources towards collection of highly detailed.
Wyoming County Paved Roads Management and Monitoring Khaled Ksaibati, Ph.D., P.E. STIC June, 2014.
DIGITAL HIGHWAY MEASUREMENTS TURNER-FAIRBANK HIGHWAY RESEARCH CENTER David Gibson Milton (Pete) Mills Morton Oskard ADVANCED RESEARCH PROJECT 1.
Detection and Measurement of Pavement Cracking Bagas Prama Ananta.
EVALUATION OF FWD DATA FOR DETERMINATION OF LAYER MODULI OF PAVEMENTS Dr. Yusuf Mehta, P.E. Rowan University Dr. Reynaldo Roque, P.E. University of Florida.
The Company ViaTech is a Norwegian Company with a comprehensive range of tailor-made products and services aimed at road, rail and airport authorities.
History Dynatest was founded in 1976 in Denmark by a group of engineers and technicians who combined  science  technology and  business into the development.
TURNER-FAIRBANK HIGHWAY RESEARCH CENTER NDE Research Ongoing Projects and Response Based Load Rating The Office of Research, Development, and Technology.
SURVEYING II UNIT IV PRESENTATION II.
Pavement Ride Quality Nicholas Vitillo, Ph. D. Center for Advanced Infrastructure and Transportation.
PAVEMENT CONDITION SURVEYS. Instructional Objectives n Need for condition surveys n Collection methodologies n Basic types of condition surveys n Different.
Geographic Information Systems and Science SECOND EDITION Paul A. Longley, Michael F. Goodchild, David J. Maguire, David W. Rhind © 2005 John Wiley and.
Data Collection for Determining Pavement Condition
PERFORMANCE MODELS Lecture 16. Understand use of performance models Identify common modeling approaches Understand methods for evaluating reliability.
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
HTC Infrastructure Management Specialists; a Montgomery Watson Harza Company Experiences With Kinematic GPS Surveys in Developing Countries Dr Christopher.
HDM-4 Calibration. 2 How well the available data represent the real conditions to HDM How well the model’s predictions fit the real behaviour and respond.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
9. GIS Data Collection.
Classification of Instruments :
1 Area Calculations. 2 Introduction Determining the boundaries and size of an area is a common occurrence. Chemical spill Wet land Watershed Etc.  For.
SPATIAL FRAMEWORK FOR A TITLE REGISTRATION SYSTEM: UNIQUE PARCEL IDENTIFIERS AND CADASTRAL MAPS.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
WVDOT GTI SECTION Status Update for Miss Utility.
Ref: Geographic Information System and Science, By Hoeung Rathsokha, MSCIM GIS and Remote Sensing WHAT.
1 ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2014 Reforms, Challenges and Safety Treacys West County Hotel, Ennis, May 2014.
Nondestructive Testing and Data Analysis Module 2-3.
Mission Planning and SP1. Outline of Session n Standards n Errors n Planning n Network Design n Adjustment.
Complete High Speed Data Collection System
Moving to International Roughness Index Measured By Inertial Profilers for Acceptance of New Asphalt Construction in Ontario By John A. Blair, Bituminous.
MMS/MLS – Mobile Mapping and Mobile Laser Scanning System 4th ISPRS SC and WG VI/5 Summer School, Warsaw 2009.
2-1 LOW COST SAFETY IMPROVEMENTS The Tools – Identification of High Crash Locations – Session #2.
Remote Sensing for Asset Management Shauna Hallmark Kamesh Mantravadi David Veneziano Reginald Souleyrette September 23, 2001 Madison, WI.
W.D.M. Limited North View, Staple Hill, Bristol BS16 4NX Telephone: Web: IMPROVED LOCATIONAL ACCURACY OF SCRIM DATA USING GPS.
Local and Regional Procurement Learning Alliance 7. Market Data MARKET SELECTION.
Evaluating Remotely Sensed Images For Use In Inventorying Roadway Infrastructure Features N C R S T INFRASTRUCTURE.
INVENTORY AND HISTORY. Instructional Objectives n Types of inventory and historical data n Different methods of collecting inventory and historical data.
PAVEMENT CONDITION SURVEYS
Pavement Thickness Evaluation Using Ground Penetrating Radar Dwayne Harris Dwayne Harris Presented for Final Exam.
Ministry of Transportation Ministère des Transports Road Profiler User Group (RPUG) Stateline, Nevada September 28, 2011 Li Ningyuan Ministry of Transportation.
PERFORMANCE MODELS. Understand use of performance models Identify common modeling approaches Understand methods for evaluating reliability Describe requirements.
Use of Probe Vehicles to Measure Road Ride Quality
HDM-4 Institutionalization. 2 HDM is for decision-support tool; not decision- making Institutionalization process should ensure that outcome is:  sustainable,
Census Processing Baku Training Module.  Discuss:  Processing Strategies  Processing operations  Quality Assurance for processing  Technology Issues.
By Terry Treutel Ride Quality Consultant Former WisDOT Ride Spec Coordinator.
Asset and Network Information Routable Road Centreline A Main Roads Perspective Steve Boston Manager Asset & Network Information August 2009.
BME 353 – BIOMEDICAL MEASUREMENTS AND INSTRUMENTATION MEASUREMENT PRINCIPLES.
Mapping of Traffic Conditions at Downtown Thessaloniki with the Help of GPS Technology P. D. Savvaidis and K. Lakakis Aristotle University of Thessaloniki,
1 TOPIC:- COMPUTATION OF BOUNDARY AREA NAMEPEN NO 1.RUCHIR MISTRY MIYANI DIKEN MOHIT KHANPARA MANSUR ADIL
RIMMS Data Collection Workshop #2 Christopher R. Bennett Stephen Vincent Scott Wilson U.K.
Infrastructure Management Location Referencing Management System Project LRMS Infrastructure Management Regional Presentations Update on.
Satellite Network. Satellite Network 24 satellites in orbit, plus 3 backups lbs, solar powered Orbit height is roughly 20,000 km (Earth radius.
Pavement Management in Developing Countries Christopher R. Bennett Senior Transport Specialist East Asia Transport Unit
ROAD PROFILING-ROUGHNESS Presentation by Niranjan Santhirasegaram
TRAFFIC STUDY AND FORECASTING SHRI DEVI POLYTECHINIC
National Highway Institute 5-1 REV-2, JAN 2006 EQUIPMENT FACTORS AFFECTING INERTIAL PROFILER MEASUREMENTS BLOCK 5.
Infrastructure Management Location Referencing Management System Project LRMS Infrastructure Management Regional Presentations Update on.
Road Management System and Data Collection in Karnataka PWD Public Works Department Government of Karnataka By Dr. H.R.Shantharajanna Chief Information.
Road Information System IT & Planning Division, NHAI Presentation on National Highways Authority of India byby + +
Overview of dTIMS Input, Analysis and Reporting HTC INFRASTRUCTURE MANAGEMENT LTD.
Data Collection Technologies for Road Management Brown Bag Lunch Presentation 4 May 2005 Christopher R. Bennett EASTR.
Road Owners and PMS Christopher R. Bennett Senior Transport Specialist East Asia and Pacific Transport The World Bank Washington, D.C.
Christopher R. Bennett EASTR
Principles of Calibrating HDM-4
Introduction to Geospatial Technologies in Ag
Pavement Thickness Evaluation Using Ground Penetrating Radar
Christopher R. Bennett The World Bank Senior Transport Specialist NB :
Ken Maser, Adam Carmichael,
CIMMS – Network Survey Vehicle
Presentation transcript:

Data Collection for HDM Christopher R. Bennett EASTE

2 Presentation Overview Principles of Data Collection Location Referencing Pavement Data Traffic Data Generic Specifications

Principles of Data Collection

4 Good Data Critical for HDM Without good data cannot have sensible results If input data are wrong why worry about calibration?

5 Categories of Data Inventory  Physical elements of system  Do not change markedly over time  Typically measured in ‘one off’ exercise and updated Condition  Change over time  Require regular (or irregular) monitoring

6 What to Collect? Foundational question Decision often based on  Wish list (“nice to have”)  Existing or historical data collection processes Can lead to data collection becoming an end in itself Excessive or inefficient data collection could compromise project

7 Cambodia: $600,000 for 11,000 km ($55/km)  Included procurement of equipment, vehicles, surveys Laos: $225,000 for 8,000 km ($28/km)  Surveys and map preparation New Zealand: $10-$15/km  Surveys only Comparative Costs

8 Recommended Approach Collect only the data you need Collect data to the lowest level of detail sufficient to make an appropriate decision Collect data only when they are needed Use pilot studies to test the appropriateness of the approach

9 Network Level Data Calibration Data Performance StructureCondition RideDistressFriction IQL-5 IQL-4 IQL-3 IQL-2 IQL-1 System Performance Monitoring Planning and Performance Evaluation Programme Analysis or Detailed Planning Project Level or Detailed Programme Project Detail or Research HIGH LEVEL DATA LOW LEVEL DATA Data Detail Very Important

10 Survey Frequency Inventory Data  One off exercise  Updated/verified ~5 years Pavement Condition Data  Main roads 1-2 years  Minor roads ~2-5 years Bridge Condition Data  Regular surveys 1-2 years  Intensive surveys ~5 years Traffic Data  Permanent count stations (24/7/365)  Short-term count stations (~ days)

Location Referencing

12 The Most Important Issue Unless properly referenced, data will be of limited use Two elements:  The location  The address used to identify the location Three components:  Identification of a known point (eg km stone)  Direction (ie increasing/decreasing)  Distance measurement (ie displacement/ offset)

13 One Location - Many Addresses

14 Linear Referencing Most common Different methods  Kilometre point (e.g., 9.29)  Kilometre post (e.g., 9.29 with equations)  Reference point (e.g., xx )  Reference post (e.g., xx )

15 Referencing a Network

16 Examples of Referencing (NZ) Large Roundabout Divided Carriageway

17 Examples of Referencing (NZ) Ramp

18 Example of Referencing a Highway

19 Referencing Business Process

20 Spatial Referencing Latitude/Longitude Usually measured with GPS  Accuracy typically 95% +/- 10 m Improved through differential correction or post-processing  Survey issues will typically give accuracy +/- 1 m Recorded in WGS84 datum and so usually needs to be converted to local co-ordinate system

21 GPS Validation

22 Examples of GPS Data Processing Topological Corrections Correcting for incomplete survey Harmonizing different survey data

23 Cambodia - Validation of Survey Lengths

24 Manual Validation of Centreline

25 GPS Data Projection - NZ Aerial/Satellite photos and ground survey data can have different projections Wrong Projections Correct Projections

26 GPS Data Projection - Samoa

Pavement Data Collection - General

28 Pavement Data Framework

29 Measurement Equipment Types

30 Multi-function Systems Measure multiple attributes in a single pass Most cost effective and reduces location referencing issues Two groups:  Portable systems: installed in any vehicle  Dedicated systems: custom instrumented vehicle Portable usually cheaper and more sustainable but sophisticated measurements require dedicated vehicle

31 Typical Survey Progress - Cambodia

32 Data Processing Surveys result in a large amount of data Unless processing is done during survey significant delays  Contracts require data submission within 30 days of survey Quality assurance is challenging but essential  Philippines: some data returned 4 times to contractor for correction ALL projects have underestimated difficulties in data processing

33 Location Referencing Digital DMI (< $1 k) GPS (< $1 – 10 k) GPS with Inertial System (< $ k)

34 Geometry Combine GPS and precision gyroscopes/ inclinometers (> $50k) Precise 3-D measurements including cross-fall

35 Video Logging

Roughness

37 Roughness ‘Bumpiness’ of road Usually related to serviceability but also reflects structural deterioration Affects VOC, safety, comfort, speed Most commonly expressed as IRI IRI simulates response of ‘Quarter-car’ to road profile

38 IRI Scale

39 Types of Equipment

40 Roughness Measurements Class I Class III

41 Variability Between Class I Instruments 2.5 IRI (m/km) 3.5

42 Comparison of Footprints

43 Comparison of Toyota Landcruiser Roughness Calibrations Vehicle 1 Vehicle 2

Structural Capacity

45 Structural Capacity Destructive techniques  Coring  DCP Non-destructive techniques  Deflection measurements

46 Deflectometers Trailer FWD Vehicle FWDPortable

47 Benkelman Beam

48 Ground Penetrating Radar

Surface Distresses

50 Surface Distresses Performed manually or with automated equipment Includes:  Cracking  Surface Defects  Deformations Great variation in measures used between countries

51 Distress Measurements

52 Video Distress Analysis

53 Current Situation – Video Distress A number of successful commercial systems Some degree of human intervention required Systems usually expensive (> $200 k) and require dedicated vehicles with supplemental lighting Technology ‘evolving’

54 Rut Depths Measured using discrete sensors (ultrasonic/laser) or line Data analyzed to simulate rut depth under a straight edge Systematic under- recording with discrete sensors

55 Implications of Sampling With discrete sampling need to have sufficient sensors to capture key profile information Profiles Usually Sample at Discrete Points Rut Depth Error vs Number of Sensors

Selecting Equipment

57 Selecting Equipment Used multi-criteria analysis based on survey and literature review Weightings changed based on road type/class

58 Cost/Performance Matrix – All Roads

59 Cost/Performance Matrix - Expressways

60 Cost/Performance Matrix – Urban Roads

61 Cost/Performance Matrix – Rural Roads

62 Cost/Performance Matrix – Unsealed Roads

The end …