3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.

Slides:



Advertisements
Similar presentations
Agenda Session (75 minutes duration, Friday sessions are 90 minutes) Co-lead introduces the session (5 minutes) –repeat of one chart from opening plenary.
Advertisements

Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Software life cycle processes Purpose n A new international standard (ISO/IEC 12207:1995(E) that –establishes a common framework for software life cycle.
Development plan and quality plan for your Project
Project Execution.
Jürgen Walther Office of the Interministerial Committee for Geo Information (IMAGI) Coordination Office GDI-DE Federal Agency for Cartography and Geodesy.
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
PI2134 Software Engineering IT Telkom.  Layered technology  Software Process  Generic Process (by Pressman)  Fundamental activities (by Sommerville)
Work package in ABC III Specific Contract with PwC/interactive instruments on implementation of INSPIRE validator Clemens Portele, interactive instruments.
HMA January 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order AR January 2011.
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
HMA 5-6 July 2010 – Slide 1 Daniele Marchionni Elsag Datamat Stefania Pappagallo Elsag Datamat HMA Follow On Task 4 - Order MTR 5-6 July 2010.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Progress Meeting 26 Nov 2008, by.
Page 1 Arnaud Cauchy, EADS Astrium 6th of November 2013 ESA HMA AWG HMA-S WP6100 WPS2.0 Specification Session 4: State of the art technology and standards,
Frascati, 15 February 2012 Slide 1 DREAM Task 4 Feasibility Analysis Server and Client - Implementation plans for SPS within the DREAM project Presentation.
1 HMA Follow-on – Negotiation Meeting - Task 4 ESRIN – 24/06/2009 Issue: 1.0.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Frascati, 2-3 July 2008 Slide 1 CITE tests for and HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Nicolas LESAGE, IGN.
HMA-FO ODA, January 2011 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Acceptance.
HMA-FO ODA, February 2010 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Preliminary.
Page /06/2014HMA-S Final Presentation - 11/06/2014 HMA for Science Executive Summary Y. Coene, Spacebel s.a. C. Gizzi, Airbus Defence and Space Final.
Hoeilaart, 19 February 2009 Slide 1 CITE tests for and HMA-T Phase 2 Progress Meeting 19 February 2009, Hoeilaart Nicolas Lesage, IGN.
HMA-T Progress Meeting 26 November 2008 Slide 1 IMAA-CNR activity report HMA-T Progress Meeting 26 November 2008 S. Nativi, E. Boldrini, F. Papeschi IMAA-CNR.
5 July 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) MTR 5 July.
HMA-T Phase 2 KO, 2-3 July 2008 Slide 1 HMA-Testbed Phase 2 Negotiation and KO Meeting 2-3 July 2008, Frascati Yves Coene, SPACEBEL.
HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.
AR meeting Esrin, 26. January 2011 Slide 1 Ordering Services for EO Products Abstract (ATS) and Executable (ETS) Test Suite HMA FollowOn – Task 4 AR Meeting.
Spacebel - Hoeilaart, February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18.
HMA Slide 1 Heterogeneous Missions Accessibility Follow On Pier Giorgio Marchetti - European Space Agency
HMA 23 Feb 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order 23 February 2011.
19 Feb 2009, Spacebel (Hoeilaart) OGC and activities HMA-T Phase 2 AR Meeting 19 Feb 2009, Spacebel (Hoeilaart) Frédéric Houbie, ERDAS.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
FedEO KO 5 June 2007 Slide 1 FedEO Catalogue Session. …
Frascati, 2-3 July 2008 Slide 1 User Management compliance testing for G-POD HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Andrew Woolf, STFC Rutherford.
Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Ricardo.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
HMA Follow On Activities
HMA AWG Configuration Management Status 1 December 2008
Technical Meeting ESA/ESRIN,
HMA Follow On Activities
HMA Follow On Activities
Ordering Services for EO Products SWG ATS / ETS
Project Management Managing Project Execution
HMA Follow On Activities
HMA SPS Mandatory I/F Development
Ordering Services for EO Products SWG ATS / ETS
HMA Follow On Activities
HMA Follow On Activities
Overview of Progress HMA Standardisation Work
HMA-FO Task 1 Workplan HMA AWG 30th of September 2009 Darmstadt OGC TC
HMA-FO Task 1 EOP Metadata
What is software quality?
HMA Follow On Activities
HMA Follow On Activities
Pier Giorgio Marchetti, Philippe Mougnaud European Space Agency
CITE tests for and HMA-T Phase 2 Progress Meeting
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
Ordering Services for EO Products Abstract Test Suite (ATS)
HMA-FO Task 1 Status Frédéric Houbie, ERDAS Steven Smolders, GIM
HMA Follow-on Kickoff Meeting
OGC and activities HMA-T Phase 2 KO Meeting
What is software quality?
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
HMA for Science Task 1 – Project Management
Web Service Security support in the SSE Toolbox
Presentation transcript:

3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly Progress Meeting November

3 November 2009 HMA-FO Task 2: Feasibility Analysis Service  Schedule  Deliverables  Work in Progress sweCommon (OGC ) SPS 2.0 (OGC09-000) SPS for EO Application profile (OGC ) SFRE Requirements Baseline Document

3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Schedule 1/2

3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Schedule 2/2

3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Proposal Information: List of Documentation Deliverables

3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Proposal Information: List of Software Deliverables Software

3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: DEIMOS 1/2  WP 1000: Project Office [Begun – PMP and PAP delivered]  project management, product assurance and configuration management  DEIMOS participation in OGC Technical Committee meetings  WP 3000: Sensor Feasibility Reference Environment  SFRE Requirement Baseline generation  Overall SFRE Technical Specification Generation  Overall SFRE design  4 different configurations. Will include the modelling of Sensor unavailability, Weather conditions, Station unavailability  SFRE server coding and unit testing  SFRE Client/server integration

3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: DEIMOS 2/2  WP 4000: SPS App. Profile for EO - Conformance Testing  Abstract Test Suite creation [Begun – Guidelines from HMA-T for ATS structure compared with existing SPS information]  As part of the SPS EO Application profile specification  Executable Test Suite creation  a set of scripts written in CTL (Compliance Test Language). Process as established in HMA-T  Conformance Testing of the SFRE  the SFRE Server components and use of the TeamEngine (Test, Evaluation And Measurement), an open source compliance test engine extended during the HMA-T project  Overall SFRE Acceptance  aligned to ESA ECSS, the terminology and new approach used within OGC, and new TEAM engine  Acceptance Test Report generation  WP 6000: Warranty

3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: SPOT 1/2  OGC Technical Committee meetings participation [Begun - At Darmstadt in SweCommon DM 2.0, SPS 2.0] - SweCommon Data Model 2.0 WG - SPS 2.0 WG  WP 2000: Completion of the SPS Specification  SweCommon specification completion [Begun – V2 Data Model work - schemas have been generated from UML] - Finalization of the specification : GML 3.2.1, Schemas, examples… - OGC submission and follow-up  Support iGSI to SPS specification completion [Begun] - Contribute to the SPS specification document  SPS EO specification completion - Finalization of the specification : GetSensorWorkload, validation of acquisitions, ATS… - OGC submission and follow-up

3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: SPOT 2/2  WP 3000: Sensor Feasibility Reference Environment  Support to SFRE coding and UT - Update the SPS EO library - Provide a Notification library  Support to SFRE Acceptance  WP 5000: Additional Server Environments Demonstration - SPS Server with Optical Mission Feasibility analysis  WP 6000: Warranty

3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: ASTRIUM  OGC Technical Committee meetings participation - Support DEIMOS and SPOT as necessary  WP 3000: Sensor Feasibility Reference Environment  SFRE RB Generation  SFRE TS Generation  SFRE Design - Contribution to the design of the SFRE system focussing on the client components  SFRE Client coding and testing  WP 4000: SPS App. Profile for EO - Conformance Testing  SFRE Acceptance - Contribution to the Acceptance of the SFRE  WP 5000: Additional Server Environments Demonstration - SPS Server with Radar Mission Feasibility analysis  WP 6000: Warranty

3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: iGSI  WP 2000: Completion of the SPS Specification  Overall SPS specification completion [Begun – The modeling part of SPS 2.0 (and corresponding SweCommon and SweServiceCommon relevant for SPS) are completed. Specification writing in progress]  SPS 2.0 development (current standard: SPS 1.0)  Main work items:  Harmonization with SweCommon / SweCommon services  New interaction models and patterns  New state transition model  Updated bindings & information models  OGC SPS 2.0 Standards Working Group already formed  Timing: M1-M4 (SPS uses SweCommon, therefore depends on [WP2100] SweCommon specification completion)  Presentation at OGC TC Meeting (Fall/Winter 2009). Submission to OGC Voting Process  IGSI support to SPS EO Specification completion