Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.

Slides:



Advertisements
Similar presentations
US 491 South Corridor FLH-666-1(49)17 CN 2357 Navajo 9 to Sheep Springs (NM 134) MP 15 to MP 46 Public Information Meeting November 1, 2006.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Silver Star Rd. (SR 438) Public Meeting Public Information Meeting Intersection Safety Improvements Silver Star Road (SR 438) at Ocoee Hills Road From.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Arterial Street Rehabilitation for Riverside Drive 24 th Street to 35 th Street Public Informational Meeting July 22, 2014.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
6 th Street Water Main And Street Reconstruction 2013.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Insert project map NOTICE OF PUBLIC INFORMATION MEETING Florida Department of Transportation Project History The Florida Department of Transportation (FDOT),
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014.
Environmental Assessment Public Meeting
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
Golden Triangle Blvd. Progress Report March 27, 2007.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Nick Johnson, PE Senior Project Manager October 1, 2012.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Current Construction Projects Major Projects Pinellas County.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Aires Estates/Bald Eagle Estates) Improvement Project October 11, 2010.
Phase 2: 30% Design Plans September 4 th, 2012.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
Community Development Department Construction Phase BULLDOG DRIVE.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
STA Safety Project PID #76439 December 12, 2006.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.
S.R. A1A SIDEWALK PROJECT SR A1A Sidewalk FPID Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Jemtegaard Trail Project was originally funded by a Safe Routes to School (SRTS) which is a federal grant administered by WSDOT Total funding for design,
Molly Kline, Project Manager
Col. Pike Multimodal: About the Project
DICKINSON AVENUE RECONSTRUCTION
Transportation Projects
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Walker Street Reconstruction Project 25% Design Public Hearing
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016

Objectives Update you on the status of this project Identify the challenges to be faced Clarify the project schedules Hear your input

Project Background This project is a part of the JTAMobilityWorks program, which is funded from bonds issued against the 2014 extension of the Local Option Gas Tax. Work on the project was previously completed through the City of Jacksonville's Better Jacksonville program.

4 Program Map

Project Overview Girvin Road project involves approximately 2.9 miles of roadway reconstruction from Atlantic Boulevard to Wonderwood Drive  Upon completion, the roadway will feature a five lane urban section south of Ashley Melisse Boulevard to Atlantic Blvd. and a three lane urban section north of Ashley Melisse Boulevard to Wonderwood Dr. Design-Build Cost: $17,485,890.99

Project Scope Scope of work includes:  Curb and gutter  Closed drainage system  Center turn lanes and grassed medians  Lighting  Sidewalks  Utility relocations ► JEA Water and Sewer

Project Status  RB Baker Construction will complete final design and construction ► The original design plans were prepared for CoJ under the Better Jacksonville Plan  The project is being completed through Design-Build  Right-of-way was acquired by CoJ  Original permits have expired and new permits must be obtained

Typical Section (Atlantic to Ashley Melisse)

Typical Section (Ashley Melisse to Wonderwood)

Schedule Anticipated Project Schedule: March 2016 Summer 2016 Spring 2018 Begin ConstructionProject Completion Begin Design

Project Challenges  100% plans previously completed for CoJ  Plans were returned to 60% level due to lapsed time and permitting issues ► Survey to confirm existing elevations ► Existing utilities may require adjustments ► Drainage design ► New permitting requirements

Project Challenges  Roadway design adjustments required to meet current standards ► 40 mph design speed ► Lane widths and cross-slope adjustments ► Elevation changes  Drainage design must be fully reviewed and may require rework in some areas  Final utility design for relocation and coordination  Temporary construction easements

Design Modifications and Improvements Traffic signals and intersection improvements at two intersections: Girvin Atlantic Blvd Girvin Joeandy Road

Contact Information Wendy Morrow Events/Projects Coordinator Jacksonville Transportation Authority 121 W. Forsyth Street, Suite 200 Jacksonville, FL

THANK YOU