Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services
Essex County Highways 2016 Construction Program Highlights –$23,289,000 expenditure level –Includes approx. $2,100,000 from 2015 –Rehabilitation Program ($10 M) –Capacity Improvement Program($10.3M) –CWATS Implementation ($2.9 M)
Rehabilitation Program 28 Planned Projects –6 Bridges ( 4 Construction, 2 Engineering) –8 Culverts ( 4 Construction, 4 Engineering ) –14 Roads –Miscellaneous Maintenance Projects
Capacity Improvement Program County is continuing a multi year capacity improvement program for the network Senior level funding includes –Federal Gas Tax $2M –Ontario Community Infrastructure Fund $195,000
Essex County Highways Bridge Projects ($1,907,000) –4 Structure RehabilitationsLow eTender Bidder CR Silver CreekIntrepid General CR Pike CreekFront Construction CR Bow StringFront Construction CR Belle RiverSLR –2 Engineering projects for 2017 construction: CR Tremblay Creek CR Ruscom River
Essex County Highways Culvert / Drainage ( $2,326,000 ) –CR 8 th Concession culvert replacement (SLR) –CR CR 35 culvert rehabilitation (SLR) –CR Wismer Arch Taylor culvert replacement –CR 31 Malden drain culvert replacement –4 - Culvert Engineering projects for 2017 construction CR Webster Drain CR Wilkinson Shilson Drain CR Craig’s Creek Bundle 3 culverts on CR 2, CR 8, CR 27
Essex County Highways Road Projects ($5,915,000) –Recycling/Resurfacing 31.5 km: CR 29- Kingsville CR 1 - Lakeshore CR 10 - Amherstburg CR 11 - Essex CR 14 - Kingsville CR 15 - Essex CR 18 - Leamington CR 22/ Lesperance - Tecumseh CR 31 roundabout – Kingsville, Leamington CR 42 - Tecumseh CR 43 - Tecumseh CR 45 – Kingsville CR 46 - Lakeshore
Essex County Highways Road Projects ($5,915,000) –Recycling/Resurfacing 31.5 km –Cold in place asphalt works (eTender bid Coco) –Surface asphalt over Cold in Place –Mill and pave works –Partial pave shoulder works –Intersection works
Essex County Highways Pavement Preservation ( $300,000 ) –Route and Seal – various locations –Surface Treatment – CR km Bridge / Culvert Preservation ($245,000) –Various deck and expansion joint repairs –Various guiderail repairs / upgrades Estimated Quantities –32,000 tonnes of Hot Mix Asphalt –137,000 sm. of Pavement Recycling –34,000 tonnes of Granular A
Essex County Highways Capacity Projects ( +/- $10 M) –CR 22 Phase 6 (I. C. Roy intersection) –CR 19/22 Improvements –Various Connecting Link projects with Towns CR 6 (Todd Lane) – LaSalle CR 40 (Sprucewood) – LaSalle
Essex County Highways EA’s / Engineering in Process: –CR 20 EA, Kingsville –CR 23 CR 18 (3 km) –CR 42 detailed design, City limit to CR 19 –Proposed roundabouts CR 9/18 and CR 11 South Talbot intersections –Transportation Master Plan Update –Lauzon Parkway Extension – MTO/CoW /CoE –Active Transportation System ($52M)