What’s the Cheapest Way to Keep Getting You There? Alternative Project Delivery in the 50 States and a Financial Analysis of Alternative Project Delivery.

Slides:



Advertisements
Similar presentations
PPPs and Affordability
Advertisements

CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Lecture-1 Financial Decision Making and the Law of one Price
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Introduction to Public Private Partnerships
Antitrust/Competition Commercial Damages Environmental Litigation and Regulation Forensic Economics Intellectual Property International Arbitration International.
 Definitions & Background  P3 Markets – Global & Canadian  Canada’s Infrastructure Deficit  P3 Policy Debate and Drivers  Why the debate matters 
AN OVERVIEW OF PROJECT FINANCE IN PRIVATE-PUBLIC PARTNERSHIPS FINANCE 101 T ERRI S MALINSKY Managing Director B.C.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
Public Conference 16th December 2010
Simon Par Keeling, Société Générale Paris
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
CHAPTER 12 THE CAPITAL BUDGETING DECISION Capital Expenditures Decision §CE usually require initial cash outflows in hope of future benefits or cash.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Chapter 6 Common Stock Valuation: The Inputs. 6-2 Valuation Inputs Now that we have an understanding of the models used, we are going to focus on developing.
VI-Economic Evaluation of Facility Investments 1. Project Life Cycle and Economic Feasibility 2.Basic Concepts of Economic Evaluation 3.Costs and Benefits.
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
PROCEDURES FOR SELECTING THE CONTRACTOR
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
Viability Gap Funding By Ashok Chawla Additional Secretary Department of Economic Affairs, Government of India 20 th December, th December, 2006.
Expectations What your Construction Professional, Architect, Construction Manager/Contractor expects from you? What you can expect from your Construction.
A Comparison of Property-Liability Insurance Financial Pricing Models Stephen P. D’Arcy, FCAS, MAAA, Ph.D. Richard W. Gorvett, FCAS, MAAA, Ph.D. Department.
FINANCE IN A CANADIAN SETTING Sixth Canadian Edition Lusztig, Cleary, Schwab.
Value Engineering. Definition Value Engineering (VE) is defined as a systematic process of review and analysis of a project, during the concept and design.
Chapter 15 Prepared by Richard J. Campbell Copyright 2011, Wiley and Sons Auditing Assets, Liabilities, and Equity Related to the Financing Cycle.
Financing Urban Public Infrastructure
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
FINANCIAL SERVICES… Presented by: Ruchika Sharma.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Issuing Bonds – The Process and the Role of the Registered Municipal Advisor 2013 Michigan Community College Business Officers Association July 25, 2013.
Preliminary Financial Analyses February 2011 Presented by: David C. Miller Managing Director The PFM Group I-95 (Rest Area) Access Project.
Audit of procurement and financing for Brampton civic hospital project ( A PPP Project) About this Project-- (i) In late 1990s,HRSC(Health Services Restructuring.
Revise Lecture 25.
1 Prentice Hall, 1998 Chapter 11 Cost of Capital.
National Smartcard Project Work Package 8 – Corporate Structures Report.
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
The What and Why of Fund Accounting May 15, 2014 GFOAz 1.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
WVDOH Experience... thus far.  Public-Private Partnerships = PPP=3P = P3 ... Most folks in industry refer to them as P3, so that’s what I go with.
Chapter 3 Arbitrage and Financial Decision Making
Welcome to Session 3 – Project Management Process Overview
Preparing the Bid Package (A Developers Perspective)
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Ensuring Good Quality PPP Projects Martin Darcy United Kingdom.
Bond Valuation and Risk
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Private Placements and Venture Capital Chapter 28 Tools & Techniques of Investment Planning Copyright 2007, The National Underwriter Company1 What is it?
Chapter Capital Budgeting C H A P T E R. Chapter Objectives Define capital budgeting. Distinguish between the various techniques of capital budgeting.
Lonni Steven Wilson, Medaille College chapter 11 Capital Budgeting.
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Hybrid Methods Hybrid Methods – Mix of Asset Based & Income Based Method.
Nordic transport infrastructure market – modelling and forecasting methods for asset management and business development Markku Riihimäki, Pekka.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved. © 2014 HDR, all rights reserved.
What Every Auditor Should Know about Public Private Partnerships (P3s)
Stage II: Refinement of Idea
PROJECT DELIVERY METHODS
Alternative Project Delivery: Lessons Learned and Yet to be Learned
PUBLIC PRIVATE PARTNERSHIPS KERJASAMA PEMERINTAH SWASTA
PROJECT DELIVERY METHODS
The Role of Private Sector in Capital Budgeting
Presentation transcript:

What’s the Cheapest Way to Keep Getting You There? Alternative Project Delivery in the 50 States and a Financial Analysis of Alternative Project Delivery Systems on Road Projects July 2012 Monthly Conference Call for Div. 4 ABA Construction Forum on the Construction Industry Kyle Ostergard, Esq. Alston + Bird LLP

2 Kamran Ghavamifar & Ali Touran, Alternative Project Delivery Systems: Applications and Legal Limits in Transportation Projects, 134 J. of Professional Issues in Engineering Education and Practice 106 (2008). The paper is a snapshot of the legal codes for the 50 states regarding alternative project delivery (APD) systems in transportation projects as of December 2006.

3 What Does Project Delivery System/Method Mean? Term referring to all the contractual relations, roles and responsibilities of the entities involved in a project. AGC defines as “the comprehensive process of assigning the contractual responsibilities for designing and constructing a project. A delivery method identifies the primary parties taking contractual responsibility for the performance of the work.”

4 Design-Bid-Build On the one hand, under the Brooks Act (Public Law ) passed in 1972 and state Little Brooks Acts, the selection of the designer should be quality-based. On the other hand, the lowest, responsible responsive bidder performs the construction. These two principles led agencies to adopt the Design-Bid-Build (DBB) delivery system, which dominated transportation projects until 1996.

5 Design-Build In 1996 the Federal Acquisition Reform Act was passed authorizing the use of Design-Build (DB) on federal projects. The Transportation Equity Act for the 21 st Century allowed state DoT’s to award DB contracts if the state’s code authorized it. The owner chooses a single entity following completion of conceptual design or preliminary engineering when performance requirements established.

6 Design-Build The design-builder assumes almost all responsibility for the detail design and construction and delivers the final product, which should fulfill the performance requirements. DB is actually the oldest delivery method in the construction industry – many large cathedrals in Europe built by master builders, the rough equivalent to DB contractors. Up to the 19 th Century, almost all project in US delivered with form of DB.

7 Design-Build States fully authorized DoT’s to use DB: 17. States that required extra approval from outside DoT: 2. States had pilot programs or limited number or cost over period of time: 18. DoT’s that had no authority to use DB: 13.

8 Construction Management-at-Risk CM-at-Risk (CMR) sometimes referred to as Construction Manager/General Contractor (CM/GC). Contractor engaged early during the project design phase to help owner manage duties and increase the feasibility and constructability of the design. Expected to provide realistic cost estimate early in project life cycle.

9 Construction Management-at-Risk States normally reserve the right to bid construction if CMR price is not competitive. Difference between CMR and CM-Agency (CMA) is that CMR is obligated to deliver project with GMP and CMA is the owner’s agent and adviser and, so long as CMA performs duties, not responsible for time or cost overruns. CM for fee.

10 Construction Management-at-Risk States that authorized CMR: 14. States that required extra approval from outside DoT: 2. States with limitations per fiscal year: 3. States did not allow DoT or any agencies to use CMR: 31.

11 Public-Private-Partnership P3 also referred to as Public-Private-Initiative or Comprehensive Development Agreement A non-traditional arrangement between the department and one or more private or public entities that provides for:

12 Public-Private-Partnership 1.“Acceptance of private contribution to a transportation system project or service in exchange for public benefit concerning that project or service; 2.Sharing of resources and the means of providing transportation system project or services; or 3.Cooperation in researching, developing, and implementing transportation system projects or services.” –(State Code of Georgia)

13 Public-Private-Partnership 2007 U.S. Secretary of Transportation authorized to use three capital projects as pilot program with results to be studied. Similar to DB in technical aspects, but the financial aspects has caused apprehension

14 Public-Private-Partnership States that have accepted P3: 24. –Of those 24 states, 4 had some limitations. State DoT’s fully authorized to use P3: 19. One (1) state authorized but required outside approval. States that had pilot programs: 4. States where not authorized: 26.

15 APD is the Future The process of passing legislation for APD slow at times, but the trend is toward authorization. From , an increase from 30 to 37 states permitting DB. The trend serves as reminder to stakeholders that DBB will become less prevalent.

16 Financial Analysis of APD Road Projects Pertti Lahdenperä & Tiina Koppinen, Financial analysis of road project delivery systems, 14 J. of Financial Management of Property and Construction 61 (2009). Which PDS should the owner (client) select? –The various decision making and expert systems that have been developed are usually qualitative systems that consider various features of a project.

17 Financial Analysis of APD Road Projects –Those systems do not, however, indicate actual cost performance of the PDS’s. –Further, they focus more on the investment phase excluding so-called life cycle forms of contract. –Studies often focus solely on two PDS’s or variations and/or performance of a certain PDS’s. Precludes formulating a general view on cost efficiency of a number of PDS’s.

18 Financial Analysis of APD Road Projects In light of these deficiencies, the goal of the paper is to examine the cost performance of different road PDS’s by defining their indicative, relative cost performances. The authors used their earlier study from –That study did not include the private-financed option and financing issues were excluded. –The cost to the user community was also ignored.

19 Financial Analysis of APD Road Projects The paper seeks to address the deficiencies of the earlier study and focus on the significance of various financial parameters by means of sensitivity analyses.

20 The Project Delivery Systems Analyzed CM-at fee (CMA); CM-at risk (CMR) excluded Design-Bid-Build Design-Build Design-Build-Operate (DBO) –Owner arranges financing and pays for the investment in due time as w/ CM, DBB, and DB. Design-Build-Finance-Operate (DBFO) –Service provider or special purpose vehicle (SPV) arranges for financing.

21 The Analysis Discounted Cash Flow (DCF) method used to obtain PDSs’ present costs (PC’s). Two complementary analyses: 1.Cost to the owner 2.Cost to society Finland selected as the application environment for financial estimates and accounting constraints.

22 The Analysis Taxes excluded All work assumed to be out-sourced.

23 Financial Estimates/Assumptions Risk-free rate: 4% Industry margin (increased borrowing for private sector above risk-free government bonds rate):.5% Cost escalation/inflation: 2% Social opportunity costs: 4% risk-free rate Share of equity: 10% of project financing

24 Financial Estimates Return on equity: 4% risk premium or beta under CAPM –8% (Risk-free + beta) required rate of return on equity Consulting Fees in DBFO (legal/financial):.5% of debt raised (which here equals investment costs)

25 Other Estimates 30 year total study period –Close to the stated economic life cycle of roads. Early commissioning advantage: €1 million monthly cost of delayed commissioning

26 Conclusions The results of the financial analysis indicate “clearly” that DBO is the most efficient in terms of owner’s costs. The private finance of DBFO increases its costs close to those of DB, but not to the levels of the two most operationally inefficient -- DBB and CM.

27 Conclusions In sum, disregarding the financing component, the fewer the contracts the client enters into to purchase an entire road management package, the more cost efficient the project becomes. Consideration of early commissioning advantage improves the standing of CM the most, but it is likely to match DB and DBO only where speed of construction is critical.

28 Conclusions Sensitivity analysis –Changes in estimates do not usually affect the ranking order of DBB, CM, DB, and DBO since any alteration affects them much the same. –The lines representing CM and DBB are not completely parallel when variations occur in cost escalation and social opportunity costs due to differences in speed of construction.

29 Conclusions –Probably not surprising, but DBFO is affected differently by most variations in estimates. –Increases in senior debt to industry, share of equity, required return on equity, and concession period all diminish DBFO’s competitiveness. Social opportunity costs, which is related to the valuation of risk in public-financed PDS’s seems critical.

30 Conclusions Change is not always as dramatic in reality –Interest rates dealt with as independent factors are derivative from market rate and thus change in parallel.

31 Conclusions (1) DBO, (2) DB, (3) CM and (4) DBB DBFO’s competitive position is not absolutely clear but seems to be in the middle category with DB on the basis of the owner’s PC of a 30 year contract. –Consideration of the early commissioning advantage makes CM (fastest commissioning) nearly equal or sometimes better than DBFO, which increases its superiority over DBB.