U.S. General Services Administration EPA New England Regional Laboratory Best Practices and Lessons Learned John F. Buckley, Project Manager

Slides:



Advertisements
Similar presentations
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
Advertisements

Ft. Lauderdale Region Counties: Broward.
Jim McElwain College Architect SETTING UP A LABORATORY.
UKSPA Conference 2008 Laboratories for the Future East Midland Conference Centre, University Park, Nottingham Incubator Buildings in Science Parks – special.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Debby Valin FDEP - Central District. What is P2 Why do P2 How to P2 Means to P2 Continuing with P2 P2 in Buildings P2 in Offices P2 in Operations and.
Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Sustainable solutions in engineering Introduction of Building Industry in BC Presented by: Philip Fung, M.Sc., P.Eng., LEED AP Tony Tang, P.Eng., LEED.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Presented by: Jane Briggs and Karen Mitchell October 11, 2007 The New LEED Building at Shady Grove.
SUSTAINABLE METHODS AND TRENDS Sebastian Eilert, AIA, LEED AP October 9, 2007.
Hope VI Residents Deserve Green Housing Affordable, Healthy Home Design Choices.
Sustainable Design & Construction at Yale University July 2009.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Sustainable Design Energy Sciences Building. 2 Sustainability Regulations DOE final rule [10 CFR part 433] (30% better than ASHRAE) DOE Order 430.2b:
The Role of Tenant and Property Operations in Implementing Sustainable Practices Public Building Services October. 17, 2007 Om Taneja PBS Tenant and Property.
BECOMING GREEN Santa Margarita High School Academic Building.
Houston Independent School District John F. Kennedy Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS The John F. Kennedy Elementary School is a replacement.
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
A Sustainable Residential Design Project Project 16 DS 413: Design Studio 413 May 9, 2012.
1 Ohio School Facilities Commission Green Schools Initiative Presentation #2.
Green Building Design and LEED Certification ACMA 2008 Summer Conference 2008.
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
Massachusetts High-Performance Green Schools – Case Study Whitman-Hanson Regional High School Library & Media Center. This projects features include utilizing.
Green Building Residential Construction
The Path to Net Zero Energy Buildings Arkansas Chapter ASHRAE February 2008 Bill Harrison.
Net-Zero Energy Classroom! Lets Design a….  Active Solar – PV (Photovoltaic) Panels convert sunlight into electricity.  Wind Power – When the wind blows,
Green Building Demonstration Project Adam Saling City of San Diego.
Bryant School District Bethel Middle School
The Monsanto Center LEED EB: Operations & Maintenance Silver Certification.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Presentation to HOK. 2rw.com NET ZERO ENERGY. SITE < or = renewable energy generated Building produces as much energy as it uses over the course of a.
330 North Wabash EPA’S ENERGY STAR RATING ACHIEVED December, 2009  330’s Energy Performance is in the top 25% nationwide accomplished through:  No Cost.
Sustainable Construction Technological Design Sustainable Construction © 2011 International Technology and Engineering Educators Association, STEM  Center.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Going Green!. Why “Go Green” ? Fostering health, wellness and productivity  Recycling  Air Quality Check  Mold and mildew check  Sanitary check 
Best Practices in Overall Sustainable Design Cal State University, Long Beach - Liberal Arts 2, 3 and 4 Renovation Presented By:Mark Zakhour,, CASp, LEED.
Name of Building(s) or Project Speaker(s) Organization(s)
Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting.
14 July 2009 JOHN WHEATLEY COLLEGE EAST END CAMPUS.
The lawrence berkeley national laboratory: a case study Revised 12/2/04.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
The Christman Company - Green MSU’s Greening the Supply Chain Conference April 21, 2014.
Introduction to Energy Management. Week/Lesson 12 Advanced Technology for Effective Facility Control.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Chapter 27 Green Building and Certification Programs.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
The importance of process in high performance building design.
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
Sustainability at LACCD Larry Eisenberg Executive Director Los Angeles Community College District.
ROLE OF ENGINEER IN SCHOOL DESIGN & CONSTRUCTION
Fun Facts: James M. Bennett High School
Technological Design Sustainable Construction
By Adam Beneroff Manitoba Hydro Place.
David Anderson Mechanical Option
INTD409 Interior Environmental Technology Fall 2014/15
Iron Forge Educational Center: U. S
INNOVATION lab MEP MECHANICAL/ELECTRICAL/PLUMBING :
Technology in Architecture
Presentation transcript:

U.S. General Services Administration EPA New England Regional Laboratory Best Practices and Lessons Learned John F. Buckley, Project Manager

2 The EPA New England Regional Laboratory V. 1.0 LEED Gold Rating Lease Procurement and Project Management: GSA Region 1PBS for the Environmental Protection Agency Developer: Acquest Development, Buffalo, NY Owner: Istar Financial Architect: Bernard, Johnson, Young: Bethesda, MD General Contractor: Erland Construction, Burlington, MA

3 PROCUREMENT Two Step Best Value Source Selection Source Selection Pre – Planning Design Build Lease Performance Specification v. Prescriptive Specifications Very Technical Requirements Need Prescriptive Specifications

4 Design Process All Stakeholders Need to be Involved in the Design Process. Include the End User in the Design Review Process The Design Build Process Give Up Control No Contractual Relationship With the A/E or the General Contractor Require the Developer to Define Roles and Responsibilities & Communication Flow Understand the Nature of the Developers Contract Requirements Means of Influence Value Engineering

5 Design and Construction Integrated Design Approach Whole Building Design Guide Define & Clarify Lines of Communication Define Decision Makers AE Relationship Contingency

6 Site Optimization Building Orientation Take Advantage of: Natural Topography Positive Drainage Prevailing Sun Prevailing Winds Native Plants & Vegetation Xeriscaping Need to Build in Flexibility to Deal with Differing Sites Permitting Requirements

7 Security Considerations Integrate Security Landscaping Natural Contours Natural Berms Consider Camera Locations Employee and Visitor Access Utility Feeder Locations Redundancy in Critical Utility Systems Air Intake Location

8 Construction Waste Management Dumpsters Set up For Masonry, Steel, Wood, Cardboard, and Drywall. Savings Was Approximately $4,000 Used to Offset the Cost to Coordinate Construction Waste. Approximately 200 Tons of Construction Waste Diverted From Landfill

9 Envelope High Performance Envelope Pay Attention to Details Close Coordination of Disciplines Fenestration Roofing materials Consider a “Green Roof” Local Materials Recycled Materials

10 Mechanical Systems Life Cycle Costing in the Planning/ Funding Stages Right Sizing Expansion and Redundancy Requirements 6 Modular High Efficiency Boilers 2 Energy Efficient Screw Type Water Cooled Chillers W. Paired Cooling Towers and Pumps Back up Exhaust Fans Expansion Capability in BMS System

11 Mechanical Systems Modular Boilers Water Cooled Chillers VFDs on Pumps & Fans High Efficiency Motors Variable Air Volume Distribution Systems with VFD’s on Supply Exhaust Fans 2 Speed Motors on Cooling Towers Building Energy Management System via DDC BMS

12 Plumbing Low Flow Fixtures Electronic Sensors Waterless Urinals Minimum Hot Water Temps On Site Well for Labs DI Water System 60 – 90 Hardness System Chilled Water Acid Neutralization System Lab Waste Separate Sanitary Waste

13 Electrical Systems 2500 Amp Service Located in Main Electric Room 480/277 – 3 phase Expansion Capability in –Main Switchgear –Distribution Panels –Local Panel Boards Building Integrated Photovoltaic Sunshades 100% Green Power via Green Mountain Wind Power Emergency Power 600 KW Emergency Generator 150 kVA UPS for Main Computer Room

14 Utility Corridors Safety Provide Flexibility Utilities and Gas

15 Lighting Ambient Lighting 30 Foot Candles Task Lighting Automated Daylight Dimming Occupancy Sensors Electronic Ballasts T-8 Lamps Extensive Daylighting Ribbon and Punch Windows Domed Skylights in Corridors Solar Tubes

16 Daylighting Solar Tubes Ribbon Windows w/ BIPV Sunshades

17 Building Management System Siemens DDC BMS System HVAC Lab Functions/ Fume Hoods Monitoring of Alarms/ Safety Devices Fire Alarm Security Paging Systems Trending Remote Access and Control CO 2 Monitoring Compatibility of Systems

18 Interior Design Walls and Flooring Low VOC, Recycled Coatings and Wall Coverings Flooring and Ceiling Materials Adhesives and Sealants Systems Furniture Indoor Air Quality Coordinate with Disciplines Mechanical Systems Electrical Systems Lighting Systems Acoustic Considerations

19 Commissioning Testing and Balancing Total Building Commissioning Third Party Contract by the Government Coordinate Activities in the Schedule Integrate O&M Staff/ Contractor Vendor Time Support Labor

20 Closeout Insist on Timely Delivery of Closeout Documentation Warranties Vendor Start Up Documents and Sign Offs Operation and Maintenance Manuals As - Built Drawings Adequate Supply of Chemicals and Consumables Fuels Shelf Stock

21 EPA NERL T Thank You - Questions? The new regional laboratory in North Chelmsford, MA is a testament to our commitment to “walk the talk” in achieving a high level of performance in all of our daily operations. We hope that the benefits of the lab will extend beyond the lab itself, providing inspiration and a concrete example that others can follow and improve upon as new technologies become available.” - Robert Varney, Regional Administrator, EPA New England