Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.

Slides:



Advertisements
Similar presentations
Hydrologic Modeling with HEC-HMS
Advertisements

Applications of LIDAR Data in the McPherson Watershed, Fort Bragg, North Carolina Beth M. Wrege and Michelle Cienek.
15 March 2012 WATERSHED Science & Engineering WEST Consultants.
Terrain for the Lower Colorado River Flood Damage Evaluation Project Erin Atkinson, Halff Associates, Inc. Rick Diaz, Lower Colorado River Authority Symposium.
Fort Bragg Cantonment Area Background The USGS is working with the U.S. Army at Fort Bragg to develop a Storm Water Pollution Prevention Plan (SWP3). The.
Hydrologic Simulation Models
Agenda Item 9 Sutter Bypass CVFPB Meeting April 17, 2009.
CURVE NO. DEVELOPMENT STEP 8 Soils data, land use data, watershed data, and CN lookup table are used to develop curve numbers for use in the SCS Curve.
Harris County (Fig. 3) was chosen as the area of study for this project. The three phases described in the methodology above was used for this area. Six.
PrePro2004: Comparison with Standard Hydrologic Modeling Procedures Rebecca Riggs April 29, 2005.
Floodplain Mapping using HEC-RAS and ArcView GIS Eric Tate Francisco Olivera David Maidment
Cassandra Rutherford Master of Science Candidate Department of Civil Engineering Department of Civil Engineering Identifying Bridge Scour Susceptibility:
Application of HEC- HMS for Hydrologic Studies Texas A&M University Department of Civil Engineering CVEN689 – Applications of GIS in CE Instructor: Dr.
Processing Geospatial Data with HEC-GeoRAS 3.1
Application of GIS Tools for Hydraulic Modeling
CE 397 Flood Forecasting Lecture 3: Review of Concepts and Definitions.
Texas A&M University, Department of Civil Engineering CVEN 689 Applications of GIS in Civil Engineering Professor: Dr. Francisco Olivera Student: Brad.
Texas A&M University Department of Civil Engineering Cven689 – CE Applications of GIS Instructor: Dr. Francisco Olivera Logan Burton April 29, 2003 Application.
Fort Bragg Cantonment Area Cape Fear River Basin LIDAR data have been used to create digital contours and topographic maps. 1.A Digital Elevation Model.
CE 515 Railroad Engineering Drainage Source: AREMA Ch. 5, J. Rose Lectures, Ch. 19 “Transportation exists to conquer space and time -”
David Knipe Engineering Section Manager Automated Zone A Floodplain Mapping.
APPLICATION OF LIDAR IN FLOODPLAIN MAPPING Imane MRINI GIS in Water Resources University of Texas at Austin Source. Optech,Inc.
3-in-1 Stream Restoration Using AutoCAD® Civil 3D®, Map 3D, and Autodesk® Storm and Sanitary Analysis Heather Nagel Application Engineer.
Civil and Environmental Engineering Applications.
FNR 402 – Forest Watershed Management
Comprehensive Basinwide Protection Recommendations 13 Primary Principals: 1.Serve as framework moving forward 2.Establish acceptable levels of protection.
Interface data models Model 1 Model 2 Model 3 GIS Geo Database Arc Hydro data model Geographically Integrated Hydrologic Modeling Systems.
North Carolina CTS Committee Meeting #9 June 19, 2001.
Hydrologic Cycle. Hydrologic Cycle Processes Surface Water Soil water Atmospheric water Groundwater Processes Precipitation Evaporation Surface Runoff.
Morphum Environmental Ltd Environmental Engineers and Consultants
Flow Time Time Series Hydro FeaturesHydro Network Channel System Drainage System ArcGIS Hydro Data Model.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
ArcHydro – Two Components Hydrologic  Data Model  Toolset Credit – David R. Maidment University of Texas at Austin.
GIS in Watershed Analysis. Why watershed Analysis with GIS? Concepts Important datasets Analysis Tools.
by David M. Beekman and Vito A. Cimino
Assessment of Economic Benefits of the North Carolina Floodplain Mapping Program Hydrologic and Hydraulic Case Studies Adapted from a Presentation to NRC.
Comprehensive Policy Plan Amendments Wekiva Parkway and Protection Act December 18, 2007 Comprehensive Policy Plan Amendments Wekiva Parkway and Protection.
Flood Map Modernization and North Dakota Julie Prescott, ND Map Modernization Coordinator North Dakota State Water Commission And Brian Fischer, CFM, GIS.
U.S. Department of the Interior U.S. Geological Survey Marie C. Peppler USGS FIM Program Liaison Flood Inundation Mapping Program Project needs overview.
HYDROLOGIC DATA. BACKGROUND Analysis and synthesis of data is required to perform any hydrologic computation. The engineer needs to: Identify and define.
Multiple Purpose Dam & Reservoir
US Army Corps of Engineers BUILDING STRONG ® Cooperative Efforts in Nashville Flood Preparedness Jamie G. James, P.E. Water Resources Section Nashville.
Development of a Geographic Framework for an Integrated Flood Modeling System Oscar Robayo Tim Whiteaker August 10, 2004 University of Texas at Austin.
Surface Water An Erosional-Depositional System. Running Water When running water is confined to a channel, it is called a stream Smaller streams called.
1 Integrating Water Resources Engineering and Geographic Information Systems (GIS) National Weather Service NWSRFS International Workshop October 21-23,
Arc Hydro and Modeling Intrinsic Modeling – within a particular application eg Excel, ArcGIS Dynamic Linked Library – tightly coupled package of functions.
Map-Based Flood Hydrology and Hydraulics David R. Maidment Jan 10, 1998.
LiDAR (Light Detection And Ranging) is a technology that can be used as a topographic survey for many projects, including wetland creation. Flying LiDAR.
Introduction to GIS in Water Resources David R. Maidment Director, Center for Research in Water Resources University of Texas at Austin CRWR.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
HEC-RAS Version 3.1 Overview
Flood Inundation Mapping Program
Central Valley Flood Protection Board Meeting – Agenda Item No. 8A Informational Briefing Presented By Board Staff and CH2MHill Consultants Model Funded.
Introduction to Urban Hydrology
Hydrologic Objects for Modeling: One Viewpoint Thomas A. Evans US Army Corps of Engineers Hydrologic Engineering Center.
Rio Grande Rectification Reach FLO-2D Model Development Presentation to: New Mexico – Texas Water Commission and Paso del Norte Watershed Council Project.
LIDAR Flood mapping for Brownsville and Matamoros Gueudet Pierre GIS in Water Resources University of Texas Austin Fall 2002.
DES 606 Watershed Modeling with HEC- HMS Advanced Topics.
US Army Corps of Engineers BUILDING STRONG ® Proposed Floodplain Inundation Mapping on the Flathead River Travis Ball Hydraulic Engineer
Hurricane Irene in Connecticut River Milena Spirova CE 394 K 2015.
1 Byung Sik, Kim Kangwon National University Advanced Hydrology and Water Resources Management.
English Bayou Basin Storm Water Master Plan Presentation to Calcasieu Parish Police Jury Lake Charles April 29, 2010.
Map-Based Hydrology and Hydraulics
Proposed CSES research in hydrology and water resources
Lesson Two: Information Gathering
Hydrology.
Risk Mapping, Assessment, and Planning
Regional Hydraulic Model for the City of Austin
Automated Zone A Floodplain Mapping
Presentation transcript:

Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental Consultants

Project Team C.H. Fenstermaker and Associates, Inc. has been contracted by the Calcasieu Parish Police Jury to develop a Stormwater Master Plan to address the flooding issues and future development within the Sabine River and Bayou Lacassine Basins.

Project Objectives The main objective of the Stormwater Master Plan project is to setup hydrologic and hydraulic models to better understand the drainage system and evaluate potential projects to reduce flooding. A Stormwater Master Plan, guided by the model results, will be developed to identify channel cleaning needs, assess structure capacities, develop a maintenance plan, and determine the impact of any future developments.

Project Schedule and Tasks Fenstermaker began work on this project in April 2010, and plans to be complete by the end of December Fenstermaker is performing the following tasks for the completion of this project: –Gather and compile existing geospatial, hydrologic, climatic, environmental, and socioeconomic data –Collect topographic and bathymetric surveys on channels and structures –Setup, calibrate, and validate hydrologic and hydraulic models –Setup a GIS database of maps and layers pertaining to the Sabine-Lacassine study areas –Develop a Stormwater Master Plan –Transfer data for future Parish use –Train Parish staff to run the models.

Project Area The Sabine-Lacassine study area is comprised of laterals located in the Sabine River and Bayou Lacassine drainage basins.

Topographic Survey The initial survey concluded May 2010 where approximately 90% of the topographic survey data had been collected and processed. The remaining 10% of the data will be collected during August 2010 based on modeling needs. Expected Geometric Features to be Surveyed 188 Cross Sections 38 Bridges 39 Culverts 2 Pipeline Crossing

Surveyed Structures

LiDAR Data Light Detection and Ranging (LiDAR) data was used to determine the flow paths, flow direction, and basin boundaries. LiDAR data is obtained through the LSU Atlas website and provides elevation data on a 5 meter by 5 meter grid.

Basin Map The Fenstermaker Team has identified four major basins with separate outfall points. These basins represent the areas which are directly drained by a channel system and a network of tributaries. Each of these basins has been divided into multiple smaller basins (sub-basins) which have been analyzed in the Army Corps of Engineers Hydrologic Modeling Program HEC- HMS to determine the total runoff from each sub-basin.

GIS Database The Fenstermaker Team is working jointly with the Calcasieu Parish Police Jury to develop an extensive GIS database for the Sabine- Lacassine study area. Sample GIS database files such as Soil Maps and Land Use Land Cover (LULC) data have been collected from NRCS and USGS.

Project Status The Fenstermaker Team is currently working on the setup of the HEC-RAS and HEC-HMS models for the Sabine-Lacassine Basins. The models will be complete with the recommended Capital Improvement Projects by October 2010 and the final Stormwater Master Plan report detailing the maintenance plans, and recommendations for reducing the impact of future development is scheduled to be completed by the end of December 2010.

Visit our website at Engineers ∙ Surveyors · Environmental Consultants Experience ∙ Innovation · Results