RF PROCESSING OF RFQ COUPLERS CDR2 | Michel Desmons 8-9 DEC 2015.

Slides:



Advertisements
Similar presentations
Resistive bulks industrialization Status report 2 OCTOBER 2012 Fabien Jeanneau | PAGE 1 RD51 Collaboration meeting | Stony Brook University | October 2012.
Advertisements

Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
ATLAS-NSW CERN MMM workshop assembly of the module (quadruplet)
Pour insérer une image : Menu « Insertion / Image » ou Cliquer sur l’icône de la zone image Pour personnaliser « nom événement et auteur » : « Insertion.
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
Design of Standing-Wave Accelerator Structure
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
APPLICATION OF EDMS TO XFEL CRYOMODULE ASSSEMBLY AT CEA Christelle CLOUE - Catherine MADEC.
SAISINUC SOFTWARE ENVIRONMENT Data tools: import, check, export, use DDEP , October 8-10 Marie-Martine Bé, Charlène Bisch, Christophe Dulieu, Mark.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
Fermilab I. Terechkine1 RF Phase Shifter R&D Proton Driver Review March 15, 2005 T. Barrak, B. Foster, I. Gonin, M. Huening, V. Kashikhin, T. Khabiboulinne,
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
DEVELOPMENT OF BETA SPECTROMETRY USING CRYOGENIC DETECTORS M. Loidl, C. Le-Bret, M. Rodrigues, X. Mougeot CEA Saclay – LIST / LNE, Laboratoire National.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
Manufacturing contracts for RFQ
PRELIMINARY VERSION ESS RFQ CDR 2 TIME SCHEDULE, PROJECT RISKS, RAMI AND SAFETY Anne-Catherine CHAUVEAU8th and 9th december 2015.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
October 1st 2015 Alexis Fouché 1, Florian Noyrit 1, Sébastien Gérard 1, Maged Elaasar 2 SYSTEMATIC GENERATION OF STANDARD COMPLIANT TOOL SUPPORT OF DIAGRAMMATIC.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
RISK REGISTER Management & Engineering
ESS RFQ PROJECT RISKS Anne-Catherine CHAUVEAU 14 January 2016.
Bruyères-le-Châtel, 8 décembre 2015
INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES.
ESS CRYOMODULE RISKS REGISTER ESS CRYOMODULE COMPONENTS AND CAVITY EXPERTISE Franck PEAUGER14th January 2016.
GHz High Gradient Testing of a T18 TW StructureUsing a Fast Response Protection and Power Recirculating System GHz High Gradient Testing.
Status of work on the HOM coupler. 2 nd Harmonic cavity Meeting 11/II-2016 Thermal analyses with shims (Y.Terechkine). Gennady Romanov On behalf of Y.Terechkine.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
4/26/2013 Irina PetrushinaDeflecting cavity MHz for PXIE Irina Petrushina 4/26/2013.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
“DOING BUSINESS IN THE USA“ MARKÉTA STARÁ SME Business Developer for Czech Republic and Slovakia.
The Capability Approach as an Evaluation Framework for ICT for Older Adults ENTRANCE | Margarita Anastassova, Sabrina Paneëls, Verena Fuchsberger, Christiane.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
ESS RFQ INTERFACES | Didier CHIRPAZ-CERBAT CEA-ESS INTERFACES.
Status of the rt CH-cavity - Anja Seibel -. Outline CH-Cavity CH-Parameter Heat distribution Cooling concept Final CH-Cavity First measurement results.
DISCUSSION OF THE ARCS AND OVERALL LATTICE INTEGRATION FCC meeting 8th of January 2015 Antoine Chance.
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
1 & 2 JUNE 2015 – LLRF – BEAM DYNAMICS WORKSHOP URIOT Didier What is taken into account in simulations LLRF – Beam dynamics Workshop.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
CONTROLS OF ESS EMU Jean-François DENIS / Tom JOANNEM.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
Areal RF Station A. Vardanyan
How does a klystron work? TE-MPE Section Meeting Karolina Kulesz
Medium beta cryomodule demonstrator M-ECCTD
Task T HTS Dipole Magnet Design and Construction
MICE RF Cavity Simulations and Multipactor
704 MHz FPC EVOLUTION TOWARDS FPC SERIES FOR ESS
Physics design on Injector-1 RFQ
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
XFEL Tuner system non-conformities Detected At saclay
XFEL Cold mass & vacuum vessel non-conformities Detected At saclay
ADS Accelerator Program in China
CEPC 650MHz High Efficiency Klystron R&D
Test plan of ESS HB elliptical cavity
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL main evolutions between M-ECCTD and serie - Bonjour, Franck Peauger, Je.
Identification and marking of ESSI deliverables
Cryomodule Product Breakdown Structure and configuration traceability
XFEL cryomodule production and Reliability improvement
Bonjour. Franck Peauger. Je suis Ingénieur RF accélérateurs au SACM
Used PEP-II 476 MHz Cavities for MEIC Collider Rings
10th srf collaboration LASA JUNE CAVITY interfaces - Vincent Hennion
Presentation transcript:

RF PROCESSING OF RFQ COUPLERS CDR2 | Michel Desmons 8-9 DEC 2015

CONTENTS | PAGE 2 CEA Saclay/Irfu projet ESS | DATE Pour personnaliser le pied de page et la date : « Insertion / En-tête et pied de page » Personnaliser la zone de de pied de page Cliquer sur appliquer partout Cavity for RF processingP.03 Scattering parameters P.04 Field maps P.05

CAVITY FOR RF PROCESSING | PAGE 3CEA Saclay/Irfu projet ESS | DATE Goal : RF processing on matched load up to 1MW peak and 5% duty cycle Input data: about 8000 A/m magnetic field needed at the RF Loop location to get 1MW coupled power at 352.2MHz Solution: 2 RF couplers connected via a Quarter-wave resonator, the first one being connected to the klystron and the second one to a matched load Cavity inner conductor (stem) ended with mushroom shape part to decreese the length of the resonator :  decrease the RF losses of the cavity  decrease the cavity voltage (for easier X-ray shieding) E (V/m)H (A/m) Electric field Emax V/m (0.56 kilpatrick) Cavity voltage Vcav kV Incident RF power kW Transmitted power kW RF losses kW Stem…………….....…20kW Cavity body…… kW Tuner…………… kW PumpingGrid… kW RF Loop………… kW (2x1.2kW)

| PAGE 4 CEA Saclay/Irfu projet ESS | DATE SCATTERING PARAMETERS  f (MHz) Transmitted RF power (W) | s 11 | RF Loop surface current density Im(s 11 ) Re(s 11 ) s 11 in the complex plane Blue : at the input of 100mm long feeder Red : de-embeded with 172.3mm coaxial line Black : parallel RLC network The 72.3 mm extra length is close to the RF Loop length (2 x 14 + pi x 14.4 = 73.2mm) P max = 962 kW  f 3 dB = MHz Q L = 104 |s 11 | min =

| PAGE 5CEA Saclay/Irfu projet ESS | DATE FIELD MAPS log 10 ( ||H A/m || ) Magnetic field : H max = A/m One pumping port One tuner port ||H A/m || Magnetic field : Hmax = A/m ||E V/m || Electric field : E max = 12.9 MV/m (0.7 kilpatrick) ||E V/m || E max = 10.6 MV/m (0.58 d = 2.1 mm E max = 11.7 MV/m d = 1.7 mm (+3 MHz)

DSM Irfu Commissariat à l’énergie atomique et aux énergies alternatives Centre de Saclay | Gif-sur-Yvette Cedex T. +33 (0) xx xx | F. +33 (0) Etablissement public à caractère industriel et commercial | RCS Paris B | PAGE 6 CEA Saclay/Irfu projet ESS | DATE