CUSTOM BICYCLE RACKS Traffic & Parking Commission January 10, 2013.

Slides:



Advertisements
Similar presentations
Parks and Recreation Commission Meeting April 10, 2006 Thunderbird Conservation Park Update.
Advertisements

January 23, El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville.
TBITE 05/15/ Heather Sobush, Senior Planner Christopher Cochran, Senior Planner
Community Legacy 2014 Application (FY’15) Project Request List.
Northwest Highway Industrial Corridor Designation October 12, 2012.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Facility Needs Assessment and Conceptual Design Pleasant Grove Civic Center.
Proposal of “Splendora Plaza” in Splendora, Texas Nov acres property in Splendora, Texas, with Beautiful US Route 59/69 frontage, will be developed.
Newtown Storefront Grant Program Update 1 Sarasota City Commission June 1, 2009 information as of May 28, 2009.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
City/University Projects Fund Calendar Year 2012 Budget Request.
UCSF Medical Center at Mission Bay Proposed Fourth Street Public Plaza Mission Bay CAC February 9,
Yorktown Civic Association Neighborhood Conservation Plan Update March 2006.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Community Gardens on Public Land Meredith Gray Sustainable Urban Agriculture and Community Gardens Coordinator City of Austin Parks and Recreation Department.
DOWNTOWN UPDATE Al Strang, City Manager September 6, 2005.
May 7 th, Purpose and Scope of Project Project History Project Elements Next Steps.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Long Beach West LA/ Santa Monica East Los Angeles Pasadena/ San Gabriel Valley “Make the Right Decisions to Connect the Southern California Light Rail.
NBOZ Northlake Boulevard Overlay Zoning District Village of North Palm Beach Landscape Element Requirements.
CLIFTON BUSINESS DISTRICT Neighborhood Business District Improvement Program Joyce M. Rich May 20 th, 2014.
Public Hearing (PH 1) City Council Meeting February 7, 2012.
Broadview Second Access. Parlette Annexation What has changed? Parlette has asked for reconsideration –Recitals in agreement are not operative provisions.
Balboa Park Pool SAN FRANCISCO ARTS COMMISSION CIVIC DESIGN REVIEW – CONCEPTUAL DESIGN April 11, 2014.
Convention Center District Property Owners’ Association Long-Range Strategic Plan May 20, 2008.
The Main Street Bike Lane Project LADOT Bike Program.
The Three Levels of Development Planning 1 Small Area Plan Zone / CDD DSP / DSUP.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
DISTRICT 11 HAMLINE MIDWAY MIXED-USE CORRIDORS 40-ACRE ZONING STUDY City of Saint Paul - Planning Commission December 5, 2014.
Encore Trust California Coastal Commission Hearing June 12, Encore Trust Residence.
Department of Public Works Approval to Install a Memorial in Remembrance of the Armenian Genocide At Memorial Park September 9, 2013.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
Comprehensive Plan Working Groups Annexation Policy Presented by John Dugan December 4,
MED SR 18 Corridor Project MED PID October 13, 2015.
Site # 2010 – 62 Antioch Pedersen 94 to 134 Acres 2440 Crabtree Lane Northbrook, Illinois Phone: Fax:
Distance on a Coordinate Grid How far?  Jenn’s house is 4 miles west and 4 miles north of the center point of the city. Viet’s house is 1 mile.
Indian Hill Grade Separation City Council Meeting February 23, 2016.
Tonight’s Agenda  Project Overview  Existing Parking Summary  Post-It Note Exercise & Discussion  Parking Management Toolbox  Small Group Breakouts.
Vision for Menomonee River Valley Economically, with strong companies and jobs near workers’ homes; Geographically, with renewed ties to the surrounding.
CITY OF NEW BERLIN SECTION 35 Neighborhoods G & H Comprehensive Plan Amendment Public Input January 2012.
Sausalito Bike Racks Research Results January, 2014.
Excerpts from North Loop Neighborhood Plan. The intersection of Airport Boulevard and 51st Street is seen as one of the most important in the neighborhood.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Center Point Area Fire Department SAFETY AND SUSTAINABILITY.
City of Johnston NW55th Avenue Improvements Public Open House June 24, 2014.
Planning & Community Development Department Contract to provide Environmental Consulting Services for the Rehabilitation and Reuse of the Pasadena YWCA.
Mobility for all Modes Update to the Transportation Chapter of the City’s Comprehensive Plan City Council May 27,
Public Hearing on Tax Millage Rates June 16, 2015.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
Reject all bids for Citywide Tree Trimming Services and authorize increases to Contracts No. 21,628 and No. 21,629 with George Salinas Tree Preservation,
City of Charlottesville
Buckner Boulevard Special Purpose District PD 366
A growing bus market Andy Strong Public Transport Manager
S.R. 30A / U.S. 98 / Panama City Beach Parkway
CFT Gateway Center ( E. Foothill Blvd
Presented by Chad Lynn, CAPP Director of Parking Operations
1. Neighborhood Safety Program 2. ICS traffic and security 3
Civic Center Sports Field Study Session & Quarterly Update
Salmon Arm Chamber of Commerce Traffic Study June 2 – 8, 2016 Presentation to City Council November 28, 2016.
Stainless Steel Water Well Casing.
Solid Waste Enterprise Fund: Wildlife Resistant Containers
City of Ocala Leadership Group Meeting January 28, 2016
STATE SUEE AND ONE WAY CORRIDORS
University Center 517 University Center North: Inaccessible Element
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Council Agenda Item #5 February 4, 2019
Student Center A South: Inaccessible Element
City of Fairfax Land Use & Utility Data Request May 30th, 2019
I Street Bridge Replacement Project
Presentation transcript:

CUSTOM BICYCLE RACKS Traffic & Parking Commission January 10, 2013

Bicycle Racks  City Council review November 2012  Post-and-Loop (“Hitch”)  Stainless Steel  Custom design, BH branding  Safety, Functionality, Aesthetics BICYCLE RACKS

Bicycle Racks – Phase 1  Phase 1 – 30 racks  Local Parks and City-owned Structures (14)  Commercial & Restaurant Corridors, including Business Triangle (11)  Rack-on-Request Program for Local Businesses (5) BICYCLE RACKS

City Property  PARKS Beverly Canon Gardens (2) Beverly Gardens (2) Coldwater Canyon Park (1) Greystone Park (1) La Cienega Park (1) La Cienega Tennis Center (1) Roxbury Park (1) Will Rogers Memorial Park (1)  CITY BUILDINGS/LOCATIONS City Hall (2) Public Works (2)

City-Initiated Bicycle Rack Installations Commercial and Restaurant Corridors 1.S. SMB at Charleville Bl. (west side; parking lot) 2.S. SMB at Canon Dr. (near Visitors Bureau) N. Crescent Dr. (west Whole Foods) N. Crescent Dr. (west Beverly Hills Market) S. Beverly Dr. at Gregory Way (east and west side) S. Beverly Dr. at Olympic Bl. (Vons/Pavilions) 7.North Robertson Bl. at Clifton Way (east and west side) 8.South Robertson Bl. at Gregory Way (east and west side)

BICYCLE RACKS Post-and-Loop or “Hitch”

BICYCLE RACKS Dimensions

BICYCLE RACKS Conceptual Designs

BICYCLE RACKS Conceptual Design DESIGN #1

BICYCLE RACKS Conceptual Designs INSERT DESIGN #2 DESIGN #2

BICYCLE RACKS Traffic & Parking Commission’s recommendation for either: 1. Design #1 2. Design #2 3. No Custom Design Recommendation

BICYCLE RACKS 1.City Council Meeting in February Request for Bids (manufacture) 3.Public Notices to Businesses 4.Education Materials 5.Installations on Public Right-of-Way 6.Phase 2 Installation in FY13/14 Next Steps

BICYCLE RACKS END

BICYCLE RACKS References…

BICYCLE RACKS Custom Designs LONG BEACH Approximate cost: Stainless Steel: $1,000 Galvanized: $ 515

BICYCLE RACKS Custom Designs LONG BEACH LADOTNEW ORLEANS

BICYCLE RACKS Preliminary Concept Designs LONG BEACH

BICYCLE RACKS Beverly Hills Urban Design Project LONG BEACH Urban Design Project: Custom Design Stainless Steel $1,100

BICYCLE RACKS Preliminary Concept Designs LONG BEACH

BICYCLE RACKS AQMD Funds Available: $200,000 Post and Loop (assumes 30 units):  Stainless Steel custom:$37,000  Stainless Steel plain:$27,000  17 Hybrid Stainless and 13 Galvanized custom: $30,000  Galvanized custom: $21,000  Galvanized plain: $12,500 Financial

END

Parking Meter Collection