Narrandera Shire Council Infrastructutre Services Rural Roads – Asset Management
Introduction Road network overview Funding distribution breakdown & the effect on asset renewal
Class 4 – Sealed Roads Kolkilbertoo, Kamarah, Kywong Boree Creek, Strontien Roads – 274km Roads are owned by Council funding is from Council’s general revenue 6m sealed width 2X3m lanes 1m gravel shoulder
Class 5 – Gravel Roads – Collector or Link Roads Kangaroo Plains, Paintings Bridge, Axehandle and Garoolgan Euratha Road – 274km Roads are owned by Council funding is from Council’s general revenue 8m Gravel Carriageway
Class 6 – Gravel Roads – Important local access roads Gap, Faithful, Angle, Moombooldool Colinroobie, Geddes, Ellis and Wades Roads – 241km Roads are owned by Council funding is from Council’s general revenue 6m Gravel Carriageway
Class 7 – Gravel/Soil Roads – Minor Local Access Roads Davies, Birrigo Sandigo, Butlers, Inglis Roads– 351km Roads are owned by Council funding is from Council’s general revenue 4-6m Gravel/Soil Carriageway
Class 8 – Unformed Roads – Dry weather/periodical access roads Brewarrina Lane, Campbells, Triggervale, Cowabbie Creek, Garoolgan Meribee and Ryans Roads– 197km Roads are owned by Council funding is from Council’s general revenue Unformed Soil track Bankdale Road
The Big Picture Increasing traffic volumes High Efficiency Transportation – B Doubles & Road Trains Council income is likely to contract due to non-indexation of grants FFTF local government reform is also likely to impact on service delivery – This impact is yet to be determined Our Aim To provide the highest quality road system possible within the constraints we work within Adopt methodologies to improve our road network in a sustainable manner
Funding analysis 6M SEALED WIDTH8M SEAL WIDTH CLASSCAPITAL FUNDINGRENEWAL CYCLECAPITAL FUNDINGRENEWAL CYCLE 4 - Reseal10.60% % % % % % % % %556.90% %960.30%112
Reseal turnover 274km of 6m wide roads = 1,644,000 sqm of sealed roads $137,000 for rural reseals per annum – This is insufficent The reseal turnover is approximately 35 years – Not feasible Shoulder widening to 8m Reseals are taken out to 46 years – Even less feasible Shoulder widening to 8m Reseals are taken out to 46 years – Even less feasible
Why good asset management is required To determine appropriate capital renewal projects To manage assets in a sustainable way To understand the impact of building new assets or upgrading existing assets To enable control of long term maintenance requirements To enable determination of appropriate service levels; 1) Traffic volumes 2) School bus routes 3) Freight needs
QUESTIONS