Summary of Deliverables & reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Done & to be.

Slides:



Advertisements
Similar presentations
Supported by: Joint MSc curriculum in software engineering European Union TEMPUS Project CD_JEP Module SE-C-01 Requirements Engineering Experiences.
Advertisements

UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
Paul Rubinov TriP-t & AFEII status. AFE and CFT 9 o K VLPC (x512) AFE DISCRADC Discriminator output every 396 nsec for L1 Amplitude signal readout for.
Trigger and online software Simon George & Reiner Hauser T/DAQ Phase 1 IDR.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
G. Cosmo & M.G. Pia. The Training Kit Project Gabriele Cosmo & Maria Grazia Pia Geant4 Workshop Paris, October 2000
All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
FTK poster F. Crescioli Alberto Annovi
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
CSE 436 Software Engineering Workshop Course Overview Christopher Gill CSE 436 January 2007 Department of Computer Science and Engineering.
1 National Research Council - Pisa - Italy Marco Conti Italian National Research Council (CNR) IIT Institute Executive board meeting 2nd MobileMAN Workshop.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
OUTLINE TODAY (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings.
The Macro Design Process The Issues 1. Overview of IP Design 2. Key Features 3. Planning and Specification 4. Macro Design and Verification 5. Soft Macro.
Documentation As a Tool for Training and Communication Sara Spiegel AJL NYMA Cataloging Workshop 2005.
FTK AM boards Design Review P. Luciano, N. Biesuz, W. Billereau, J.M. Combe, S. Citraro, D. Dimas, S. Donati, C. Gentsos, P. Giannetti, K. Kordas, A. Lanza,
CSE Senior Design II Day 1: Getting Organized Spring 2015 Instructor: Manfred Huber.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
NSHIELD Project Meeting Brussels - 15 Feb 2012 Luigi Trono.
Technical Workshop 5-6 November 2015 Alberto Di Meglio CERN openlab Head.
Fabiola Gianotti, 13/05/2003 Simulation Project Leader T. Wenaus Framework A. Dell’Acqua WP Geant4 J.Apostolakis WP FLUKA Integration A.Ferrari WP Physics.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Magnoni Luca Early Stage Researcher WP5 - ATLAS.
JRA 1 Status Tobias Haas DESY 19 December EUDET SC Meeting, 19 December Brainstorming, 3/4 DESY 15 people present, 3 via VRVS 15 people present,
CSE Senior Design II Day 1: Getting Organized Spring 2012 Instructor: Mike O’Dell.
FTK AM boards Design Review P. Luciano, N. Biesuz, W. Billereau, J.M. Combe, S. Citraro, D. Dimas, S. Donati, C. Gentsos, P. Giannetti, K. Kordas, A. Lanza,
FP7-People-IAPP-2012 FTK - Project number: Paola Giannetti – INFN & University of Pisa 1 st EU Mid-Term Review meeting Brussels, November 7 th,
OUTLINE (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings (scientific.
Software for tests: AMB and LAMB configuration - Available tools FTK Workshop – Pisa 13/03/2013 Daniel Magalotti University of Modena and Reggio Emilia.
Project number: Andreas Sakellariou – PRISMA ELECTRONICS 1 st EU Mid-Term Review meeting 7 November 2014.
Management: (1) Next GA, EB and trainings (2) Summary 2013 – Planning 2014 (3) AUTH recruitment.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
Queen’s University Belfast – Institute of Lifelong Learning 4th ALPINE Project Meeting: University of Tartu, Estonia Adults Learning and Participation.
IAPP-FTK Status Report b e b b   e   hb b  1.5 MEuros 4 Years 6 Institutions.
Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Status of FTK work IMOU NEWS & Future steps TDR with.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Calliope-Louisa Sotiropoulou FTK: E RROR D ETECTION AND M ONITORING Aristotle University of Thessaloniki FTK WORKSHOP, ALEXANDROUPOLI: 10/03/2014.
IAPP - FTK workshop – Pisa march, 2013 Marco Piendibene – University of Pisa & INFN FTK and the AM system.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
The Monitoring Problem Firmware for the Lost Synchronization Detection Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name:
Summary of Deliverables & Reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Outreach :
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Costo ~ 600 kE ATLAS: Frascati, Milano, Pavia, Pisa CMS: Firenze, Padova, Perugia, Pisa, Trieste Applicazioni: FTK Phase II, L1 Track Trigger, outside.
GUIDO VOLPI – UNIVERSITY DI PISA FTK-IAPP Mid-Term Review 07/10/ Brussels.
14.4. Readout systems for innovative calorimeters
Firmware development for the AM Board
Deliverables, final review and final reporting
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
IAPP - FTK workshop – Pisa march, 2013
FTK: update on progress, problems, need
Saverio Citraro PhD Student University of Pisa & I.N.F.N. Pisa
The Associative Memory – AM = Bingo
LAMB: Hardware & Firmware
FTK infrastructure in USA15 Status and plans for 2015 A
Project definition and organization milestones & work-plan
Summary of Deliverables & reached Milestones
Design of the 64-channel ASIC: status
AM system Status & Racks/crates issues
SEEDS Kick-off meeting May 6, Lausanne Bojana Tasic Renate Kunz
Pending technical issues and plans to address and solve
Secondments & tasks Management meetings – Calendar
Annual Report Instructions
Early Stage Researcher: Panos Neroutsos
WP5: Dissemination, studies, web portal and tools
CMS RPC Endcap RE1 Status Report
9/18/2018 Department of Software Engineering and IT Engineering
BioMedBridges – Work Packages 2 & 12
KICK OFF meeting - project presentation
Welcome to Your New Position As An Instructor
Presentation transcript:

Summary of Deliverables & reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Done & to be done Outreach

History Demonstrator: AMBFTK, LAMBSLP and AMCHIP04 (14 mm^2); produced and tested (see Kostas talk) It works but the Amchip package is not ok for large chip (>1 cm 2 ) → new package, new IP core, new serialized I/O See Saverio talk: → New AMBSLP PQ208 OLD → New LAMBSLP in two versions: 1. Mini_LAMBSLP for Miniasic Amchip to test the IP core 2. LAMBSLP for final BGA package for AMchip05 and 06. BGA 23x23 NEW

Milestone no. name WP Delivery Comments Leader date M.4.1. Demo general simulation ok UniPisa M6 Demonstrator simulated architecture ok basical AMBFTK simulation OK, see tests described by Kostas Kordas M.1.1. Slp2 prototype ok at Priele PRIELE M12 SLP2 prototype validated at PRIELE Ongoing work (see Marco’s and Saverio’s talks) M.1.2. Prototypes Atlas Review PRIELE M12 Atlas evaluation of FTK prototypes M.2.1. Demonstrator ok at Caen CAEN M12 Demonstrator runs flawlessly at Caen Integration with AUX card Deadlines under the corner: Milestones in 2013 AMBoard (a) SSB: Final Fit-HW DF Proto AUX

OUTREACH MILESTONES M.7.1.-M.7.3.Open Days results verificationAUTH M8, M20,M32 M.7.4. –M.7.6.WorkS. days results verification AUTH M6, M18,M30 JULY M.7.7. –M.7.9.Summer schools results AUTH M7, M19,M31 Summer School: VHDL language and ISE Xilinx CAD July 1 – Workshop DAY: July ? IAPP Open day: inside the “Department congressino” FTK communicates to students April

SUMMER SCHOOL Lessons and exercises immediately after To complete a project (see figure) and simulate it Lab section the last day See the school web site for details: Teacher: Calliope-Louisa seconded from AUTH to Pisa Teacher assistants: Marco Piendibene to be seconded to Priele Daniel Magalotti (INFN-PG) : interested to recruitment Between Students: Kostas Kordas seconded from AUTH to Pisa Dimitrios Dimas seconded from Priele to Pisa Guido Volpi (CERN): interested to recruitment Other students: Jafar Shojaii (Uni. Milan), Cinzia Decesare (Uni. Milan), + altro Milan, Takashi Kubota (Uni. Melbourne), Mariano Falcitelli (CNR Pisa), Emanuele Raffaele (studente ingegneria, S. Anna Pisa), + altra ragazza Uni Pisa (chi e’?)

The School: Great success For lunch all together At the end: a document for each one The teaching team

Workshop Day Seminars to students for: – Trigger in HEP – FPGA applications outside HEP – 48# Open IAPP Day Open LAB – posters on FPGA-based Supercomputer – Trigger in HEP & FPGA applications outside HEP – FPGA power: parallelism, pipelining – Available FPGA CAD station for students: how powerful it is! WHEN? We decide for Friday July for Workshop day and Continue the spring IAPP DAY (see next) ……..

Calliope from AUTH Andreas from PRIELE Marco from UNIPI Simone from UNIPI The FTK group at the IAPP Poster during the “UNIPI congressino” Federico from UNIPI & the students FIRST OUTREACH ACTIITY: April IAPP day

Del. no.Deliverable Title Nature Dissemination level Delivery date D.2.1. VS infrastructure at CAEN for FTK demonstrator integration R RE M6 D.4.1. FTK Demonstrator detailed simulation R RE M9 D.4.2. Test Vectors for the FTK demonstrator R RE M10 D.2.2. FTK demonstrator fully integrated with old power supply Pub PU M12 D.1.1. SLP2 prototype constructed at PRIELE Pub PU M12 D.6.1 Test bench R RE M12 D.7.1. IAPP project open days R PU M7, M19, M31, M43 D.7.2. Workshop days R PU M5, M17,M29, M41 D.7.3. Summer school weeks R PU M6, M18,M30, M42 D.7.4 D.8.3 World wide web site for dissemination R PU M6, M18, M30, M48 what to report? D.8.1. FTK Workshops R RE M1, M13, M30, M46 D.8.2. Trainings (next is CAEN)R RE M1, M5, M9,M19, M29, M47 Let’s do it in July! DELIVERABLE SUMMARY ASK PO about Deliverables classified ad Report.

OUTREACH SCHEDULE

CONCLUSIONS TIME IS RUNNING FAST A LOT OF REPORTS TO PREPARE (MAY BE) OUTREACH AND TRAININGS ONGOING with high rate HOWEVER WE HAVE IN HANDS THE EXPECTED RESULTS!