Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

Measurements of adiabatic dual rf capture in the SIS 18 O. Chorniy.
Development of a Chromaticity measurement application using Head-Tail phase shift technique.
Design and test of a high-speed beam monitor for hardon therapy H. Pernegger on behalf of Erich Griesmayer Fachhochschule Wr. Neustadt/Fotec Austria (H.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
M.Gasior, CERN-BE-BIBE-KT Innovation Day, 3 June Base Band Tune (BBQ) measurement systems - observing beam oscillations with sub-micrometre amplitudes.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
Details of space charge calculations for J-PARC rings.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Energy calibration at LHC J. Wenninger. Motivation In general there is not much interest for accurate knowledge of the momentum in hadron machines. 
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
Beam loss and longitudinal emittance growth in SIS M. Kirk I. Hofmann, O. Boine-Frankenheim, P. Spiller, P. Hülsmann, G. Franchetti, H. Damerau, H. Günter.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
NUCLOTRON CONTROL SYSTEM (NCS) V.Andreev, E.Frolov, A.Kirichenko, A.Kovalenko, B.Vasilishin, V.Volkov Laboratory of High Energies, JINR, Dubna.
A mass-purification method for REX beams
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
FY07 RHIC Schottky and Tune Ripple Experiments Plans M. Blaskiewicz, K. Brown, D. Bruno, P. Cameron, C. Degen, A. Della Penna, W. Fischer, G. Ganetis,
By Verena Kain CERN BE-OP. In the next three lectures we will have a look at the different components of a synchrotron. Today: Controlling particle trajectories.
First Demonstration of Optics Measurement and Correction during Acceleration Chuyu Liu Collider Accelerator Department, BNL.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
F. Caspers, S. Federmann, E. Mahner, B. Salvant, D. Seebacher 1.
U. Raich CERN Accelerator School on Digital Signal Processing Sigtuna Digital Signal processing in Beam Diagnostics Lecture 1 Ulrich Raich CERN.
F f Quadrupole Pick-Ups at CERN & Fermilab A.Jansson FNAL.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
ADSR Inst.July 2009 From PAMELA to ADSR, T.Yokoi From PAMELA to ADSR Takeichiro Yokoi (JAI)
ApEx needs for CeC PoP Experiment December 11, 2015.
By. Jadhav Avinash J Roll no - 2K13E11. Reference: Hewlett Packard Agilent Technology Wikipedia GwINSTEK.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
Accuracy of the orbit measurement by KEKB BPM system for the study of ILC damping ring H. Fukuma (KEK) Requirement for the accuracy of BPM data.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Measuring Chromaticity Beam Dynamics meets Diagnostics Workshop Florence, Italy 4 th – 6 th November, 2015 Dr. Rhodri Jones Head of the CERN Beam Instrumentation.
Rahul Singh Betatron Tune Measurements 1 Beam Physics for FAIR Workshop May, 2012 Odenwald, Germany R. Singh 1,2, O. Chorniy 1, P. Forck 1, P. Kowina.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Interpretation of beam signals for high intensities
Orbit Response Matrix Analysis
Status of the ASTRID2 facility
Beam based measurements
First Idea on Bunch to Bucket Transfer for FAIR
P. Forck, P. Kowina, M. Schwickert, R. Singh
Controls CBETA controls will extend existing EPICS control system
Jeffrey Eldred, Sasha Valishev
M. Mehler1), H. Klingbeil1), B. Zipfel2)
Tune measurements at SIS-18
The new 7BA design of BAPS
Limits on damping times
Beam Current Monitoring with ICT and BPM Electronics
Energy Calibration of the SPS with Proton and Lead Ion Beams
10.6 Fourier Transform Mass Spectrometry
Non-invasive Beam Position Monitor Research in HUST-PTF
PEPX-type BAPS Lattice Design and Beam Dynamics Optimization
PSB magnetic cycle 900 ms MeV to 2 GeV
Presentation transcript:

Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose

Udo Rauch Beam Diagnostics Seminar, Nov.05, Outline  Brief introduction to SIS-18 accelerator at GSI and motivation  The Libera position data system for tune  System setup  Typical position and tune track  Required beam excitation  Selected results  Space charge effects  Using RF for gating  Tune accuracy  Summary and outlook.

Udo Rauch Beam Diagnostics Seminar, Nov.05, SIS-18 synchrotron at GSI Important parameters of SIS-18: - Circumference 216 m - Inj. typeMultiturn - Energy range 11 MeV → 2 GeV - Acc.RF 0.8 → 5 MHz - Acc. harmonic 4 (no. of bunches) - Bunching factor0.6 → Ramp duration 0.3 → 1.5 s - Typical tune h/v Ion range (Z)1 → 92 (p to U) - Design beams2 x 10¹¹ U x 10¹³ p

Udo Rauch Beam Diagnostics Seminar, Nov.05, SIS-18 synchrotron at GSI Important parameters of SIS-18: - Circumference 216 m - Inj. typeMultiturn - Energy range 11 MeV → 2 GeV - Acc.RF 0.8 → 5 MHz - Acc. harmonic 4 (no. of bunches) - Bunching factor0.6 → Ramp duration 0.3 → 1.5 s - Typical tune h/v Ion range (Z)1 → 92 (p to U) - Design beams2 x 10¹¹ U x 10¹³ p Time span each 2.4 µs 1.6 ms after injection at 0.8 MHz 473 ms after injection at 4.2 MHz

Udo Rauch Beam Diagnostics Seminar, Nov.05, Motivation  Necessity of measurement system arises due to upgrade of existing accelerator SIS-18 for higher beam intensities and/for future accelerator(s) in FAIR project  Target  First of all: Single Bunch Position Measurement with a resolution better than 0.1mm  BaseBand – q measurement with bright signal intensity in order to use minimal or even no beam excitation  Single bunch separation  Future: (PLL) tune tracking  Due to the BPM upgrade process tune can be extracted out of high resolution position data

Udo Rauch Beam Diagnostics Seminar, Nov.05, Outline  Brief introduction to SIS-18 accelerator at GSI and motivation  The Libera position data system for tune  System setup  Typical position and tune track  Required beam excitation  Selected results  Space charge effects  Using RF for gating  Tune accuracy  Summary and outlook.

Udo Rauch Beam Diagnostics Seminar, Nov.05, What is Libera  Instrumentation Technology (I-Tech) – Libera is an integrated setup using a high resolution ADC for onboard data processing on a FPGA  Input actually is one BPM per Libera: 2 channels horizontally and 2 channels vertically  Data will be processed online delivering beam position data in packets to CCCP (presently under hard progress)  Use positions and look at periodicities: Frequency spectrum amplifier ADC and position evaluation Computer in control room amplifier pick up 4 channel ADC 125 MSa / s per channel 14 bit resolution (11 bit effectively) 256 Mb onboard memory

Udo Rauch Beam Diagnostics Seminar, Nov.05, What is tune -Machine intrinsic value: characteristic frequency of the Magnet Lattice (given by the strength of the quadrupole magnets) -Tune should always have a fractional part because of resonances -This fractional part can be measured only! (due to undersampling) -Can be excited directly for measuring purpose

Udo Rauch Beam Diagnostics Seminar, Nov.05, Motivation for digital measuring method  One point per integrated bunch  -> shift of all tune frequencies to baseband due to bunch-wise “sampling rate”  For digital method bunching factor, baseline shift and frequency range is no problem due to digital data treatment  Averaging noise power (thermal noise and digitization noise) by factor of 500 thanks to integration of bunch data (Frequency range 50 MHz -> kHz) (This alone means increase in S/N of position data by 27 dB)  Bunch tracing and Bunch-wise tune separation by software What is needed for position calculation:  Windowing data stream for bunch integration  Baseline restoring (due to AC coupling)  Simple mathematics: K = Sondenkonstante K O = Offset

Udo Rauch Beam Diagnostics Seminar, Nov.05, Position determination: windowing K = Sondenkonstante K O = Offset

Udo Rauch Beam Diagnostics Seminar, Nov.05, Position determination: windowing

Udo Rauch Beam Diagnostics Seminar, Nov.05, Results: Position and Tune Corresponding to 250 ms

Udo Rauch Beam Diagnostics Seminar, Nov.05, Some results: Beam Position and Tune Corresponding to 250 ms

Udo Rauch Beam Diagnostics Seminar, Nov.05, Beam Excitation using Noise Generator Frequency spectrum of noise exciter Matched to RF thus exciting directly on sidebands

Udo Rauch Beam Diagnostics Seminar, Nov.05, Beam excitation w noise Argon18+ beams 11 -> 300 MeV About 1e10 particles

Udo Rauch Beam Diagnostics Seminar, Nov.05, Beam Excitation using Noise Generator  Keeping noise as low as possible: using the IPM (Ionizing Profile Monitor) in order to estimate disturbance of beam profile by noise excitation Defining working Area without Profile broadening

Udo Rauch Beam Diagnostics Seminar, Nov.05, About Signal to noise Signal of baseband tune out of digitized data with noise excitation on lower side of working area is above noise with a level of 34 to 43 dB. This means a power ratio of 50 to 141 in between. As Tune signal amplitude is nearly independent of number of particles due to precise position data, this video is exemplary for tune measurements

Udo Rauch Beam Diagnostics Seminar, Nov.05, How it will be implemented in future

Udo Rauch Beam Diagnostics Seminar, Nov.05, Data acquisition through Libera system pick up amplifier position evaluation Shift to frequency domain tune? K = Sondenkonstante K O = Offset

Udo Rauch Beam Diagnostics Seminar, Nov.05, Outline  Brief introduction to SIS-18 accelerator at GSI and motivation  The Libera position data system for tune  System setup  Typical position and tune track  Required beam excitation  Selected results  Space charge effects  Using RF for gating  Tune accuracy  Summary and outlook.

Udo Rauch Beam Diagnostics Seminar, Nov.05, Space charge effects: coherent motion  Tune frequency is shifted due to self-fields of particles, depending on the amount of particles. Space charge introduces an additional acceleration force to the individual particle motion  The collective betatron motion is influenced by space charge, as it acts on the beam with well determined phase. This leads to frequency shift  Coherent motion changes absolute value of tune  Incoherent motion changes width of observed frequency

Udo Rauch Beam Diagnostics Seminar, Nov.05, Space charge effects: coherent motion Space charge coherent tune shift on vertical tune: Tune is shifted by up to 12 mq to lower frequency No observable effect on horizontal tune (maybe due to less sensitivity of pickup in horizontal plane and no possibility to excite beam)

Udo Rauch Beam Diagnostics Seminar, Nov.05, Position determination: windowing  Why not taking the RF? It is bunch- synchronuos, free-to-use and matched to the width of every bunch. Or not?

Udo Rauch Beam Diagnostics Seminar, Nov.05, Position determination: windowing Thus RF cannot be used, presumably due to cable mismatching; The gating of data has to be done on data itself

Udo Rauch Beam Diagnostics Seminar, Nov.05, Conclusions  It has been shown, that position and tune is measured stable for all types of ions and different number of particles with a resolution better than 0.1mm and at least 1mq for position and tune respectively  Data is ready to run online  Physical observations are possible thanks to a high resolution measurement (e.g. space charge, quadrupol oscillations, influence of chromaticity))  Next step is to implement this to an automatic correction system based on obtained position and tune data (Rahul) Thank you for Your attention!

Udo Rauch Beam Diagnostics Seminar, Nov.05,

Udo Rauch Beam Diagnostics Seminar, Nov.05,

Udo Rauch Beam Diagnostics Seminar, Nov.05, Data acquisition through Libera system pick up amplifier position evaluation Shift to frequency domain tune? K = Sondenkonstante K O = Offset

Udo Rauch Beam Diagnostics Seminar, Nov.05, Some Inputs for the tune calculation

Udo Rauch Beam Diagnostics Seminar, Nov.05, Outline  Brief introduction to accelerators at GSI and motivation  The Libera position data system for tune  Some results  Typical position and tune track  Required excitation level and influence on beam  Tune accuracy  Summary and outlook.