MUTAC 04 - April 28-29 2004 A. Bross MuCool Overview and Plans Muon Cooling R&D MUTAC 04 A. Bross.

Slides:



Advertisements
Similar presentations
Beam Test of a High-Pressure GH 2 -Filled RF Cavity (for efficient muon beam cooling for a MC or NF, since the low-Z ionization energy-loss absorber and.
Advertisements

MuCool Outlook and Plans  Over the past year we have had a very successful program that will be detailed in the next two sessions: u MuCool Test Area.
MuCool RF Workshop-Fermilab 107/07/2009 Muons, Inc. Dielectric-Filled RF Cavities Milorad Popovic FNAL.
The Muon Accelerator Program “High”- Gradient Normal Conducting RF R&D Alan BrossUS HG Workshop February 9-10, Meeting the RF in Magnetic Field Challenge.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
MICE LH2 Operating Parameters Mary Anne Cummings MICE October ‘02 LBL Oct. 24, 2002.
MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002.
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
2/7/2002 RolMUCOOL/MICE1 20b. Gaseous Energy Absorber, 21a. High Pressure RF Cavities New Money for New Approaches DOE Small Business Innovation Research.
July 28, 2004K. Yonehara, NuFact'04 Osaka1 High pressure RF cavities for muon beam cooling Katsuya Yonehara Illinois Institute of Technology NuFact04 in.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
LH2 Absorber Heat Load and Homeostasis. What has happened before… 1.Huge LH2 volumes, low heat deposition: Bubble chambers 2.Small LH2 volumes, low heat.
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
MUTAC Review 3/16/06 A. Bross MuCool Overview and Plans Muon Cooling R&D MUTAC Review March 16, 2006 A. Bross.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
LH2 Manifold R & D 1.The driving physics issue in Mucool LH2 R & D is now fluid flow and heat removal 2.Two separate absorber designs 1.What is “certification”?
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
5-Year RF R&D Plan Derun Li Lawrence Berkeley National Laboratory NFMCC and MCTF Phone Meeting Friday, September 18, 2009.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
NCRF R&D Programs and Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 28, 2004.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
1 Alan Bross MUTAC April 9, 2008 MuCool Program Overview Muon Cooling R&D Alan Bross.
The Neutrino Factory and Muon Collider Collaboration R&D Program and Participation in the IDS.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MUCOOL RF Program Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 18, 2007.
Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
A. Bross MUTAC Meeting BNL April MuCool Overview Muon Cooling R&D Alan Bross.
MCTF C. Johnstone MUTAC Meeting 8-10 April Debut of the MTA beamline Description, status and commissioning plans.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Steve Geer OsC RAL 21 June, Muon Accelerator Program MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S.  
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
805 MHz Status IIT NFMCC Meeting March 12-15, 2006 A. Moretti March 12, 2006.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
RF studies at Fermilab MuCool Test Area Fermilab MuCool Test Area MuCool Test Area (MTA) at Fermilab is a dedicated facility at the end of the LINAC built.
Recent progress of RF cavity study at Mucool Test Area Katsuya Yonehara APC, Fermilab 1.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
NFMCC Meeting 3/12/06 A. Bross MuCool Overview Muon Cooling R&D NFMCC Meeting March 12, 2006 A. Bross.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Harold G. Kirk Brookhaven National Laboratory Report from the NFMCC MUTAC REVIEW Lawrence Berkeley National Laboratory April 8, 2008.
DOE Program Review 5/17/06 A. Bross Muon Accelerator R&D DOE Program Review May 17, 2006 A. Bross.
NFMCC Meeting 3/12/06 A. Bross LiH Absorbers Muon Cooling R&D NFMCC Meeting March 12, 2006 A. Bross.
A. Bross MICE CM17 February MuCool RF Program 805 and 201 MHz Studies.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
Summary of radiation shielding studies for MTA Muon production at the MiniBooNE target Igor Rakhno August 24, 2006.
Dazhang Huang MUTAC Review LBNL, April 2008 Fermilab MTA 805 MHz RF Program.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005.
Progress of high pressure hydrogen gas filled RF cavity K. Yonehara APC, Fermilab 11/02/111 Joint MAP & High Gradient RF Workshop, K. Yonehara.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
RF R&D (Issues) for Muon Ionization Cooling Channels
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
Overview of the RFCC Module and 201-MHz Cavity Design
Progress and Issues with VTS Upgrade
Presentation transcript:

MUTAC 04 - April A. Bross MuCool Overview and Plans Muon Cooling R&D MUTAC 04 A. Bross

MUTAC 04 - April A. Bross This Review  MuCool presentations for this afternoon u OverviewBross u NCRFLi u RF StudiesTorun u LH 2 Absorber WindowsCummings u LH 2 Absorber TestsIshimoto u Cooling Channel InstrumentationErrede u Gaseous CoolingJohnson

MUTAC 04 - April A. Bross The MuCool Collaboration  Consists of 18 institutions from the US, Europe, and Japan RF Development ANL Fermilab IIT JLAB LBNL Univ. of Mississippi Beam Diagnostics ANL Fermilab IIT Princeton Univ. of Chicago Absorber R&D Fermilab IIT KEK NIU Oxford UIUC Univ. of Mississippi Univ. Osaka Solenoids LBNL Cooling Demonstration (MICE) ANL BNL Fermilab Fairfield IIT Iowa JLab LBNL NIU UCLA UC Riverside UIUC Univ. of Chicago Univ. of Mississippi  Mission u Design, prototype and test all cooling channel components u Perform high beam-power engineering test of cooling section u Support MICE (cooling demonstration experiment)

MUTAC 04 - April A. Bross MuCooL Management Structure  Spokesperson and Technical Area Leaders: u Spokesperson:Alan Bross u Technical Area Leaders: s RF:Al Moretti, FNAL Derun Li, LBNL s RF Diagnostics:Yagmur Torun, IIT s Absorbers:Mary Anne Cummings, NIU s MuCooL Test Area:Milorad Popovic, FNAL

MUTAC 04 - April A. Bross SFOFO Cooling Lattice  R&D Focus of MuCool u Component testing Fermilab s High Power –Both RF and Beam u System test - RAL

MUTAC 04 - April A. Bross Research and Development Challenges  Can NCRF cavities be built that provide the required accelerating gradients? u AND operate in multi-tesla fields!  Can the heat from dE/dx losses be adequately removed from the absorbers? u On the order of 100’s W for a neutrino factory  Can the channel be engineered with an acceptably low thickness of non-absorber material in the aperture? u Absorber, RF, & safety windows  Can the channel be designed & engineered to be cost effective?

MUTAC 04 - April A. Bross MuCool Test Area The MuCooL Collaboration Enters a new Era “Escape from the Wilderness”

MUTAC 04 - April A. Bross MuCool Test Area  Facility to test all components of cooling channel (not a test of ionization cooling) u At high beam power s Designed to accommodate full Linac Beam s 1.6 X Hz – 2.4 X p/s –  600 W into 35 cm LH MeV u RF power from Linac (201 and 805 MHz test stands) s Waveguides pipe power to MTA Is Now Complete!

MUTAC 04 - April A. Bross MTA  The MTA is becoming our focus of Activity u LH 2 Absorber tests u RF testing (805 and 201 MHz) u Finish Cryo-Infrastructure u High pressure H 2 gas absorbers u High Intensity Beam

MUTAC 04 - April A. Bross MTA Tour Compressor Room Access Pit

MUTAC 04 - April A. Bross MTA Tour H 2 Buffer Tank H 2 Manifold Room

MUTAC 04 - April A. Bross MTA Tour Access Pit

MUTAC 04 - April A. Bross MTA Tour MTA Experimental Hall

MUTAC 04 - April A. Bross MTA Tour KEK LH 2 Absorber

MUTAC 04 - April A. Bross MTA Tour MTA Experimental Hall From Linac (Lots of Activity)

MUTAC 04 - April A. Bross MTA Tour View from Wilson Hall RF Trench visible

MUTAC 04 - April A. Bross MTA – Near Term Schedule

MUTAC 04 - April A. Bross KEK Absorber MTA – RF Configuration Currently plan to operate either RF or LH 2 /H 2 tests, but not both simultaneously. We are discussing with the Laboratory how we can work in both modes simultaneously.

MUTAC 04 - April A. Bross Towards Experimental Hall Refrigerator Room Tevatron satellite refrigerator to be operated on 5 K mode and 14 K mode (3” DE, 3” WE) Helium and nitrogen Dewar Compressor Room Two 400 HP 2-stage oil injected screw compressors Transfer line connections to experimental hall which includes 5K, 20K, 80K circuits Heat exchanger MTA Cryo-Infrastruture

MUTAC 04 - April A. Bross MTA High Intensity Beam MTA  FNAL Study group has been formed to design 400 MeV beamline for the MTA u Under Craig Moore s External Beams Department u Develop Engineering Design s Cost s Schedule u Safety Analysis s Linac Area and Beamline s Shielding Assessment for MTA –Essentially Complete u Preliminary thoughts s “Spin” beam in order to provide large (30 cm) aperture –Instead of large Quads –Simpler and therefore Cheaper u Timeline still driven by resource availability

MUTAC 04 - April A. Bross MTA Shielding Assessment  Conclusions from Present Study u A credible beam accident at MTA is less severe than normal operation. u At normal operation the following classification is suggested (Fermi RCM): u Berm above target hall – Controlled Area of minimal occupancy (0.25 – 5 mrem/hr); u Access pit – Radiation Area with rigid barriers/locked gates (5 – 100 mrem/hr); u Cryo room - Radiation Area with rigid barriers/locked gates (5 – 100 mrem/hr); u Compressor room - Controlled Area of minimal occupancy (0.25 – 5 mrem/hr); u Parking lot – Normal (not controlled) area (dose rate below 0.05 mrem/hr).

MUTAC 04 - April A. Bross RF Cavity R and D ANL/FNAL/IIT/LBNL/UMiss

MUTAC 04 - April A. Bross RF Cavity R&D – Prototype Tests  Work to date has focused on using 805 MHz cavities for test u Allows for smaller less expensive testing than at 201 MHz u Lab G work at Fermilab  Unfortunately due to a Klystron failure in the Linac, the Lab G Klystron had to be moved back to the Linac u As of December 25, 2003 the Lab G facility ceased operation  We are now moving as rapidly as possible (with a great deal of support from the Fermilab Beams Division) to bring up 805 and 201 MHz RF test capability to the MTA u Moving Vacuum, power, etc systems to MTA u Move Magnet to MTA Lab G RF Test Cave showing 5T SC Magnet 44 cm bore R.I.P.

MUTAC 04 - April A. Bross RF Cavity R&D – Quick Review  Open cell cavity reached peak surface field of 54 MV/m (25 on axis) u Large dark currents s Damage to windows s Punctured Ti window in worst case  Closed Cell (single) cavity u B=0, Cu window – Low Bkg. s Reached 34MV/m u With B field s TiN coated Be window (0.01”) s Initially conditioned to 16MV/m –Dark currents then rose s However, no damage in evidence to Be –Copper contamination From iris/flange surface s At 8MV/m dark currents very low –Acceptable for MICE Closed Cell Cu window

MUTAC 04 - April A. Bross RF Cavity Closed Cell Magnetic Field Studies  Data seem to follow universal curve  Sparking limits max gradient  Copper surfaces the problem Peak Magnetic Field in T at the Window Gradient in MV/m

MUTAC 04 - April A. Bross RF R&D – 201 MHz Cavity Design  Design Complete and Fabrication well under way u Expect E pk surf = 19 MV/m (17 MV/m on axis) u Now has curved windows u Goal is to have a 201 MHz cavity under test at Fermilab in the Fall Cavities in Coupling Coil

MUTAC 04 - April A. Bross RF R&D – 201 MHz Cavity Design Tube-Grid Aperture Study  Finite Element analysis of tube grid design u First applied to electromagnetic model of 805 MHz cavity s For Lab G test Grid Model Electric Field Magnetic Field Maximum Surface Field Enhancement 4x4-Connected x4 -Waffle x6 -Waffle x6 Middle- Concentrated/Waffle 1.40 Tube DIA (cm) Grid Thesis work of Mohammad M. Alsharo’a IIT

MUTAC 04 - April A. Bross Absorber R and D IIT/KEK/NIU/Osaka/Oxford/UIUC/UMiss

MUTAC 04 - April A. Bross  2D Transverse Cooling and  Figure of merit: M=L R dE  /ds M 2 (4D cooling) for different absorbers Absorber Design Issues H 2 is clearly Best - Neglecting Engineering Issues Windows, Safety

MUTAC 04 - April A. Bross Absorber Design Issues  Design Criteria u High Power Handling s Study II – few 100 W to 1 KW with “upgraded” (4MW) proton driver s 10 KW in ring cooler –Must remove heat u Safety issues regarding use of LH 2 (or gaseous H 2 ) s Window design paramount –H 2 containment s Proximity to RF adds constraints (ignition source) u Window material must be low Z and relatively thin in order to maintain cooling performance H 2 implies engineering complexity

MUTAC 04 - April A. Bross Absorber R&D  Two LH 2 absorber designs are being studied u Handle the power load differently Forced-Convection-cooled. Has internal heat exchanger (LHe) and heater – KEK System Forced-Flow with external cooling loop

MUTAC 04 - April A. Bross Convection Absorber  Convection is driven by beam power and internal heaters  LHe heat exchanger removes heat from absorber walls  Two-dimensional Computational Fluid Dynamics calcs u Flow essentially transverse u Max flow near beam u Heaters required to setup convective loops

MUTAC 04 - April A. Bross Forced-Flow Absorber  Heat removed with external heat exchanger u LH 2 pumped from absorber to heat exchanger u Nozzles in flow path establish turbulent flow u Simulation via 2D and 3D FEA

MUTAC 04 - April A. Bross Absorber Windows  Thin windows are required in all absorber designs u Critical design issue s Performance s Safety u First examples made with AL T6061 u Maybe even thinner with s Al-Li alloy Containment Windows Vacuum Absorber Design Iteration HemiSpherical – Inflected (Now also used for RF)

MUTAC 04 - April A. Bross Gaseous Absorber – Muons Inc  Work on STTR Phase II u 805 MHz test cell s Tested at Lab G u Cell conditioned at K u Max stable gradient   80 MV/m  Data agree well with Paschen Law up to  200 psig

MUTAC 04 - April A. Bross Beam line Instrumentation  CVD Diamond u For beam diagnostics can be very thin  Lots of charge – 36 e-h/  m-mip u Rad Hard u Low-quality (small mfp) might be useable u First prototypes have been tested s Very Fast (limited by electronics) s Large signal s Some of the diamond is approx. linear over full intensity range (3 X e - /cm 2 ) –Needs more study  MTA Instrumentation u Intrinsically safe solution s Temperatures, Magnet currents, BPMs. s Local readout (PC) + ACNET

MUTAC 04 - April A. Bross Simulation Work  Cooling Components as mentioned u Absorbers – 2D and 3D Finite Element Analysis (FEA) 2D Computational Fluid Dynamics (CFD) u RF – Electromagnetic modeling of Be windows and grids FEA modeling of window deflection/stress  Quad-focused cooling channel  Study II cooling channel u GEANT4 simulation including latest window design  MICE u GEANT4 framework developed

MUTAC 04 - April A. Bross MuCool and MICE  Muon Ionization Cooling Experiment (MICE) u Demonstration of “Study II” cooling channel concept  MuCool Collaboration interface to MICE u Design Optimization/develop of Study II cooling channel s Simulations u Detailed engineering s Full component design s Systems integration s Safety u RF cavity development, fabrication, and test u Absorber development, fabrication, and test u Development of beam line instrumentation u MuCool will prototype and test cooling hardware including MICE pieces for which the collaboration is responsible  High-intensity Beam Tests are responsibility of MuCool and are, of course, fully complementary to MICE

MUTAC 04 - April A. Bross MuCool Plans  Continue development of thin windows for absorbers u Already within the material budget of Study II even with the extra windows  Begin work in the MuCool Test Area (MTA) u KEK LH 2 absorber test first. Phase I complete by mid-May, second set of tests in August u Provide 201 & 805 MHz capability for MTA u Move Lab G magnet to MTA u Continue 805 MHz RF studies in Lab MTA (starting in June) s Window and grid tests s Surface treatment/materials tests –Effect on dark current and breakdown u Provide as much of the cryo infrastructure as funding allows s Very likely ALL of it u Fabricate first 201 MHz cavity and bring to MTA for test s On Schedule for delivery in Fall  In FY05 u Start 201 MHz RF test program in MTA s 805 MHz testing likely to continue interleaved with 201 testing u Complete MTA cryo (if needed) u Fabricate coupling-coil prototype s If funding is available u Begin installation of 400 MeV beam line from Linac  In FY06 u Bring high intensity beam to MTA s Test complete set of cooling components in high intensity beam

MUTAC 04 - April A. Bross Conclusion  Excellent progress has been made in the last year u MTA is complete s On budget and on schedule –HVAC is late s Absorber testing underway s RF test program to begin in June (805 and then 201 in Fall) –NCRF R&D has demonstrated High Gradient low dark current operation –R&D continues in order to continue to push HG Low DC operation in B field –Use of Be RF windows looks promising u Design of LH 2 absorbers and windows has matured s “Thin” window required spec appears to have been met u Detailed engineering of components has matured  MuCool is a thriving International Collaboration u Absorbers – Japan u Absorber/Window design – UK u Addressing many of the needs of MICE