DIFFERENCES BETWEEN BESMM 3 & 4

Slides:



Advertisements
Similar presentations
Space and shell structures
Advertisements

Concrete Technology Finishing Concrete Joints in Concrete Lecture 20
MAJOR PROJECT: warehouse/office
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
SHOTCRETING K.V.SUBBA RAO.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
Bridge Engineering (6) Superstructure – Concrete Bridges
By : Prof.Dr.\Nabil Mahmoud
Structural System Overview
Concrete Specification and Roadway Standard Revisions Bill Miller, PE Bureau of Construction and Materials Mark Burkhead, PE Bureau.
Commercial Framing C D Prints Unit 13.
Lecture 33 - Design of Two-Way Floor Slab System
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
PIPE CULVERT By CH. VENKATARAMAIAH.
No. 18 of 19 Geosynthetics in Asphalt Pavements by Prof. S.F. Brown FEng University of Nottingham The information presented in this document has been reviewed.
CHAPTER 9 MASONRY.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Fire Behaviour Elements of Structure and Fire Development.
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
UNIT-I STANDARD SPECIFICATION FOR ROAD BRIDGE
Basic Civil Engineering-Foundation
Pad Foundation Lectured by: Ms. Noorhidayah Sunarti
Chapter 4 Measuring Concrete Work
© 2009 Industrial Services and Consultancy. All rights reserved. Prakash Somji (Col. Retd.), Founder & CEO
Structural Drawing Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
Cars, train, and planes…..hot air balloons Mara Bancroft Mr. Cosentino.
Topic B2 Sub-structure groundworks
Reading Structural Drawings
Setting Out Joiners Rods “extracts from Practical Australian Carpentry” M. S. Martin Original 2005 Revised 2008.
SESSION 8 Shoulder Considerations. Objectives Identify shoulder/edge support types Describe benefits of each type Discuss how edge support conditions.
FORMS, SCAFFOLDING and STAGING
Wall Framing Grimsby Secondary School Technology Dept.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
Chapter 23: Structural Drafting
The four basic types of structures are :
Composite Construction
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Continuously Reinforced Concrete Pavement
BEAMS: Beams are structural members that can carry transverse loads which produce bending moments & shear force. Girders: Main load carrying members into.
Situation in the Netherlands
AN EVALUATION OF DIFFERENCES BETWEEN BESMM 3, CESMM3 AND BESMM 4 (CIVIL/INDUSTRIAL ENGINEERING WORKS) NIQS BESMM 4 TRAINING WORKSHOP DATE: 6TH.
Track Drainage CE2303 Railway Engineering. Drainage-General Drainage is the natural or artificial removal of surface and sub-surface water from an area.
NIQS – TRAINING ON BESMM4
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
Soil mechanics and foundation engineering-III (CE-434)
Jerry L. Larson IRMCA Indiana LTAP Basics of a Good Road
土木工程概论 Introduction to Civil Engineering 第五、六、七章 交通、桥梁与港口工程 Chapter 5 Transportation, Bridge and harbor Engineering.
Concrete Repair.
Structural drawing.
Building Planning and Drawing
Flat slab Structures VI.
CONCRETE PAVEMENTS.
BUILDING CONSTRUCTION 1
SeminAR ON LINTELS --SANTHOSHKUMAR.M..,.
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
Arch205 Materials and building construction 1 foundation
Structural Drawing Chapter 19.
Arch205 building construction foundation
RAILWAYS, BRIDGES & TUNNELS
STRUCTURAL TIMBER FRAMING
Plain & Reinforced Concrete-1 CE3601
FBE04 BUILDING CONSTRUCTION AND MATERIALS
R.G.G.P (NARWANA) Power point presentation of Building construction
Pavement Structural Analysis
Pavement Structural Analysis
OLD CONCRETE MAKES WAY FOR NEW ASPHALT A Laatz, N Cocks, N Burger
BUILDING CONSTRUCTION Foundation
Presentation transcript:

DIFFERENCES BETWEEN BESMM 3 & 4 NIQS BESMM 4 TRAINING WORKSHOP 6-7th APRIL, 2016

COMPARISON of measurement documents BESMM3 & CESMM3 CESMM4 & BESMM 4 Adopted the format of SMM7 of 9 columns Work sections retained same identity in both building and Civil/Industrial Engineering eg D- Groundwork, E- Concrete work Integration of NRM 2 and CESMM 4 but retained the 9 columns in BESMM 3 Work sections identified separately for both building/civil, industrial engineering e.g 2A-2Z; 2AA-2AB; 2F-2H concrete Adopts CESMM4 for civil/industrial engineering works

Metalwork/timber G-Metalwork/Timberwork 2N-Structural metalwork/miscellaneous Metalwork Miscellaneous metalwork, scaffolding structural metalwork, timber, all lumped together under the above Extensive integration of CESMM 4 (current) Structural metalwork/ miscellaneous metalwork together Fabrication as members (main Bridges, subsidiary and framing) Bridge bearing materials-Elastometric and propriety added. Bridge bearing 6 items differentiated.

BESMM 3: D75- PILES AND PILING ANCILLARIES BESMM 4: 2R- PILES Measurement to Rule D30 (building work section) Piles and its ancillaries lumped together Rearranged; Piles (2R)now separated from their ancillaries (2S) Nominal cross sectional area given in 8 stages Isolated piles Mass/m given in 8 stages Interlocking steel piles section modulus given in 8 stages Stone Columns provided (to be measured) and in 8 stages

Roads and pavings BESMM 3 Q45 BESMM 4 2T 6 Classifications Sub-base, flexible road bases & surfacing (depth to be stated….not given) 9 Classifications Un-bound sub-base- further classified into 4 types; depth given in 8 stages Cement and other hydraulically bound pavement classified into 8 stages Cement bound granular mixture, fly as bound mixture, etc. depth given in 8 stages

Road and Pavings (Cont’d) BESMM 4 2T BESMM 3 Q45 Concrete pavements further classified into 10 types; unreinforced concrete surface slabs, jointed reinforced, continuously reinforced. Depth/thickness groupings given in 8 stages Mass of bar reinforcement taken at 7.85t/m3 and nominal sizes given in 8 stages (6mm-32mm diameter) Concrete pavements-carriage way slabs. Depth, thickness to be stated. Nominal mass, to be stated Mass of bar reinforcement taken at 7.85t/m3 (nominal size of members no given

Road and Pavings (Cont’d) BESMM 3 Q45 BESMM 4 2T Waterproof membranes below concrete pavement Item description to state the gauge and extent of laps. Joints in concrete pavements; depth of joints to be stated in mm (not stated) Separation and waterproof membranes Item description to state their materials and thickness. Joints in concrete pavements; depth in groups given in 8 stages.

Road and Pavings (Cont’d) BESMM 3 Q45 BESMM 4 2T Kerbs, Channels and edging classified into 6 items Ancillaries, surface markings-5 items noticed including non reflective studs and reflective studs Kerbs, Channels, edgings, footways and paved areas classified into 10 items with addition of item 7-10 Ancillaries; surface markings-6 items including Non reflective road studs; reflective road studs and Raised rib

Railway Track Construction X 40 BESMM 3 2U BESMM4 Track bases/foundation; 5 items Taking up sundries; 6 items Track/foundations; 8 items noticed additional 3 items included (Ballast cleaning; tampering and Pneumatic ballast Taking up sundries: 7 items noticed- additional item is Eutectic strip.

Railway Track Construction (Cont’d) X 40 BESMM 3 2U BESMM4 Lifting, packing and slewing and work to existing track; 6 items evolved. Additional items include -existing rail turning and fixing. -re-railing -stressing rail Lifting packing and slewing; 5 items

Railway Track Construction (Cont’d) X 40 BESMM 3 2U BESMM4 Additional information Plane tract Plane track with conductor Plane track with turnout Plane track with conductor rail and Buffer stops

Piling ancillaries D 75 BESMM 3 2S BESMM 4 Group together. Measured work items pre-boring, extensions, cutting off tops, etc. including disposal, delays Each of the measured work has 7 or 8 items of piles ancillaries to be measured. These exclude disposal and delays. Disposal is deemed to be included with the piling works.

Piling ancillaries D 75 BESMM 3 2S BESMM 4 The cross sectional area, mass, sectional modulus etc. were not given or specify Pile test did not provide for type of test to be done The cross sectional area, mass, sectional modulus etc. their range were given or specify Pile test provide 5 types of test to be carried