Drafting TV Flats.

Slides:



Advertisements
Similar presentations
How to read plans, The designer has the vision or dream of what to create on stage. Drafting allows the designer to communicate the dream to craftspeople.
Advertisements

Common Components of a Traditional Wood Framed Building
Stagecraft 3D scenery Not everything in the world is rectangular. To create natural shapes or curved, irregular shapes we use construction methods different.
Cabinet and Countertop Installation
Introduction To Trim Copyright © Texas Education Agency, All rights reserved.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
ICRA Panel System Installation Instructions
Residential Framing Prints Unit 14.
Theatre Terminology Apron
Quick and Easy Model Building. 3D Models Purpose: To represent the final design in a physical form that is as realistic as possible, computer- generated.
All About Flats By Samantha Lee. What is a flat? Theatre flats are large pieces of constructed and painted wood that are placed on the stage to serve.
Bricking the Mason 2x4 Evaporator
Skilled Trades 1201 Floor Framing
TWO POINT PERSPECTIVE procedure
Cabinet Making 101 Julian Gonzalez El Toro High School Teacher-Woodworking.
Residential Construction Unit 6 Interior finishes Mr. Todzia.
Drafting Rear Elevations. Start with outer frame when drafting standard flat. Heights are generally in multiples of 2’-0”. Outer Frame.
Mini Flat Journal Prep Pg. 37 1)Cut the All About Flat notes. 2)Fold in half. Glue the Top part of Title down. 3)Place at the bottom of the page. 4)Leave.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Window Details (Wood) Window Assembly u Finished window assembly depends on: –architectural design of structure –region of country/climate –material.
Scenic Materials. Scene Shop  This area has space and equipment to convert the designer’s plan into the complete scenery with the least effort, by the.
The Set Designer Who does a set designer discuss sets with? Who does a set designer discuss sets with? Why? Why? What do set designers do before setting.
SCENE (SET) DESIGN DESIGNING SCENERY FOR THEATRE STAGECRAFT- MR. WOFFORD.
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe SESSION 2.
Scenic Production and Painting Technique
Scenery. Getting Started  The director, technical director, or scenic designer will carefully study the script to design a floor plan for each scene.
Construction Framing Mr. Brock. Lumber 2x4s are not actually 2” by 4”
Floor Framing Unit 29.
Wall and Ceiling Construction
Building the Footstool P R O J E C T O V E R V I E W.
Garden Sheds. Agenda Overview – Next level – good example to teach construction skills – Includes layout skills – transferable to other projects – Orientation.
Common Components of a Traditional Wood Framed Building
INTD 54 other components. moldings cover, enhance and decorate a plain surface standing trim: fixed length—doors & windows.
Stage Construction Theatre Workshop I. The Stage Crew  Set construction crew- build the set  Set designer- creates the design/idea for the set that.
Ag Construction Studs Vertical framing boards are called.
Construction of “Curio” style Cabinet by Miguel Del Real.
 Sets included: › Painted walls of city streets and a large central entrance–forerunner of the proscenium arch. › Prism sets and raked stages were sometimes.
 Overview of Interior Finishes  Types  Examples.
Sheet Metal: Notes and Descriptions MachinesProceduresTools.
Greenfaulds High School. 2 Point Perspective Two views of a house are shown. Using VP1, VP2 and X as the lowest point, sketch a 2-point perspective view.
Stock Scenery. Anything built by a theatre company that can be used in more than 1 production - -- it is usually stored after a show (strike) and pulled.
An overview of Curtains, Rigging, and Scenery Construction
Set Construction Essential Question:
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
APPLICATIONS OF TECHNOLOGY
SUBJECT - Technical Terms OF Doors And Types Of Doors.
_________-The part of the stage floor extending beyond the proscenium arch into the house Theatre Terminology Apron.
Introduction to Elevations
Set Design. The set is the visible scenery that the audience sees including but not limited to buildings, forests, pretty much anything your mind can.
Warm-up 9/20/16 What is the underlayment called below the shingles?
OBJ: SWBAT create a CAD Rendering of a Utility shed.
APPLICATIONS OF TECHNOLOGY
Scenic Design.
Construction Framing Mr. Brock.
Wood Frame Systems Civil Engineering and Architecture®
Unit 6.05 and 6.06-Learning about blueprints
Warm-up 9/19/16 What template are we using?
Introduction to Elevations
Scenic design (also known as scenography, stage design, set design or production design) is the creation of theatrical, as well as film or television scenery.
Wood Frame Construction
Graphic Communication
Common Components of a Traditional Wood Framed Building
SUPPORT FRAME ASSEMBLIES, 4 REQUIRED
Wall Details - Reveals/Returns/Door Openings
Wall and Ceiling Construction
Elevations, Layout and Drawing Technique.
FUNDAMENTALS OF THEATRE I
Presentation transcript:

Drafting TV Flats

TV Flat Basics The TV Flat is also known as the Hollywood Flat. The Standard Flat and the TV Flat have many similarities including the names of the parts of the flat. The basic TV Flat is built with a 1x4 lumber frame and is covered with 1/4” luan. Door openings and window openings often use 1x6 framing to create a 6” reveal. The frame is usually assembled with Screws, or pneumatic staples. The luan cover is usually attached with pneumatic staples or 3/4” coated nails. The major differences are: 1) The TV flat frame is built on edge rather than on its face. 2) The TV Flat must have a hard cover while the standard flat can be soft or hard covered.

Keeps the frame as light as possible. Helps keep the face smooth. TV flat TV flats must have a framing member to support all of the internal luan seams. Benefits: Keeps the frame as light as possible. Helps keep the face smooth. Disadvantages: Requires very careful construction. Only 3/8” to support each edge of am intenal luan seam. Toggles are placed every 4’-0.” They are places on center or off set depending on the size of the flat and the construction needs. The luan cover of the flat is what brings the flat into square.

The TV Flat door unit is similar to the standard flat door unit. TV Door Flat The TV Flat door unit is similar to the standard flat door unit. Care must be taken to support all inner seams. The size of the luan plywood also affects placement of toggles. A 1x6 is often used for the bottom rail because it often serves as a door sill. Not the use of 1x6 for the door opening to create the door reveal. The other option is to make a door opening with 1x4 and insert a pre-hung door in an existing 1x6 door frame. Both options are acceptable.

The benefit of this technique is the clean look of the TV Flat. TV Window Flat The construction of a TV window flat frame follows the same basic procedures as the TV door flat frame. This window flat can be covered with one sheet of luan plywood and then the opening can be cut out with a router.(A sabre saw can also be used but it will not give as clean a cut) This process can be more costly but it will result in a square flat and there are often places to use the cut off pieces. The benefit of this technique is the clean look of the TV Flat.

Part of Detailed Floor Plan One problem with TV flats is that more care must be taken in planning the layout of the flats before building. Note here that wall “C” must be 7 1/2” longer then what is seen on stage to permit assembly. There is also a problem with the ends of the flats that are visible to the audience. One technique is to rip strips of of luan and put them on the ends as needed. A second and cleaner method can be used if the show is being built from scratch. Ex: Plan on extending the cover of flat A to cover the end of flat B that joints A at a 90° angle. See next plate for wall rear elevations

Rear Elevation

Comparing the Standard Flat and the TV Flat The choice between Standard Flats and TV Flats is up to the Set Designer and the production team based on many variables. There are no exact rules about which are best choice for any given show. Only occasionally are they both used in a set. The Set Designer and the Technical Director should start by considering the needs of the set design, the limitations of the production budget, the available man-hours and the amount of stock scenery that must go into the set. Then, they can take into consideration how the set is being used by the actors; if the set is going to be used in repertory; if the set is going to tour; if the set is going into storage at strike and other factors. If the show is being built from scratch the cost difference between TV flats and Standard Flats can often be minimal. The cost of the materials for the framing of the flats should be the same. Muslin and luan will often be around the same price even when the muslin in bought in bulk rolls of 50+ yards. One technique that increases the cost of the TV flat is to cover the luan with muslin. This results in a better painting surface but increases the cost of the flats by at least 1/3 of the original cost estimate.

Standard Flat Set This set was built using standard flats pulled from stock with additional flats built for the curved windows. This choice was based on cost restrictions and the TD’s decision on how to put the set together. The seams were hidden with muslin dutchmans. The painting techniques hid the duchmans. the molding and trims were all 3 dimensional and gave the set a very realistic look.

TV Flat Set This set used TV flats. The bricks were made of foam that were applied to the TV flat with construction adhesive. The choice of TV flats was based on the hard surface that permitted easy attachment of the bricks and the added structure of the TV flats. The platform was also faced with luan so the surface of the brick walls was consistent.

TV Flat Set This set used TV Flats for the walls. All of the walls were half walls. The set was one of two sets used for each performance. The TV flats were joined together with screw and change-over took under five minutes.