Cryomodule Interconnect Design Yun He, Tom Peterson, Yuriy Orlov, Tug Arkan July 29, 2015.

Slides:



Advertisements
Similar presentations
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Advertisements

Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
Vacuum Vessel Production Readiness Review
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
LCLS-II Cryomodules Production Plans at Fermilab
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Stress and cool-down analysis of the cryomodule Yun He MLC external review October 03, 2012.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Mechanical Design of Main Linac Cryomodule (MLC) Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Tim O’Connell, Ralf.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Installation of the T600 at Fermilab CSN2, September 22,
Overview of Main Linac Cryomodule (MLC)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Overview of Main Linac Cryomodule (MLC) Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
LCLS-II Cryomodules Production at Fermilab Tug Arkan, 7/17/2014.
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Hao Guo LINAC Department Institute of Modern Physics.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
All Metal Gate Valve from VAT
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Installation of the T600 at Fermilab Fermilab, February 15,
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Installation of the T600 at Fermilab
Field Emission Minimization for LCLS-II
Stress and cool-down analysis of the cryomodule
at STFC Daresbury laboratory
Ti/SS transitions A.Basti INFN-PISA*
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
The 11T cryo-assembly: summary of design and integration aspects
UK RFD Pre-Series cryomodule
IMP Cryomodule Assembly and Alignment
IHEP Cryomodule Status
Cryomodule Assembly Plan
SNS PPU Cryomodule Space Frame
SNS PPU Cryomodule Thermal Shield & MLI
SC1R Cold Box PDR Assembly Sequence
SNS PPU Cryomodule Design Overview
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
JLAB CHL 2K COLD BOX REPLACEMENT
Presentation transcript:

Cryomodule Interconnect Design Yun He, Tom Peterson, Yuriy Orlov, Tug Arkan July 29, 2015

2 Outline Cryomodule Interconnect Design, 29 July )Cryomodule interconnect overview 2)Requirements and challenges 3)Interconnect design 4)Installation quality control 5)Shipping configurations 6)Things-to-do upon module delivery Additional information

3 Cryomodule Interconnect Design, 29 July ). Cryomodule Interconnect Overview  Inter-module unit  Module ends and inter-module kit (parts list)  Module layers and interconnect joints  LCLS-II tunnel 2). Interconnect Requirements and Challenges  Allowance for material differential thermal contractions  In-situ welding & pressure piping code compliance  Particle free UHV to preserve cavity cleanliness

4 Cryomodule Interconnect Overview Cryomodule Interconnect Design, 29 July 2015  A bellows inter-connect unit (850.0 mm) between two modules  Outer shell of the inter-connect unit can slide over the vacuum vessel to allow space for welding of six cryogenic pipes in-situ Beam

5 Cryomodule Interconnect Overview -- Module Ends & Inter-module Kit Cryomodule Interconnect Design, 29 July 2015 Upstream module Downstream module Inter-module kit Vacuum vessel inter-module bellows unit, F , leak checked, but no blank flanges provided Thermal shield, F & F HGRP, F Bellows and spools for cryogenic pipes (Qty. 5), F HOM absorber, F MLI blankets (10 layers to 2K-8K components, 30 layers to 35-55K) Gaskets, fasteners, intercept straps

6 Cryomodule Interconnect Overview -- Module Layers and Interconnect Joints Cryomodule Interconnect Design, 29 July 2015 Joint of each sub-systemType HGRPIn-situ welding Cryogenic pipes (5 lines)In-situ welding Beamline tubeParticle free UHV flange joints Thermal shieldGood thermal conduction Vacuum vesselVacuum O-ring flange joints 5 Cryogenic pipes 2 joints for each line

7 Cryomodule Interconnect Overview LCLS-II Tunnel Cryomodule Interconnect Design, 29 July 2015 Tight space on wall side

8 Interconnect Requirements and Challenges -- Allowance for Material Differential Thermal Contractions Cryomodule Interconnect Design, 29 July  Cold-mass and all the cryogenic pipes are fixed in position at the central post  When cold, these components will contract in length vs. vacuum vessel  Interconnect bellows on cryogenic pipes  to mechanically decouple the modules and allow for thermal contraction or expansion during thermal cycling ComponentMaterialTemperatureΔL/LΔL at inter-connection HGRP, cryogenic circuitsSS300K – 2K0.319%37.5 mm Thermal shield, 55K extruded pipe Al 6061-T6300K – 40K0.350%40.0 mm

9 Interconnect Requirements and Challenges -- In-situ Welding & Pressure Piping Code Compliance Cryomodule Interconnect Design, 29 July 2015  Space for welding is very tight  Leak checking for a long string  Pressure testing (or X-ray inspection) for full penetration welding

10 Interconnect Requirements and Challenges -- Particle Free UHV to Preserve Cavity Cleanliness Cryomodule Interconnect Design, 29 July 2015  Beamline vacuum needs to preserve particle cleanliness of the cavity surfaces  When making beamline connections between the modules, similar cleaning and assembly procedures as those performed for the cavities in the particle free clean rooms should be applied  A portable softwall cleanroom (class 10) is required Portable clean room used at XFEL

11 Cryomodule Interconnect Design, 29 July ). Cryomodule Interconnect Design  Interconnect pipe dimensions and X-Y coordinates  HGRP interconnect  Cryogenic pipes interconnect  HOM absorber – beamline inter-module unit  Thermal shield interconnect  Vacuum vessel interconnect

12 Cryomodule Interconnect Design -- Interconnect Pipe Summary Cryomodule Interconnect Design, 29 July 2015 PipesDrawing #DescriptionMaterial & sizeCoordinates (X, Y) [mm] Operating pressure [bar] Design Pressure [bar] BF HGRPSS316L, 300 ID/312 OD [mm] 0, warm 4.0 cold AF K supplySS316L, 2” SCH10219, CF K supply225.5, DF K return-252, EF K supply355, FF K return-367,  Pipe X-Y coordinates are same as those in XFEL module  XFEL drawing: DESY 0_06_8205_0_000 (module 3 plus, 10/4/06)  LCLS-II drawing: F  Welding heads/toolings used on XFEL should work for LCLS-II module  LCLS-II module has more space than XFEL module No 5 K thermal shield 2-phase pipe and warm-up/cool-down pipes are closed in each module  At interconnect region, welding will be SS-SS tubes of identical sizes for all five pipes A,C,D,E,and F  Pipes D & F are Al pipes with SS-Al transitions

13 Cryomodule Interconnect Design -- HGRP Interconnect Cryomodule Interconnect Design, 29 July 2015 HGRP inter-connect pipe (F ) HGRP bellows unit on downstream module Bellows restraining clamps for protection during handling and welding  will be removed after inter-connect welding  Made out of four Al quarter-rings (F )  A stainless steel pipe is to be welded between the adjacent HGRPs

 A stainless steel bellows insertion is to be welded between the adjacent pipes  Bellows will be compressed at installation and is expected to expand at cold 14 Cryomodule Interconnect Design -- Cryogenic Pipes Interconnect Cryomodule Interconnect Design, 29 July 2015 Cryogenic piping bellows insertion Al-SS transition to Al extruded pipe Part of the cryomodule assembly Bellows insertion  Face-to-face length of pipe ends: 200.6mm  (F )  Axial shift: ±30mm, lateral shift: ±5mm  Angular: ±1° SS316L 2” SCH10 pipe (all 5 lines)

15 Cryomodule Interconnect Design -- HOM Absorber – Beamline Inter-module Unit Cryomodule Interconnect Design, 29 July 2015 HOM absorber Pump-out port Gate valve of downstream cryomodule Gate valve of upstream cryomodule Cross-section of HOM absorber (F , mm long) Ceramic Copper stub To 55 K  Beamline terminates at each end with an all-metal GV  A HOM absorber between the modules  Pump-out port allows pump-down and leak-check of this interconnect section before it is valved in to the cavity strings Rotatable flange Handling fixture

16 Cryomodule Interconnect Design -- Thermal Shield Interconnect Cryomodule Interconnect Design, 29 July 2015 Bolted joints on this end Good thermal contact Thermal shield inter-connect sheets (F & F ) Discontinuity of direct thermal connection from 55 K cooling line This end slides over the thermal shield of the downstream module (50 mm overlap)

17 Cryomodule Interconnect Design -- Vacuum Vessel Interconnect Cryomodule Interconnect Design, 29 July 2015 O-ring to seal Between inter-connect unit and upstream module O-ring to seal between downstream module and slip flange O-ring to seal Between inter-connect unit and downstream module  Three O-ring seals (EPDM material for the seal) to complete the connection between inter-connect unit and cryomodules to turbo pump station Via a gate valve to roughing pump/vacuum gauge Via right-angle valves

18 Cryomodule Interconnect Design, 29 July ). Installation Quality Control  Assembly sequence  Pre-assembly preparations and tools/fixtures  Cryogenic lines pipe welding  Cryogenic lines leak checking  Cryogenic lines pressure testing  Particle free UHV practice  Close-out of the cryomodule

19 Installation Quality Control -- Assembly Sequence Cryomodule Interconnect Design, 29 July 2015  Follow the assembly sequence that has been developed at XFEL:  welding of HGRP  welding of cryogenic pipes  beamline connection  thermal shield connection  Closing-out of vacuum vessel

20 Installation Quality Control -- Pre-assembly Preparations and Tools/Fixtures Cryomodule Interconnect Design, 29 July 2015  Keep MLI and the insulating vacuum space dry  Fermilab suggests: a continuous boiled off nitrogen gas (or dry air if ODH concern) purge for insulating vacuum space during storage and preparation for installation  Dry air purge is required to prevent degradation of the lubricant used on tuner components  XFEL uses shower caps and desiccants  All electrical connectors should be properly shorted before welding operation Connector shorting checklist will be created according to the instrumentation list Sub-systemTools and fixtures HGRP inter-connect ​ Bellows restraint unit Rubber shell for leak checking Cryogenic pipe inter-connect ​ Bellows restraint unit Aluminum jacket for leak checking ​ Beamline inter-connect ​ Portable clean room (ISO 4, Class 10) HOM absorber bellows restraint unit HOM absorber assembly lifting fixture Holder for gaskets (particle free cleaned, individually wrapped) Assembly hardware ​ Thermal shield inter-connect ​ Vacuum vessel inter-connect

21 Installation Quality Control -- Cryogenic Lines Pipe Welding Cryomodule Interconnect Design, 29 July 2015  For a good quality of welding, the tube ends must be aligned well with the general requirement of a gap less than 5 percent of the wall thickness  The actual (as built module) X-Y locations of each pipe will provided by partner labs for each cryomodule  Mis-alignments of the pipes could be accommodated by the joining bellows quite flexible with an axial shift of +/- 30 mm and a lateral shift of +/-5 mm  A certified welder and qualified welding procedure is required  Using an automatic orbital welding machine, with a custom-made tractor welding head for the HGRP line and a standard closed welding head for other pipes  An boiled off argon gas environment Inside & outside of the pipes for welding

 XFEL uses the clam shell for reverse leak checking the welds  Filling the cryo pipes internally with helium (pressure no more than 0.5 bar gauge) will help to avoid filling the tunnel with helium and helps to get a better minimum detectable leak rate  Helium contaminated cryo pipes from testing will not be easy to pump down and leak check with good MDL in a short time frame  However, if there is a leak, it is impossible to pinpoint the leak with this method  No leak shall be detectable on the most sensitive scale of the leak detector with a minimum sensitivity of 2x10 -9 mbar×liter/sec 22 Installation Quality Control -- Cryogenic Lines Leak Checking Cryomodule Interconnect Design, 29 July 2015 XFEL Rubber shell for leak checking HGRP weld XFEL Aluminum jacket for leak checking cryogenic pipes

23 Installation Quality Control -- Cryogenic Lines Pressure Testing or X-rays Cryomodule Interconnect Design, 29 July 2015  To comply with pressure piping code, post welding test: pressure tests or X-ray inspection  For XFEL module: X-ray inspection all lines  For LCLS-II module: X-ray inspection HGRP or wait to do pressure test after insulating space is under vacuum  Even though the HGRP was pressure tested during fabrication to 6 bar, SLAC cannot pressure this pipe to 6 bar post interconnect welding, because it shares the common helium circuit with the SRF cavities.  When the beamline of the cavities is under vacuum(Pbeam=0 bar abs), as CM received at SLAC, the HGRP cannot be pressurized to 2.3 bar differential (3.3 bar ABS) unless insulating vacuum is pumped down. If not, the cavities frequency will be disturbed permanently  All other 5 cryogenic pipes can be pressure tested, with filtered nitrogen gas from a dewar for 30 min, with the test pressure: 1.1 x MAWP PipesDescriptionOperating pressure [bar]Design Pressure [bar] BHGRP warm, 4.0 cold A2.2 K supply C4.5 K supply D5.5 K return E35 K supply F55 K return

24 Installation Quality Control -- Particle Free UHV Pumping/Venting Practice Cryomodule Interconnect Design, 29 July 2015  XFEL design  Prevent particles from entering the vacuum system or moving in the system  Allows automatic pump-down/venting Beamline pump port Diffuser  Filters particles > 3 nm, w/ SS filter  Allows gas flow in 360 °  Gas flow uniformly Mass Flow Controller  soft start, aperture increased as pressure decreased  w/ particle filter; Charcoal filter if use a N2 gas bottle

25 Installation Quality Control -- Close-out of the Cryomodule Cryomodule Interconnect Design, 29 July 2015  MLI blankets are installed  10 layers on 2K-8K components  30 layers on 35K-55K parts  MLI staggering scheme (a zigzag order) shall be finalized  Intercept straps are installed  HOM absorber to 55K pipe  Continuity of thermal insulation must be ensured in the inter-connection regions  Good thermal contact at inter-connection joints  Make three O-ring joints  Light apiezon grease is permitted  Confirm all tools, scrap, and spurious materials are out of the insulating vacuum space  Leak check new flange joints

26 Cryomodule Interconnect Design, 29 July ). Shipping Configurations  Ends of cryogenic pipes  Ends of beamline tube  Insulating Vacuum 6). Things-to-do Upon Module Delivery  Insulating Vacuum  Beamline Vacuum

27 Shipping Configurations -- Ends of Cryogenic Pipes Cryomodule Interconnect Design, 29 July 2015  On-going discussions on whether or not the flanges should be cut off at PLs  It takes one hour to cut one end at XFEL  Tube ends need good fitting  Needs orbital pipe cutter(3 sets vs. 1 set at SLAC, may need to re-do end finishing)  Flanges provide shipping protection  Current shipping fixture is designed with flanges on

28 Shipping Configurations -- Ends of Beamline Tube (Curtis Baffes) Cryomodule Interconnect Design, 29 July 2015  After the cryomodule testing is completed at partner labs, transportation tees with vacuum devices will be installed at each end of the beamline  The beamline will be shipped under vacuum, with the vacuum gauges powered on but no active pumping during shipment  The downstream GV is open to the spool which contains two vacuum gauges, while the upstream GV will be closed (F ) (F ) Right-angle valve cover Lock

29 Shipping Configurations (Mike McGee) -- Insulating Vacuum Cryomodule Interconnect Design, 29 July 2015  Insulating vacuum space will be backfilled with boiled off nitrogen to 5 psig (20 psia) positive pressure for shipping  End caps to keep and withstand the positive nitrogen pressure inside the vessel, as well as to support the HGRP at the ends

 Shipping end caps need to be removed and returned to partner labs  Keep MLI and the insulating vacuum space dry  Fermilab suggests: module purge caps should be installed to allow continuous boiled off nitrogen gas (or dry air) purge for insulating vacuum space during storage and preparation for installation  Nitrogen gas purge is required to prevent degradation of the lubricant used on tuner components  XFEL uses shower caps and desiccants 30 Things-to-do Upon Module Delivery -- Insulating Vacuum (Mike McGee) Cryomodule Interconnect Design, 29 July 2015 Loosen all screws first before removing the assembly  Ten bolts hold and expand the swage feature within the HGRP end  Insert rod is secured externally after attaching the cap

31 Things-to-do Upon Module Delivery -- Beamline Vacuum (Curtis Baffes) Cryomodule Interconnect Design, 29 July 2015  Number of the valve open-and-close cycles of the beamline vacuum should be minimized  to prevent particles from being introduced into the cavity region  In case a pump-down is needed during the storage, follow the steps below:

32 Additional Information Cryomodule Interconnect Design, 29 July 2015  web page shared with SLAC  Inter-connect assembly general procedure ED