SESSION 3 Tuesday 10.00 – 10.45 Writing the Business Case.

Slides:



Advertisements
Similar presentations
Project Appraisal Module 5 Session 6.
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
Options appraisal, the business case & procurement
Indicative Business Case
INVESTMENT APPRAISAL NON DISCOUNTING By Lucky Yona.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Value for Money Edward Farquharson 12 May Agenda Development of the UK’s approach to ex ante VfM assessment Ex post VfM assessment Some observations.
Need to Invest Investment Objectives and Case for Change Determine Potential Value for Money Strategic Case: Economic Case: Financial Case: Affordability.
Castellanza, 20 th October and 3 rd November, 2010 FINANCIAL INVESTMENTS ANALYSIS AND EVALUATION. Corporate Finance.
Risk Analysis & Management. Phases Initial Risk Assessment Risk Analysis Risk Management and Mitigation.
Feasibility Study Preparation Venelina Varbova. Session Overview  Purpose of the Feasibility Study  The Feasibility Study process according.
1 © 2012 John Wiley & Sons, Ltd, Accounting for Managers, 4th edition, Chapter 14 Strategic Investment Decisions.
Project Estimation Describe project scope, alternatives, feasibility.
The Analyst as a Project Manager
PROJECT EVALUATION. Introduction Evaluation  comparing a proposed project with alternatives and deciding whether to proceed with it Normally carried.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Project Detailed Business Case
Chapter 5 Initiating and Planning Systems Development Projects
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
Difference between Quantitative and Qualitative VfM Criteria Owain Ellis 12 June 2008.
Role and Components of Project Evaluation
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
ZHRC/HTI Financial Management Training
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Chapter 11: Project Risk Management
Systems Analysis – ITEC 3155 Feasibility Analysis
Risk Management - ACostE Kate Boothroyd FIRM Director, KB Risk Consulting Limited.
OBJECTIVE - to provide consistent practice and guidance across departments to help those involved in projects, programs, and activities to deliver successful.
Auditing Fair Value Measurements. 2 General Challenges presented to auditors:  Obtain a sufficient understanding of the entity’s processes and relevant.
The aim / learning outcome of this module is to understand how to gather and use data effectively to plan the development of recycling and composting.
Chapter 5 : Initiating and Planning Systems Development Projects.
Business Funding & Financial Awareness CAPITAL BUDETING J R Davies May 2011.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 10 Risk Management Proactively managing the positive.
Prepared by the UBSUP Team Phases Approach of the UBSUP Programme & SafiSan Projects Other Subsequent Phases Phase 2 Phase 1.
© 2005 by Prentice Hall Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Selecting and Designing Concession / PPP Projects Martin Darcy.
Ch 4 - Learning Objectives Scope Management You should be able to: n Discuss the relationship between scope and project failure n Describe how strategic.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Welcome to Session 3 – Project Management Process Overview
The Development of BPR Pertemuan 6 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
Need to Invest Investment Objectives and Case for Change Programme Option Identification and Assessment Analysis Strategic Case: Economic Case: Financial.
SOFTWARE PROJECT MANAGEMENT
Feasibility Study.
Project Risk Management Planning Stage
July 2007 National Quality Assurance and Accreditation Committee & Quality Assurance and Accreditation Project Role of Action Planning in The Developmental.
Software Project Management
Investment decision making
Copyright © 2014 Nelson Education Ltd. 11–1 PowerPoint Presentations for Finance for Non-Financial Managers: Seventh Edition Prepared by Pierre Bergeron.
© The Delos Partnership 2005 Dairygold Workshop Strategic Sourcing Process.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Jacobs Aston Conference 2009 The vital role of local government and PPP capital programmes Chris Wilson Executive Director 4ps 30 th April 2009.
Concept Case Checklist Completion Checklist: Concept Case is no longer than 3 pages. Otherwise, please justify: ___________________. Problem to Be Addressed.
Introduction and Overview
Strategic Information Systems Planning
Analysis Manager Training Module
Chapter 9 Impairment of Assets.
The Feasibility Study: something we already know
Systems Analysis and Design in a Changing World, 4th Edition
SESSION 3a Tuesday 12– Risk Allocation.
Capital Project / Infrastructure Renewal – Making the Business Case
Project Initiation.
Introduction and Overview
TITLE Business Case YOUR LOGO BUSINESS CASE PRESENTATION 00/00/0000
The Role of Private Sector in Capital Budgeting
Presentation transcript:

SESSION 3 Tuesday – Writing the Business Case

Aims of the PPP Business Case To support and justify the case for investment To enable Ministers to decide if the project should proceed as planned To provide a realistic assessment of what is possible, not a list of impractical assumptions and proposals To allow Ministers to decide whether PPP is a better than method than conventional procurement

Aims of the PPP Business Case (cont.) To show that project proposals meet wider strategic and business aims To show why a particular project has been given priority over other possible alternatives To identify the statutory powers on which it is relying for the procurement of a particular service or facility

Contents of the PPP Business Case Summary An explanation of the Ministry’s business need for the scheme in line with the aims of the business case supported by: ▫ A clear definition of the service objectives and the outputs – how the project aligns with the National and Sector Plan ▫ Results of an appraisal of alternative options/scenarios ▫ Indicative costs of the preferred scenario and an initial assessment of value for money and affordability

Contents of the PPP Business Case Summary An explanation of the Ministry’s business need for the scheme in line with the aims of the business case supported by: ▫ A project management plan for project execution ▫ An analysis of the risks and benefits associated with the project scenarios ▫ The cost of the proposed solution ▫ Implementation strategy ▫ Review and approval

Contents (1) Strategic Alignment Project should align with the business plan goals for the Ministry Is the project critical to achieving high impact goals? Identify support for the PPP approach from all stakeholders

Contents (2) Service Objectives/Outputs Objectives must be developed in terms of the outputs which the project is required to deliver Objectives must be clear Outputs must be able to be measured against performance related criteria

Contents (3) Appraising various options/scenarios Find the solution that delivers best value for money All sensible options should be considered A short list of potential options/scenarios should be identified

Contents (3) Appraising various options/scenarios Rank the options according to their costs and against a range of evaluation criteria Include a ‘base case’ or a “Do Nothing/Do Minimum” option to ensure the impact of change can be properly assessed Benefits and drawbacks of main options must be clearly identified

Contents (4) Indicative Costs of the Preferred Scenario Consider the costs and compare the financial merits of different solutions Estimate cost implications of the short-listed options over the project life cycle Costs covered by an appraisal should include ▫ Capital Costs ▫ Running Costs ▫ A valuation of the key Project Risks Costs should be allocated to the project year in which they are expected to occur and discounted to a present value using a relevant discount rate

Contents (4) Indicative Costs of the Preferred Scenario The purpose of discounting is to bring future cash flows to a present day value The selection of a discount rate for the NPV calculations needs care The price level and treatment of costs should be consistent across all options

Contents (4) Preliminary Assessment of Value for Money Value for money must be demonstrated to Ministers for any proposed expenditure The preferred approach must be the most cost effective of the options available The PPP procurement route must be shown to offer the opportunity for better value for money than the public sector comparator

Contents (4) Preliminary Assessment of Value for Money The calculation of an indicative PPP cost is typically done in one of two ways ▫ Identifying the likely level of annual charge, normally through discussion with a potential partner ▫ Converting the cost profile of the public sector comparator to take account of private sector assumptions

Contents (4) Affordability Unless the project is financially free standing, there will be a cost to the Ministry of a PPP project An assessment of this cost must be made as early in the process as possible so that Ministers can approve the procurement

Contents (5) Project Management Plan The PPP Business Case should include a draft Project Management Plan The Project Management Plan should include ▫ Outline project timetable or programme ▫ A definition of the roles of the Project Team members including any advisors ▫ An estimate of resources/officer time required at each stage ▫ Plans, procedures and control processes ▫ Cost control and risk management processes

Contents (6) Risks and benefits The appraisal of options and scenarios should include a thorough assessment of the allocation of risk The extent of risk for each project option/scenario should be identified, clarified and, where feasible, quantified using a risk matrix

Contents (6) Treatment of Specific Risks Costs which have already been incurred or are irrecoverably committed should be ignored in an appraisal Wider economic benefits, such as tax flowbacks to the exchequer should not normally be counted as economic benefits or costs

Content (6) Risk Transfer All projects are subject to uncertainty and risk At the PPP Business Case stage three levels of risk must be addressed ▫ Strategic Risk ▫ Project Risk ▫ Sensitivity Analysis

Contents (6) Strategic Risk Must be identified as part of the overall analysis of business need This will enable high level threats to be assessed and responses developed

Contents (6) Project Risk The Business Case should include a draft catalogue or register of identifiable risks associated with the project Will be developed as the project proceeds to list all the identified project risks Will contain assessments of likely impact and cost consequences and mitigating strategies

Contents (6) Project Risk Only broad assessments of likely impact of risks and consequences may be possible Risk assessment needs to be sufficiently detailed to distinguish between options Risk assessment should outline in broad terms the risk management strategies which will need to be developed

Contents (6) Project Risk Impact of Risk ($) High indicates that the event will have a significant impact on the project Medium indicates that the event will impact on the project Low indicates that the impact on the project will be relatively minor None indicates that the risk will not impact on the project

Contents (6) Project Risk Probability of Risk (%) High indicates that the event is highly likely to occur Medium indicates that the event is likely to occur Low indicates that the event is not likely to occur

Contents (6) Project Risk Expected Value ($) is the weighted average of dollar value impacts High ∑High Impact ($) x Probability (%) + P = low High ∑Medium Impact ($) x Probability (%) + P = low High ∑ Low Impact ($) x Low Probability (%) P = low = Expected Value ($)

Contents (6) Project Risk Allocation Government – Government retains responsibility for managing the risk. Private Sector – Risk is transferred to the Private Sector. They are responsible for managing the risk. Shared – Government and Private Sector shares responsibility for managing the risk

Contents (6) - Project Risk RiskImpact ($)Probability (%)Expected Value ($) Allocation HighMediumLowHighMediumLow PPP Risk 1 / Risk 1 Mitigation Risk 2 / Risk 2 Mitigation Risk 3 / Risk 3 Mitigation Etc. Traditional Risk 1 / Risk 1 Mitigation Risk 2 / Risk 2 Mitigation Risk 3 / Risk 3 Mitigation Etc.

Contents (6) Sensitivity Analysis The appraisal of options will be affected by uncertainty, for example projections of future demand for services Such uncertainties should be dealt with through sensitivity analysis I.E. identify main variables and uncertainties, assess potential range of feasible outcomes and build them into the evaluation of options

Contents (6) Sensitivity Analysis In this way the impact of uncertainty on the ranking of options may be tested The best option will be the most flexible one which continues to deliver the outputs and gives value for money

Contents (6) Sensitivity Analysis Where small variations change the results of the appraisal, the risks are likely to be significant Risk management action should be focused on the most sensitive factors and assumptions Any significant differences in the capacity of the short-listed options to respond to risk should be brought out in the Business Case

Contents (6) Sensitivity Analysis Description of assumption to be changed Base CaseAssumption Change A (e.g. debt/equity ratio) Assumption Change B (e.g. debt/equity ratio) VFM%VFMVFM%VFMVFM%VFM Assumption Change 1 (e.g. credit spread) Assumption change 2 …. Etc.

Contents (6) Benefits It may also be relevant to introduce social costs and benefits Wherever possible, benefits should be quantified, valued in monetary terms and included in the appraisal as a cost saving

Contents (6) Benefits Benefits that cannot be measured and valued may be included by using weighting and scoring techniques The scoring and weighting exercise should be as objective as possible to eliminate bias

Contents (7) The costs of the proposed solution Capital costs Capital costs include land and property, new construction, upgrading, adaptation or refurbishment of existing facilities and assets and major equipment purchases Where land has to be acquired for a project option its market value/purchase price including fees should be included in the appraisal

Contents (7) The costs of the proposed solution Capital costs The cost of land and property should be included in cash flows when purchase is expected The costs of any new construction, including site preparation and infrastructure, should be included in the appraisal

Contents (7) The costs of the proposed solution Running costs Running costs will be a significant cost component over the whole life of the project The appraisal should show running cost elements to highlight the differences between options/scenarios and the proposed solution

Contents (7) Summary cost/benefit template Summary of Quantitative Cost/Benefit Public Sector ComparatorPPP Solution Capital Items Annual Items Leases Programme Building operations Cyclical items Receipts Residual value Total NPV over 25 years

Contents (7) Template for each option Quantitative Analysis – Option 1 Year 0Year 1………….Year 25 Capital Items: Annual Operating Items: Cyclical Items: Receipts: Residual Value: Net Cost (Revenue) Net Present Value (X%)

Contents (6 & 7) Qualitative Analysis - Benefits Improved service quality Increased innovation  more effective and/or efficient delivery of service Additional social and/or economic benefit Risk transfer as a benefit

Contents (6 & 7) Qualitative Analysis - Costs Loss of control or accountability Changes associated with partnering Loss of in-house expertise Risk transfer as a liability

Contents (8) Implementation Strategy Major project phases High-level work plan, deliverables and target dates for completion Costs required to carry out the plan Personnel (departments, roles, competencies) required

Contents (8) Implementation Strategy Outside resources required (advisers, consultants, etc) Proposed implementation project structure Implementation and monitoring of risk mitigation strategies Post-implementation review approach

Contents (9) Review and Approval Who will review the business case? What is the approval process and who is involved? Business case should be signed and dated by the approving person(s) If applicable, approval conditions should be identified If not approved, reason(s) should be documented