Division of Utilities and Solid Waste Management Pre-Construction and Benefit Assessments for Lake Linganore Board of County Commissioners Public Hearing.

Slides:



Advertisements
Similar presentations
RHID Basics (K.S.A et seq.)
Advertisements

Agreement between the Village of Owego and Inflection Energy.
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
Borough of Haddonfield 2010 Community Budget Briefing Jeffrey S. Kasko, Commissioner Sharon McCullough, Administrator July 22, 2010.
Alternatives to Financing Lake Development Infrastructure in Mississippi Public Improvement Districts and Tax Increment Financing February 4, 2009 Lucien.
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
2010 Draft Municipal Budget
BOARD OF COUNTY COMMISSIONERS DECEMBER 11, 2012 CELEBRATION POINTE COMMUNITY DEVELOPMENT DISTRICTS.
KINGWOOD UDGET PRESENTATION TOWNSHIP OF KINGWOOD 2012 BUDGET PRESENTATION.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Board of County Commissioners Allen County, Ohio Tuesday, May 1 st, 2001 Presented By: Stephen M. Kayatin, Sanitary Engineer Ryan Rase, Business Manager.
Hide-A-Way Lake, Inc. Low Pressure Sewer System Prepared by Dungan Engineering, P.A.
January 29, 2008 BCC Called Public Hearing on BZA # SE , 12/6/07 APPLICANT: Ganesh Bansrupan.
Economic Development Division Report to the City Council Merger of the Northwest Redevelopment Projects, and Amendment No. 4 to the Villa-Parke Redevelopment.
2006 Budget Challenges Additional Increases in Pension Contributions = +$451,200 Additional Assessment from RVSA = +$315,000 Increases in Fuel and Utility.
Understanding Your Property Tax Bill Tuesday, February 22, 2011, 6:00pm Thornton Room T-107 Thornton Township High School District 205.
BCC Public Hearing for consideration of an Agreement to Offer Donation of Real Property -and- a Solid Waste Management Permit Renewal APPLICANT: Hubbard.
Board of County Commissioners Allen County, Ohio Detailed Planning Assessment Hearing Wednesday, May 30 th, 2001 Presented By: Stephen M. Kayatin, Sanitary.
IRSDA Conference What Do the Amendments to Indiana Code Section Mean to You? Kristina Kern Wheeler, General Counsel Ja-Deen L. Johnson, Consumer.
Budget Committee Workshop February16, Oregon’s local budget law is a group of statutes that require local governments to prepare and adopt annual.
JUNE 19, 2012 BCC APPEAL HEARING ON BZA #SE , April 5, 2012 APPLICANT/APPELLANT: TONY RAHBANY.
March 10, 2015 Second Public Hearing 1.  Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15  Second.
Annexation Issues in Eden A History of Annexation in Eden Since 1968 NC Annexation History Current Annexation Issues in Eden January 2010.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Beach – is that area which extends.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
Adoption of the 2009 Skagit County Budget December 9, 2008.
Stanton Energy Center Solar Facility Presentation to the Board of County Commissioners February 22,
City of Marshall Development Proposal to Action Manufacturing, Inc. February 11, 2014.
Commissioners’ Briefing on Front Foot Benefit and House Connection Rates November 16, 2011.
Southwood Waterline Project Shawnee Twp. House 7:30 PM November 29 th 2000.
2013 Tax Levy Hearing Board of Education Meeting December 16,
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Commissioners’ Briefing on Front Foot Benefit and House Connection Rates November 2015.
Village of Taos Ski Valley Public Improvement Finance Plan November 3, 2014.
2015 Tax Levy Board of Education Meeting December 21,
FEBRUARY 22, 2016 FY 2017 County Administrator’s Recommended Budget.
1. FY Proposed Budget Jamie Justice, Town Manager & Piet Swart, Finance Director April 26, 2016 Fiscal Year Proposed Budget 2.
ITEM 9B Authorize a Commercial Developer Agreement with Keller Watermere, L.P., for South Village at Watermere, located south of West Southlake Boulevard.
Prospective Rural Additions Meeting JULY 15, 2015.
Mountain Regional Water Rules & Regulations Overview.
CITY OF NEW BERLIN SECTION 35 Neighborhoods G & H Comprehensive Plan Amendment Public Input January 2012.
Cuyahoga County’s 2008 Budget Summary December 13, 2007 Commissioner Jimmy Dimora Commissioner Timothy F. Hagan Commissioner peter Lawson Jones.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Lake Ashton and Lake Ashton II Community Development Districts CDD ORIENTATION CLASS February 28, 2011.
February 21, General Information Utility staff is not aware of any mandate from city ordinance or state statute to provide water and sewer services.
Morelli Park Reconstruction and Expansion Project Public Hearing and Award of Construction Contract Stockton City Council and Stockton Redevelopment Agency.
Ordinance Amending Chapter 37 of the Orange County Code Orange County Board of County Commissioners Public Hearing April 3, 2012.
FIRE PROTECTION CONTRACTS Workshop on Senate Bill 239 (Hertzberg) July 21, 2016 Nevada LAFCo – Presented by P. Scott Browne, Counsel.
Residential Sanitary Sewer Lateral and Water Service Insurance Program Board of Aldermen Retreat May 18, 2012 Scott J. Smith, P.E., Director of Public.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
SPECIAL DISTRICTS AVIK BONNERJEE, R.T.A. TOMMY LEE, R.T.A.
Washoe County Board of Adjustment June 1, 2017
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
Special Assessments John T. Shockley, Attorney Ohnstad Twichell, P.C.
2nd Street Drainage and Paving Improvements
Agenda Updates to Driveway and Sidewalk specifications and permits
Water & Wastewater Capacity Charge Work Shop
City of Johnston East of Merle Hay Road Infrastructure Improvements
107th & 110th Avenue North Public Utilities Renewal Projects
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Springbrook Estates Sewer Improvement Area Informational Meeting
System Development Fees
Georgetown county water and sewer district
PUBLIC HEARING Stockton City Council June 6, 2006
Meadow Lane – Brandon Road Improvements Welcome!
Subdivision Regulations
Washoe County Board of Adjustment

Presentation transcript:

Division of Utilities and Solid Waste Management Pre-Construction and Benefit Assessments for Lake Linganore Board of County Commissioners Public Hearing February 16, 2010

Division of Utilities and Solid Waste Management Pre-Construction and Benefit Assessments for Lake Linganore PurposePurpose Brief History/Status of Linganore Water and Sewer ProjectsBrief History/Status of Linganore Water and Sewer Projects Description of the proposed improvementsDescription of the proposed improvements Estimated costs and revenuesEstimated costs and revenues Benefit Assessment ProcessBenefit Assessment Process RecommendationsRecommendations BOCC questions and public commentBOCC questions and public comment

Division of Utilities and Solid Waste Management Purpose Code of Public Local Laws § (a) requires:Code of Public Local Laws § (a) requires: “… [T]he county shall construct any such system or extension thereof only after a public hearing held by the board, after giving notice thereof in one newspaper of general circulation published in Frederick County at least seven (7) days prior to the hearing. At the hearing, a description of the proposed improvements shall be presented together with the estimated costs thereof and estimated revenues to be derived therefrom …”

Division of Utilities and Solid Waste Management Purpose: History/Status of Linganore Water and Sewer Projects In 1998 the BoCC, in concert with the Lake Linganore Conservation Society CDA road project, began the process to provide water and sewer service to all previously recorded lots in the Lake Linganore PUD.In 1998 the BoCC, in concert with the Lake Linganore Conservation Society CDA road project, began the process to provide water and sewer service to all previously recorded lots in the Lake Linganore PUD. The combined project was to insure compatability of utilities and road and drainage improvements and to complete the installation of line extensions prior to the paving of the Lake Linganore roads.The combined project was to insure compatability of utilities and road and drainage improvements and to complete the installation of line extensions prior to the paving of the Lake Linganore roads.

Division of Utilities and Solid Waste Management Purpose: History/Status of Linganore Water and Sewer Projects The first phase of construction consisting of Coldstream, Meadows, and Balmoral is currently completing construction.The first phase of construction consisting of Coldstream, Meadows, and Balmoral is currently completing construction. Bids opened December 1, 2009 for the East and West Pinehurst/Nightingale water and sewer line completion project, along with the LLCS road improvement project.Bids opened December 1, 2009 for the East and West Pinehurst/Nightingale water and sewer line completion project, along with the LLCS road improvement project.

Division of Utilities and Solid Waste Management Purpose: Description of the Proposed Improvements PinehurstPinehurst Water (New and Replacement)Water (New and Replacement) ≈ 3,000 LF of 12-inch DIP watermain≈ 3,000 LF of 12-inch DIP watermain ≈ 11,750 LF of 8-inch DIP watermain≈ 11,750 LF of 8-inch DIP watermain ≈ 2,300 LF of 6-inch DIP watermain≈ 2,300 LF of 6-inch DIP watermain ≈ 850 LF of 4-inch DIP watermain≈ 850 LF of 4-inch DIP watermain Valves (size varies), fire hydrants, water service connections, meter vaults, appurtenances, miscellaneous contingent items and restorationValves (size varies), fire hydrants, water service connections, meter vaults, appurtenances, miscellaneous contingent items and restoration

Division of Utilities and Solid Waste Management Purpose: Description of the Proposed Improvements PinehurstPinehurst Sewer (New and Replacement)Sewer (New and Replacement) ≈ 1,000 LF of 8-inch DIP sanitary sewer≈ 1,000 LF of 8-inch DIP sanitary sewer ≈ 12,000 LF of 8-inch PVC sanitary sewer≈ 12,000 LF of 8-inch PVC sanitary sewer ≈ X LF of 3-inch low pressure PVC sanitary sewer≈ X LF of 3-inch low pressure PVC sanitary sewer 104 manholes, sanitary sewer connections (laterals)104 manholes, sanitary sewer connections (laterals) Miscellaneous contingent items and restorationMiscellaneous contingent items and restoration Total estimated cost: $6 million (water and sewer)Total estimated cost: $6 million (water and sewer)

Purpose: Description of the Proposed Improvements NightingaleNightingale Water (New and Replacement)Water (New and Replacement) ≈ 1,750 LF of 8-inch DIP watermain≈ 1,750 LF of 8-inch DIP watermain ≈ 600 LF of 6-inch DIP watermain≈ 600 LF of 6-inch DIP watermain ≈ 200 LF of 4-inch DIP watermain≈ 200 LF of 4-inch DIP watermain Valves (size varies), fire hydrants, water service connections, meter vaults, appurtenances, miscellaneous contingent items and restorationValves (size varies), fire hydrants, water service connections, meter vaults, appurtenances, miscellaneous contingent items and restoration Division of Utilities and Solid Waste Management

Purpose: Description of the Proposed Improvements NightingaleNightingale Sewer (New and Replacement)Sewer (New and Replacement) ≈ 2,000 LF of 8-inch PVC sanitary sewer≈ 2,000 LF of 8-inch PVC sanitary sewer ≈ 150 LF of 2-inch low pressure PVC sanitary sewer≈ 150 LF of 2-inch low pressure PVC sanitary sewer 16 manholes, sanitary sewer connections (laterals)16 manholes, sanitary sewer connections (laterals) Miscellaneous contingent items and restorationMiscellaneous contingent items and restoration Total estimated cost: $619,000 (water and sewer)Total estimated cost: $619,000 (water and sewer)

Division of Utilities and Solid Waste Management Purpose: Description of the Proposed Improvements Estimated RevenuesEstimated Revenues Anticipate 218 lots that are subject to a Ready-to- Serve charge of $18.75/qtr for water, and $18.75/qtr for sewer once construction is complete.Anticipate 218 lots that are subject to a Ready-to- Serve charge of $18.75/qtr for water, and $18.75/qtr for sewer once construction is complete. Anticipate approximately $6.3 million to be reimbursed to the County through the benefit assessment.Anticipate approximately $6.3 million to be reimbursed to the County through the benefit assessment.

Division of Utilities and Solid Waste Management Benefit Assessment Process Code of Public Local Laws § and Section XIII of the Water and Sewer Rules and Regulations permits special assessments upon properties for water or sewerage system improvements.Code of Public Local Laws § and Section XIII of the Water and Sewer Rules and Regulations permits special assessments upon properties for water or sewerage system improvements. What is a “benefit assessment”?What is a “benefit assessment”? The benefit assessment is a charge placed or levied upon a property in an amount which corresponds to the benefit conveyed to the property from the construction of water and sewer infrastructure.The benefit assessment is a charge placed or levied upon a property in an amount which corresponds to the benefit conveyed to the property from the construction of water and sewer infrastructure.

Division of Utilities and Solid Waste Management Benefit Assessment Process What will be assessed?What will be assessed? Lots already served by public water and sewer lines are not being assessed.Lots already served by public water and sewer lines are not being assessed. Only those existing lots of record that currently do not have both public water and sewer infrastructure available to the property within the following villages:Only those existing lots of record that currently do not have both public water and sewer infrastructure available to the property within the following villages: East PinehurstEast Pinehurst West PinehurstWest Pinehurst NightingaleNightingale

Division of Utilities and Solid Waste Management Benefit Assessment Process Items included in the assessment calculation:Items included in the assessment calculation: ConstructionConstruction Water lines (mains)Water lines (mains) Water lateral and meter vaultWater lateral and meter vault Sewer lines (mains)Sewer lines (mains) Sewer lateral and cleanoutSewer lateral and cleanout EngineeringEngineering DesignDesign Construction Management/InspectionConstruction Management/Inspection Project ManagementProject Management

Division of Utilities and Solid Waste Management Benefit Assessment Process Method used to estimate each future benefit assessment amount:Method used to estimate each future benefit assessment amount: Utilized the bid prices and applied them to new water and/or sewer infrastructureUtilized the bid prices and applied them to new water and/or sewer infrastructure Determined how many and which lots would receive new serviceDetermined how many and which lots would receive new service

Division of Utilities and Solid Waste Management Benefit Assessment Process Pinehurst

Division of Utilities and Solid Waste Management Benefit Assessment Process Nightingale

Division of Utilities and Solid Waste Management Benefit Assessment Process Design Fees Pinehurst * Fees were calculated from all lots in Pinehurst* Fees were calculated from all lots in Pinehurst

Benefit Assessment Process Design Fees Nightingale Division of Utilities and Solid Waste Management

Benefit Assessment Process Lots in Pinehurst and Nightingale are proposed to receive benefit assessments in conjunction with the pending bid award.Lots in Pinehurst and Nightingale are proposed to receive benefit assessments in conjunction with the pending bid award. These contracts will conclude the mission of the 1998 BoCC decision to provide service to recorded lots in conjunction with LLCS CDA road project.These contracts will conclude the mission of the 1998 BoCC decision to provide service to recorded lots in conjunction with LLCS CDA road project.

Division of Utilities and Solid Waste Management Benefit Assessment Process Amortization, %

East Pinehurst Waterlines (light blue) to be replaced New waterlines (dark blue) Division of Utilities and Solid Waste Management These lots currently served by wells.

Division of Utilities and Solid Waste Management East Pinehurst New sanitary sewer lines (green) Sanitary sewer lines (orange) to be replaced

Lots receiving an assessment for sewer only (tan) Lots receiving an assessment for water and sewer (magenta) Lots receiving an assessment for water only (light blue) East Pinehurst Division of Utilities and Solid Waste Management. This drawings is for illustration purposes only. All lots receiving a BA are not shown. For example, lots only receiving a single water and/or sewer later or only a meter vault are not shown on this illustration.

Waterlines (light blue) to be replaced New waterlines (dark blue) West Pinehurst Division of Utilities and Solid Waste Management

New sanitary sewer lines (green) West Pinehurst Division of Utilities and Solid Waste Management

Lots receiving an assessment for sewer only (tan) Lots receiving an assessment for water and sewer (magenta) Lots receiving an assessment for water only (light blue) West Pinehurst Division of Utilities and Solid Waste Management. This drawings is for illustration purposes only. All lots receiving a BA are not shown. For example, lots only receiving a single water and/or sewer later or only a meter vault are not shown on this illustration.

Nightingale Waterlines to be replaced (light blue) New waterlines (dark blue) Division of Utilities and Solid Waste Management

Nightingale New sanitary sewer lines (green) Division of Utilities and Solid Waste Management

Nightingale Lots receiving an assessment for sewer only (tan) Lots receiving an assessment for water and sewer (magenta) Division of Utilities and Solid Waste Management Lot 20A was inadvertently omitted from this process and will be subject to a future BA hearing.Lot 20A was inadvertently omitted from this process and will be subject to a future BA hearing.. This drawings is for illustration purposes only. All lots receiving a BA are not shown. For example, lots only receiving a single water and/or sewer later or only a meter vault are not shown on this illustration.

Division of Utilities and Solid Waste Management Recommendations BoCC to approve the Ordinance assessing certain lots in Lake Linganore for water and/or sewer infrastructure a maximum Benefit Assessment Amount as shown in Exhibit A of the proposed Ordinance.BoCC to approve the Ordinance assessing certain lots in Lake Linganore for water and/or sewer infrastructure a maximum Benefit Assessment Amount as shown in Exhibit A of the proposed Ordinance. Proceed with bid award process for construction of water and sewer in East Pinehurst, West Pinehurst, and Nightingale.Proceed with bid award process for construction of water and sewer in East Pinehurst, West Pinehurst, and Nightingale.

Division of Utilities and Solid Waste Management BOCC Questions