ILC Undulator Based Position Source Target System Wei Gai, HEP, ANL TB meeting 8/5/2014.

Slides:



Advertisements
Similar presentations
Target Wheel Prototype Progress LC-ABD / LCUK – Apr Leo Jenner & Ian Bailey Cockcroft Daresbury Laboratory.
Advertisements

Photon Collimation For The ILC Positron Target Lei Zang The University of Liverpool Cockcroft Institute 24 th March 2007.
A Study of Mechanical and Magnetic Issues for a Prototype Positron Source Target The positron source for the International Linear Collider (ILC) comprises.
Ian Bailey University of Liverpool / Cockcroft Institute Target Design and Photon Collimator Overview EUROTeV: WP4 (polarised positron source) PTCD task.
ILC Positron Source Update Wei Gai Posipol ILC RDR baseline schematic (2007 IHEP meeting) Collimator OMD 150GeV e- ~147GeV e- Target TAP (~125MeV)
Radiopharmaceutical Production Target Foil Characteristics STOP.
Simulations with ‘Realistic’ Photon Spectra Mike Jenkins Lancaster University and The Cockcroft Institute.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
Ian Bailey University of Liverpool / Cockcroft Institute UK EUROTeV Photon Conversion Target Project EUROTeV: WP4 (polarised positron source) PTCD task.
Ian Bailey Cockcroft Institute/ Lancaster University October 30 th, 2009 Baseline Positron Source Target Experiment Update.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
 Stephen Brooks / UKNF meeting, Warwick, April 2008 Pion Production from Water-Cooled Targets.
Thu Oct 30ILC Positron Workshop, DL1 Positron Target Prototype – Current Status Leo Jenner Jim Clarke, Ian Bailey Ken Davies, Andy Gallagher, Lei Zang.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
The undulator based ILC positron source activities at ANL
ILC Rotating Target - Active Sliding Contact Cooling Wei Gai, Manoel Conde, Wanming Liu, Scott Doran, Vic Guarino, George Fenske (ES), Robert Erck (ES),
Radiation Cooling of the ILC positron target LCWS 2014, Belgrade, Serbia 7 th October 2014 Sabine Riemann, DESY, Peter Sievers, CERN/ESS, Andriy Ushakov,
Fouling Factor: After a period of operation the heat transfer surfaces for a heat exchanger become coated with various deposits present in flow systems,
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
AIR BEARING SYSTEM.
IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
Key luminosity issues of the positron source Wei Gai.
Positron Source General Update M. Kuriki(Hiroshima U./KEK) ALCW2015, April 2015,Tsukuba/Tokyo, Japan.
Status of target and photon collimator work for polarized e+ LCWS 2014, Belgrade, Serbia 7 th October 2014 Sabine Riemann, Friedrich Staufenbiel, DESY.
Current standing of the undulator based ILC positron source Wei Gai AWLC 14 FNAL, May
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
Ian Bailey University of Liverpool / Cockcroft Institute UK Target Update EUROTeV: WP4 (polarised positron source) PTCD task I. Bailey, J. Dainton, L.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
Radiation Cooling of the ILC positron target ALCW 2015, KEK, Tsukuba, Japan 24 th April 2015 Felix Dietrich (DESY), Sabine Riemann (DESY), Peter Sievers.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Meeting 1: Oxford ILC GDE Activities Update and Undulator Scheme Status.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
Welcome and Introduction to the Workshop Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 – 31.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
Status: Cooling of the ILC e+ target by thermal radiation LCWS 2015, Whistler, Canada 3 rd November 2015 Felix Dietrich (DESY), Sabine Riemann (DESY),
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
F.Staufenbiel / EuCARD 2 / Heat load and stress studies of the ILC collimator G. Moortgat-Pick 1;2 S. Riemann 2, F. Staufenbiel 2, A. Ushakov.
Positron Source Target Update Tom Piggott Jeff Gronberg Lisle Hagler Dain Holdener Marty Roeben This work was performed under the auspices of the U.S.
October 9th, 2007 Daresbury – Positron Kick-Off Meeting Slide 1 Remote Handling Vinod K. Bharadwaj SLAC October 9th, 2007.
Photon Conversion Target Wheel Eddy Current Simulations - Update Ian Bailey and Ayash Alrashdi Lancaster University / Cockcroft Institute.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
Oct. 6, ILC Positron Source Group Meeting Short report by S. Riemann September 2006, RAL.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Design Principals for ILC- Positron Targets Peter Sievers-CERN-ESS POSIPOL 2013,Argonne P.Sievers/POSIPOL131.
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim ILC GDE Meeting DESY May 30 – Jun2, 2007 Work performed for.
Photon Collimator and Conversion Target Status I. Bailey University of Liverpool / Cockcroft Institiute Cockcroft Institiute.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
POSIPOL 2016 at LAL/Paris, Sept Peter Sievers-CERN
Sliding Contact Cooling
ILC Active sliding contact cooling Target R&D update
A Positron Target Concept for the ILC
Pair-Production Target
Positron Update ILC R&D Meeting/ March 12, 07 VB & JCS
Rotation Target R and D of ILC E-driven source
Masao KURIKI (Hiroshima University)
Heat load at the ILC positron target and collimator system
CLIC Undulator Option for Polarised Positrons
ILC/CLIC e+ generation working group
Future Work Plan and Action Items
Beam Dump outline work plan (UK perspective)
Thermal analysis Friction brakes are required to transform large amounts of kinetic energy into heat over very short time periods and in the process they.
ILC RDR baseline schematic (2007 IHEP meeting)
Summary for the Sources working group
Superbeam Horn-Target Integration
Design of Seals.
Presentation transcript:

ILC Undulator Based Position Source Target System Wei Gai, HEP, ANL TB meeting 8/5/2014

What we have accomplished in the last decades:  In the last decade, many technical issues for the undulator based positron source have been resolved:  End to end beam dynamic simulations, including spin tracking by several institutes.  Constructed and tested a prototype superconducting undulator, total 4 meter long, to the specified field (K=0.92) period (l=1.15 cm). No show stopper identified.  Calculation on the target heating and shocks from incoming gamma beam shows no major issues identified from the studies.  A fast spinning target wheel constructed and tested (2000 rpm) at UK with no show stoppers identified.  Major components such as OMD, normal conducting pre-accelerator are tested to satisfactory.  A much simplified layout of the remote handling system has been developed, and with much cost reduction from the early design.  Interfacing with damping ring studied and no issues arisen. 8/27/2014 2

The ILC TDR baseline target system 3 8/27/2014 The 1ms ILC photon beam pulse would fracture a stationary solid titanium target. We have never been able to design a window between the target and the positron capturing system. We have to remove the power deposited in the target.

Technical challenge and risk of the baseline target -Vacuum seal 8/27/ Risks: Test of ferrofluidic seal at LLNL has identified the potential vacuum seal problem of the baseline target system Limited life time of a vacuum seal (short time survival, but long term > a few weeks with vacuum spikes) and no further experiments on other type of seal for improved study due to lack of funding. No radiation damaging testing yet and cooling water impact on wheel dynamics.

Technical challenge and risk of the baseline target -stress 8/27/ Simulations done by DESY group have identified another potential problem with the wheel support.

An example of a suggested modification version:  Keys: –Eliminate the rotating vacuum seal by putting the whole target system in vacuum chamber. –Eliminate the cooling water in any moving parts; heat would be removed by contacting conduction cooling from spring loaded metal pads. –Support shaft using the magnetic bearings. 8/27/2014 POSIPOL 2014, ICHINOSEKI CITY, IWATE, JAPAN, AUGUST ,

Inside the chamber 8/27/2014 POSIPOL 2014, ICHINOSEKI CITY, IWATE, JAPAN, AUGUST , Target wheel, geometry may be optimized for cooling efficiency and wheel balance Cooling pads and supporting structures Magnetic bearing on both sides Your text here Cooling water manifolds are not showing. Flux concentrator and accessories are not included in this conceptual illustration.

Cross section view 8/27/2014 POSIPOL 2014, ICHINOSEKI CITY, IWATE, JAPAN, AUGUST , Target wheel, geometry may be optimized for cooling efficiency and wheel balance Cooling water manifolds are not showing. Flux concentrator and accessories are not included in this conceptual illustration. Magnetic bearing on both side Vacuum compatible motor

Vacuum compatible electrical motor 8/27/ One needs to remember that magnetic motor does not require lubrication itself as long as bearings are lubricated correctly. We consider a motor drive that is oil free and maintenance free. Through the web search, we found the MiTi®’s 32 kW, 60,000 rpm Oil-Free, High- Speed Motor.

Magnetic bearing 8/27/ The principle of magnetic bearing is simple, it has been used extensively in aerospace industry. Active bearing basics. Electromagnetic fields support moving parts without contact; servo control system stabilizes suspended element by increasing supporting force in direction opposite that of any displacement, to restore correct position.

The friction between target wheel and cooling pad  The friction between target wheel and cooling pad can be small if vacuum compatible lubricant can be used, example: Tungsten Disulfide (WS2).  Tungsten Disulfide (WS2) or Tungsten Disulphide: –extremely slick, dry film lubricant coating. WS2 has an extremely low coefficient of friction of lower than that of Teflon, Graphite, or Molybdenum Disulfide (MoS2). –The film is remarkably durable compared to many other lubricant materials and can withstand tremendously high loads of over 300,000 psi! WS2 has unsurpassed performance properties for lubricity, non-stick, low drag, wear life, and load rating. –WS2 has an electrical conductivity in the order of (ohm.cm) -1 [1]. With a half micron coating, the electrical/thermal resistance introduced by the coating will be negligible 8/27/ [1]. P. A. Chate, D. J. Sathe and P. P. Hankare, Electrical, optical and morphological properties of chemically deposited nanostructured tungsten disulfide thin films. Appl Nanosci (2013) 3:19–23, DOI /s

Proposed Parameters  The ILC target rim has area of > 1000 cm^2 and will be coated with WS2, so is the pads.  The contacting area is assumed to be 1/3 of the target wheel with a contact pressure of 1N/cm 2. The heat generated by the friction is estimated to be 3kW.  If Tungsten(173 W/m/K) is used for the cooling pads, then the temperature at the surface of target will be estimated at about 38 K above ambient for 20kW power removal.  The cooling pads will have cooling channel inside and connected with cooling water manifolds. As the cooling pad is stationary, a vacuum compatible cooling water manifold should be easily implemented. 8/27/

R&D issues and Risks  R&D issues: –Design a vacuum chamber that can house 1 meter wheel with cooling system implemented on the outer wall and pads. –Purchase a vacuum compatible motor capable of 10 kW, and 4000 rpm. –A set of magnetic bearing to support the shaft with TI wheel. Or use the WS2 coating if ball bearings are used. –Gain experience on WS2 coating.  Risks: Based the data we find, we could not identify any major risk associate with the design. However, we would like to prototype the system on the full scale to gain the experiences on –Lifetime of the WS2 coating; –Vacuum compatible motor selections; –Heat removal from a high vacuum chamber; –Stabilization of wheel with magnetic bearing/WS2 coated bearing; –Eliminate any unwarranted concerns on the undulator based source 8/27/

Thermal resistance test of uncoated copper surface. 8/27/

Summary  A new conceptual design for the ILC undulator based positron source conversion target is presented to solve the problems with the baseline target wheel.  Key components and technology for the new design have been identified  The initial study has not found any major risk with the new design  Some initial tests have been planned and are carrying out.  Full scale prototyping is in plan  Hopefully, we’ll have a full featured prototype in 3 years with the contingency of enough resources. 8/27/